Mihama Nuclear Power Plant
The Mihama Nuclear Power Plant (美浜発電所, Mihama hatsudensho, Mihama NPP) is operated by The Kansai Electric Power Company, Inc. and is in the town of Mihama, Fukui Prefecture, about 320 km west of Tokyo.[1] It is on a site that is 520,000 m2 of which 60% is green space.[2] Mihama - 1 was commissioned in 1970.[3]
Mihama Nuclear Power Plant | |
---|---|
Mihama Nuclear Power Plant | |
Country | Japan |
Location | Mihama, Fukui Prefecture |
Coordinates | 35°42′12.51″N 135°57′48.88″E |
Status | Out of service |
Construction began | 1 February 1967 |
Commission date | 28 November 1970 |
Operator(s) | The Kansai Electric Power Company, Inc. |
Nuclear power station | |
Reactor type | PWR |
Cooling source | Nyunoura bay, Sea of Japan |
Power generation | |
Units operational | 1 x 780 MW |
Units decommissioned | 1 x 320 MW 1 x 470 MW |
Nameplate capacity | 780 MW |
Capacity factor | 0% |
Annual net output | 0 GW·h |
External links | |
Website | www |
Commons | Related media on Commons |
Reactors on site
Unit[4] | Reactor type | Average electric output (net) | Electric power rating (gross) | Beginning of construction | First criticality | Commission date | Decommission date [5] |
---|---|---|---|---|---|---|---|
Mihama - 1 | PWR | 320 MW | 340 MW | 1 February 1967 | 8 August 1970 | 28 November 1970 | March 2015 |
Mihama - 2 | PWR | 470 MW | 500 MW | 29 May 1968 | 21 April 1972 | 25 July 1972 | March 2015 |
Mihama - 3 | PWR | 780 MW | 826 MW | 7 August 1972 | 19 February 1976 | 1 December 1976 |
Accidents
1991 accident
On 9 February 1991, a tube in the steam generator of Unit 2 had failed completely. This triggered a SCRAM with full activation of the Emergency Core Cooling System. Eventually, a small amount of radiation was released to the outside.
2004 accident
On 9 August 2004, an accident occurred in a building housing turbines for the Mihama 3 reactor.[1] Hot water and steam leaking from a broken pipe killed five workers and resulted in six others being injured.[1][6][7] The accident, rated at INES Level 0, had been called Japan's worst accident at a nuclear plant[8][9] before the crisis at Fukushima I Nuclear Power Plant.[10][11] The nuclear section was not affected (the turbines housing building is separate from the reactor building).
The Mihama 3 is an 826 MWe, 3-loop Westinghouse type pressurized water reactor (PWR) which has been in service since 1976. The pipe rupture occurred in a 55.9 centimetres (22.0 in) outside diameter pipe in the ‘A’ loop condensate system between the fourth feedwater heater and the deaerator, downstream of an orifice for measuring single-phase water flow. At the time of the secondary piping rupture, 105 workers were preparing for periodic inspections to commence.[12]
A review of plant parameters did not uncover any precursor indicators before the accident nor were there any special operations that could have caused the pipe rupture. An investigation concluded that water quality had been maintained since the commissioning of the plant, however the failing pipe had been omitted from an initial inspection plan and quality management systems were ineffective.[12] Mihama-3 restarted in January 2007 after making changes to "reestablish a safety culture" within KEPCO and obtaining permission from Fukui Prefecture and industry regulators.[13]
Juridical actions against restarting nuclear power plants
In August 2011 citizens of the prefecture Shiga, at the banks of Lake Biwa, started a lawsuit at the Otsu District Court, and asked a court order to prevent the restart of seven reactors operated by Kansai Electric Power Company, in the prefecture Fukui.[14]
Seismic research in 2011 and 2012
On 5 March 2012 a group of seismic researchers revealed the possibility of a 7.4 M (or stronger) earthquake under the Tsuruga Nuclear Power Plant. Before this date the Japanese governmental Earthquake Research Committee and Japan Atomic Power had calculated that the Urasoko fault under the plant, combined with other faults connected to it, was around 25 km long and could cause a 7.2M quake and a 1.7 meter displacement. On top of this, the presence of the oceanic faults were not taken into account by NISA and JAP in the assessment of the safety of the Tsuruga nuclear power plant.
Analysis of sonic survey and other data provided by Japan Atomic Power analysed by a panel of experts of the Nuclear and Industrial Safety Agency showed the presence of multiple faults existing within 2 to 3 km from the Urasoko fault. According to Sugiyama, a member of this group of scientists, these faults were highly likely to be activated together, and this would extend the length of the Urasoko fault to 35 km.
Computer simulations calculating the length of a fault based on its displacement showed the Urasoko fault to be 39 km long, a result close to the length estimated by the sonic survey data, and the fault could cause some five meters of displacement when activated together with other faults.
Yuichi Sugiyama, the leader of this research group of the National Institute of Advanced Industrial Science and Technology, warned that, as other faults on the south side of the Urasoko fault could become activated together, "The worst-case scenario should be taken into consideration."
According to the experts there were many other faults located under one reactor on the west side of the Urasoku fault that could move also simultaneously. If this were confirmed, the location of the Tsuruga nuclear plant would be disqualified.[15]
On 6 March 2012 NISA asked Japan Atomic Power Co. to reassess the worst-case scenario for earthquakes at the Tsuruga Nuclear Power Plant. They were to find out what damage this could do to the buildings on the site, because the Urazoko fault, running around 250 meters from the reactor buildings, could have a serious impact on the earthquake resistance of the power plant. NISA was also planning to send similar instructions to two other nuclear power plant operators in the Fukui area: Kansai Electric Power Company, and Japan Atomic Energy Agency. The Mihama Nuclear Power Plant and the Monju fast-breeder reactor could also be affected by a possible earthquake caused by the Urazoko fault.[16]
Unit 1 and 2 shutdown
Regulation brought about following the March 2011 nuclear disaster forbids the operation of nuclear reactors for more than 40 years. However, plant operators could secure a 20-year operation extension from the Nuclear Regulation Authority if reactors are refitted. For example, these new regulations require utilities to install power cables made from fire-retardant materials.
Kansai Electric determined that it was not economical to invest in the costly refits of the two older reactor units (Mihama 1 and 2) given their comparatively small output, and decommissioned them in March 2015.[17]
Unit 3 life extension to 60 years
Japan's nuclear regulator approved an application to extend the life of Unit 3 through 2036. New regulations would have required the shutdown of Unit 3 by the end of 2016. This is the second such approval granted since the Fukushima disaster.
Restart will happen after safety upgrades are completed by March 2020 and will cost about 165 billion yen ($1.51 billion). The upgrades involve fire proofing cabling and other measures.[18]
References
- "Four killed in nuclear plant accident - World - www.theage.com.au". Retrieved 7 February 2017.
- Kepco (Japanese). Mihama Overview.
- "A Japanese 'first' on nuclear power, Mihama (1970) - on Newspapers.com". Newspapers.com. Retrieved 9 August 2015.
- "PRIS - Home". Retrieved 20 March 2017.
- "WNN".
- Press release from KEPCO Archived 1 March 2011 at the Wayback Machine (in English)
- Mihama Nuclear Power Plant Accident Archived 10 July 2011 at the Wayback Machine
- "BBC NEWS - Asia-Pacific - Japan's shaky nuclear record". Retrieved 7 February 2017.
- "Breaking News, World News & Multimedia". Retrieved 7 February 2017.
- Japan crisis: third explosion raises spectre of nuclear nightmare
- "Accident at Japan nuclear plant". news.bbc.co.uk. BBC News Online. 9 August 2004. Retrieved 9 December 2017.
- Secondary piping rupture at the Mihama Power Station in Japan
- "Restarting Commercial Operation of Mihama Nuclear Power Plant Unit 3". KEPCO. 7 February 2007. Archived from the original on 16 April 2014. Retrieved 16 April 2014.
- The Mainichi Daily News (9 November 2011) Residents seek court order not to restart Tsuruga reactors Archived 12 November 2011 at the Wayback Machine
- The Mainichi Shimbun (5 March 2012)Fault under Tsuruga nuclear plant could trigger M7.4 quake: research Archived 7 March 2012 at the Wayback Machine
- The Mainichi Shimbun (7 March 2012) Quake severity estimate for Tsuruga nuclear plant to be reassessed Archived 8 March 2012 at the Wayback Machine
- "Life-span extension reviews begins for three aging Kepco reactors". The Japan Times Ltd. 2 April 2015. Retrieved 3 April 2015.
- "Japan agrees second nuclear reactor life extension since Fukushima". Reuters. 16 November 2016. Retrieved 22 November 2016.