Odakyū Tama Line

The Odakyu Tama Line (小田急多摩線, Odakyū Tama-sen) is a railway line operated by the private railway operator Odakyu Electric Railway in the Greater Tokyo of Japan. The line extends 10.6 kilometres (6.6 mi) from Shin-Yurigaoka Station in Kanagawa Prefecture to Karakida Station in Tokyo.

Odakyu Tama Line
An Odakyu 4000 series EMU on the Tama Line in July 2007
Overview
Native name小田急多摩線
OwnerOdakyu Electric Railway
LocaleKanto region
TerminiShin-Yurigaoka
Karakida
Stations8
Service
TypeCommuter rail
History
Opened1 June 1974
Technical
Line length10.6 km
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC overhead catenary
Route map
0.0 Shin-Yurigaoka
↑Odawara Line→
1.5 Satsukidai
2.8 Kurihira
4.1 Kurokawa
4.9 Haruhino
Kanagawa-Tokyo boundary
6.8 Odakyū Nagayama
9.1 Odakyū Tama-Center
←Keio Sagamihara Line↑
←Karakida depot
10.6 Karakida

Used for commuter service by the residents of Tama New Town, the largest New Town in Japan, rapid trains are frequent on the line, through to Odakyu's Tokyo terminus at Shinjuku on the Odakyu Odawara Line) or via the Tokyo Metro Chiyoda Line subway with connections onward to the Joban Line. Tama Express trains terminate at Toride Station in Toride, Ibaraki, on the opposite side of Tokyo.[1]

Service patterns

  Express (急行, Kyūkō)
Up to Shinjuku or Ayase on the Tokyo Metro Chiyoda Line. One exception is down from Shin-Yurigaoka. Weekday mornings only.
  Local (各駅停車, Kakueki Teisha)
Mostly in the line only, and some from/to Shinjuku, all day long.



Former Service

  Tama Express (多摩急行, Tama Kyūkō)
All from/to Toride on East Japan Railway Company (JR East) Joban Line via the Chiyoda Line. All day.

Stations

  • Local and Section Semi Express services stop at all stations.[1]
No. Station Japanese Distance (km) Tama
Express
Express Transfers Location
Between
stations
Total
From Shin-
Yurigaoka
From
Shinjuku
Through operation to: Shinjuku Station (Odakyu Odawara Line)
Toride Station (Joban Line) via the Tokyo Metro Chiyoda Line
OH-23 Shin-Yurigaoka 新百合ヶ丘 - 0.0 21.5 Odakyu Odawara Line (for Shinjuku, Odawara) Asao-ku, Kawasaki, Kanagawa Prefecture
OT-01 Satsukidai 五月台 1.5 1.5 23.0  
OT-02 Kurihira 栗平 1.3 2.8 24.3  
OT-03 Kurokawa 黒川 1.3 4.1 25.6  
OT-04 Haruhino はるひ野 0.8 4.9 26.4  
OT-05 Odakyū-Nagayama 小田急永山 1.9 6.8 28.3 Keio Sagamihara Line (Keiō-Nagayama Tama, Tokyo
OT-06 Odakyū-Tama-Center 小田急多摩センター 2.3 9.1 30.6 Keio Sagamihara Line (Keiō-Tama-Center)
Tama Toshi Monorail Line (Tama-Center)
OT-07 Karakida 唐木田 1.5 10.6 32.1  

History

This line was built as a part of Tokyo Line 9, linked with the Tokyo Metro Chiyoda Line and Odakyu Odawara Line.

Odakyu started service on the first section, from Shin-Yurigaoka to Odakyū-Nagayama, on June 1, 1974. It expanded to Tama Center, the central station of Tama New Town, on April 23, 1975. This section was constructed by the national Japan Railway Construction Corporation, since renamed the Japan Railway Construction, Transport and Technology Agency (JRTT)), while Odakyu operated it and paid for the organization. On March 27, 1990, Odakyu opened Karakida station.

The line was constructed as double track, but Odakyu could not take a large part of the transport between Tokyo and Tama New Town. Delay to the quadrupling of the main Odawara Line due to long standing land acquisition conflicts prevented operating extra trains that were to connect the new town and the terminus of Shinjuku.

Rapid train services on the Tama Line began in 2000, and succeeded in increasing the number of passengers, shorting transit time.

References

This article incorporates material from the corresponding article in the Japanese Wikipedia.

  1. 首都圏鉄道完全ガイド 主要私鉄編 [Tokyo Area Complete Railway Guide - Major Private Lines] (in Japanese). Japan: Futabasha. 22 July 2013. p. 12. ISBN 978-4-575-45387-4.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.