Port Management Company
Port Management Company is the Russian stevedore company fulfilling the powers of the sole executive body of the specialized coal sea ports of Russia located in the Far East (Vostochny Port JSC, Wrangel Bay, Primorsky Territory) and in the Baltic Sea region (Rosterminalugol JSC, Ust-Luga, Leningrad region).
Type | Limited Liability Company |
---|---|
Industry | Stevedoring activity, coal ports |
Founded | 2008 |
Headquarters | Moscow, Russia |
Key people | Anton Pyatkov (General Director)[1] Irina Olkhovskaya (Deputy General Director for Prospective Development and Work with Federal Authorities) |
Website | portmanagement.ru |
History
The company was founded on 26 November 2008. Starting from 2009, it has been managing the operational activity of JSC 'Vostochny Port'. Between 2010 and 2015, the equipment of the port and its production processes were updated. Between 2009 and 2016, the annual freight turnover of the port had increased 1.5 times from 14.7 million tonnes to 23.5 million tonnes.[2]
Since 2012, JSC 'Vostochny Port' started the construction of the third stage of the coal terminal, which will be put into operation in September 2017. It will increase the annual terminal capacity up to 39 million tonnes in 2019. The project is funded solely by the company without state financing. The total amount of investment in the project is 27 billion Rubles.[3]
In July 2016, the federal antitrust service satisfied the application of Managing Port Company for the rights to act as the executive body of the coal seaport JSC 'Rosterminalugol'.[4] The freight turnover of JSC 'Rosterminalugol' at the end of 2016 had reached 18 million tonnes.[5]
After the consolidation of specialized assets, the company manages the biggest Russian coal port holding, with total cargo turnover of 41.5 million tonnes of coal per year, which constitutes more than one-third of Russian sea exports of coal. In the year 2019, the total annual freight turnover of specialized coal sea terminals of JSC "Vostochny Port" and JSC'Rosterminalugol' will reach 56.6 million tonnes.[6]
According to information from the Sea Trade Port Association, the freight turnover of the coal port holding company ranks third place among all stevedoring assets with the largest holdings, with 5.8% of the country's cargo turnover.[7]
Stevedoring activity
The coal seaports of the company allow access to more than 30 countries of Europe, the Middle East, the Asia-Pacific region and Latin America. The management of two highly productive coal ports designed for different export markets ensures the prompt switch of cargo flows in case of changes in the world coal market, and it allows for the rhythmic loading of port facilities.
Taking into account the increase in port freight turnover by 20 million tonnes in the future cargo base of JSC 'Vostochny Port' and JSC 'Rosterminalugol', these companies have secured agreements with coal manufacturers from various coal basins. The ports perform the transshipment of coal produced by OJSC 'UK 'Kusbassrazrezugol', JSC 'SUEK', OJSC 'Kuzbasskaya toplivnaya companiya', JSC Russian Coal, CJSC 'Sibuglemet', 'Promugolservice' LLC, CJSC 'Shakhta Belovskaya', 'Razrez Stepanovky' LLC, 'Razrez Bungursky Severny' LLC, 'Razrez Arshanovsky' LLC, "Razrez 'Kiyzassky' LLC, 'Razrez Vostochny' LLC, and other Russian manufacturers.
During the 2nd East Economic Forum (EEF) held in Vladivostok in September 2016, an agreement was signed on the transshipment of coal produced by MC 'Kolmar' for an annual supply of 2 million tonnes of coal starting from 2017, after the commissioning of the third stage of theJSC 'Vostochny Port' terminal.
The policy of the coal port holding is aimed at creating open access to the sea gates of Russia for small, medium, and large coal companies, in order to ensure a competitive environment and dynamic growth of the coal industry for the increase in transshipment and loading of port facilities.[8] The cooperation with JSC 'Russian Railways' in the development of railroad infrastructure and railways in close proximity to ports, as well as the use of innovative high-capacity wagons, which constitute more than 60% of the total volume of transportation of JSC 'Vostochny Port' and JSC'Rosterminalugol', contributes to the increase in cargo turnover at the ports.[9]
Managed companies
JSC Vostochny Port ( Wrangel Bay, Primorsky Territory) is a port with open access, which specializes at the transshipment of coal for export applying automatic conveyor equipment. During 2016, the company reloaded 23.5 million tonnes of products, which constitutes around 30% of the total freight turnover of Far East coal ports and around 20% of the freight turnover of all coal ports in Russia. The volume of transshipment is fully provided by coal produced throughout Russia - in the Kuzbass, Eastern Siberia and the Far East.[10]
For the processing of coal, JSC 'Vostochny Port' uses equipment made by leading world manufacturers. As the result of years of modernization of the specialized coal complex, the stevedore has managed to reach 100% automation of its work processes. It is the only terminal in Primorsky Kray capable of accepting vessels of the capesize-type with a tonnage of up to 180 thousand tonnes. The activity of the port meets the requirements of the international standard ISO 9001:2008 "Quality management systems. Requirements".
The high capacity and speed of cargo processing are achieved by specialized equipment used at every stage. The upload of coal is performed at the upload station equipped with 2 tandem railcar dumpers, machines for wagon defrosting with a capacity of 80 gondolas, a wind protection system with infrared heating of wagons, a drill-flushing complex, conveyor equipment systems and the system for the refilling of frozen coal. Warehousing is carried out by specialized equipment, including 4 reclaimers, 2 stackers, bulldozers, and loaders. The loading of vessels is done with the help of 4 shiploaders (the productivity of each of them reaches 3 thousand tonnes per hour) and other auxiliary equipment.
In 2016, the port installed a multistage system of magnetic coal cleaning developed by the specialists of JSC 'Vostochny Port'. The system is represented by 34 units of high-tech equipment, including 26 magnetic separators, 4 suspended magnets and 4 electromagnetic drums.
The President of the Russian Federation Vladimir Putin initiated investment projects in the port industry in the summer of 2012 in the order to build additional export infrastructure in the Far East, including a coal terminal with open access capacity of at least 20 million tonnes per year. In the autumn of 2012, 'Managing Port Company' LLC made a decision to launch a large-scale investment project for the construction of the third stage of the specialized coal complex of JSC 'Vostochny Port' at its own expense and without any financial burden on the federal and regional budgets. The third stage is the continuation of the existing coal production transshipment complex of JSC 'Vostochny Port' and is a fully automated terminal for reloading coal from railway transport to sea transport, with simultaneous provision of storage and coal processing services.
The project involves the construction of 4 warehouses with a total capacity of 780 thousand tonnes, and 2 docking facilities, as well as equipping the complex with high-tech equipment. Currently, more than 19 billion Rubles have been invested of the planned 27 billion Rubles, an artificial land plot has been created, and a docking facility has been built. The new coal terminal will be equipped with the most productive modern equipment supplied from Japan: two tandem railcar dumpers for innovative high-capacity wagons that allow the unloading of four 70-tonne wagons of coal in just 3 minutes,[11] two stokers, and four reclaimers with a capacity of 3,500 thousand tonnes per hour.[12]
In September 2016, the construction of docking facility No. 51 of JSC 'Vostochny Port', erected as part of the third stage of the coal terminal development project, was completed. During the 2nd Eastern Economic Forum, JSC 'Vostochny Port' was visited by the delegation of the Ministry of Transport of the Russian Federation, headed by Transport Minister Maxim Sokolov, who gave a positive assessment of the project and the degree of its readiness. The implementation of the investment project of the third stage of JSC 'Vostochny Port' will guarantee timely and high-quality processing of the ever-growing coal cargo flows coming from BAM and Transsib and will increase trade with countries of the Asia-Pacific region. During the exhibition, 'Russian Transport-2016' the Russian Prime Minister Dmitry Medvedev becomes acquainted with the implementation of the third stage of the project. The government leader noted that it was a good time to expand port capacities.[13]
In December 2016, JSC 'Vostochny Port' became a resident of the Free Port of Vladivostok. The volume of investment in the project under the agreement with the Corporation for the Development of the Far East will amount to 17.2 billion Rubles, with the prospect of creating 619 jobs. The benefits received by the port due to its residence in the Free Port of Vladivostok will allow for the channeling of additional funds for the development of the company.[14]
The increase in capacity of JSC 'Vostochny Port' with the commissioning of the third stage of the port requires the simultaneous development of the capacity of the railway tracks. JSC 'Russian Railways', 'Managing Port Company' LLC and JSC 'Vostochny Port' jointly modernize the railway lines for public and private use at the station 'Nakhodka-Vostochnaya'. The development program of JSC 'Vostochny Port' provides for the construction of a new private railway park and the large-scale development of a public railway station. The construction of a new range station will increase the volume of wagons received with coal and the departure of empty rolling stock after unloading. The construction of the railway infrastructure is financed by 'Managing Port Company' LLC and JSC 'Vostochny Port'. The size of the investment in the project is 5 billion Rubles. Built for the development of Nakhodka-Vostochnaya, the federal infrastructure will be transferred to JSC 'Russian Railways' free of charge. After the completion of construction, the station's capacity will reach 39 million tonnes per year, counting only the cargo of JSC 'Vostochny Port', without taking into account the cargo of other recipients who will also be able to use the new federal infrastructure.[15]A positive evaluation of the implemented project was given by the President of JSC 'Russian Railways' Oleg Belozerov during the signing of the agreement on cooperation between the transport operator and JSC 'Vostochny Port'.
During the 2nd Eastern Economic Forum, JSC 'Russian Railways'' and JSC 'Vostochny Port' signed the agreement on improving the technology of coal transportation, prioritizing the use of innovative high-capacity wagons for organizing heavy traffic.[16]
Rosterminalugol JSC is the largest specialized coal terminal in the Northwest of Russia, which initiated the development of the seaport of Ust-Luga. In January 2006, in the presence of the President of the Russian Federation Vladimir Putin, the second start-up complex of a coal terminal with a design capacity of 4 million tonnes of coal per year was put into operation. The port accounts for more than 60% of coal transshipment out of the total cargo turnover of ports in the Northwest. In 2016, the freight turnover of Rosterminalugol JSC increased by 3.4% and amounted to 18.1 million tonnes. As of November 23, 2016, 120 million tonnes of coal had been loaded onto the vessel 'Zagreb' since the beginning of the terminal's operation.[17]
The port implements an automated process of transferring coal from rail to sea transport, cleaning coal from accidental inclusions, refining coal to its required fraction, and continuous sampling of coal products immediately before loading. Rosterminalugol JSC has implemented an information system that allows for the monitoring of production processes, the maintenance of operational records and the exchange of information with JSC 'Russian Railways' in real time. The largest cargo receivers are Norway, Great Britain, Germany, Spain, Italy, Slovenia, Finland, Brazil, Israel, Turkey and other countries.
The port uses automated equipment: railcar dumpers, stackers, reclaimers, a conveyor system, shiploaders, a multistage magnetic coal cleaning system and automatic sampling devices. All the main centers of the terminal are equipped with a video surveillance system. The unloading of wagons with coal in Rosterminalugol JSC is carried out with the help of two modern high-tech railcar dumpers, which allow for the unloading of 4 gondolas simultaneously in less than 3 minutes. At the same time, the rolling stock does not suffer any mechanical damage, which is possible with clamshell unloading. In order to quickly organize empty stock on the terminal routes for the first time in Russia, transborders were used and successfully operated. With their assistance it is possible to accelerate the supply of rolling stock to several parallel tracks without the use of additional switches. The specialized coal terminal uses devices for defrosting wagons equipped with infrared emitters in order to ensure the uninterrupted unloading of loaded wagons in wintertime. Next, unloading coal lands on a conveyor belt through a grid with cells 280 mm in diameter. Further, after passing through the aspiration facility, according to the conveyor system, coal is automatically transported to either one of the four warehouses or directly to the ship, depending on the loading scheme.
The loading of vessels is carried out by two high-performance ship loading machines on two docking facilities, which allow for the simultaneous handling of two panamax class vessels.
The increase in the port's freight turnover remains one of the main goals of the terminal, in addition to the increase in quality of services provided: ensuring an uninterrupted chain of supply and shipment to the most efficient types of vessels for the development of new routes to supply Russian coal. The sorting facility of the Luzhskaya-Sortirovochnaya rail station installed by JSC 'Russian Railways' plays an important role in this process.[18]The port employs new technology connected with the protection of environment and health of employees.[19]
Port environment
Port Management Company and its managed ports implement a long-term program to improve the environmental safety of stevedoring activities. Rosterminalugol JSC and JSC 'Vostochny Port' have undertaken obligations to ensure compliance with international ecological standards.
The ecological safety of ports is ensured iconformity with ISO 14001:2004 'Ecological management systems. Transshipment of cargo in seaports'.
A strong aspiration system works all day in the railcar dumper zone at the specialized coal complex JSC 'Vostochny Port'. 21 facilities for air cleaning and 8 local facilities for wastewater treatment are constantly working in the port, allowing wastewater to reach indicators established for fisheries. The inspections of tests of air and water in the bay area confirm that ecological indicators remain within normal range.[19]Upon request by JSC 'Vostochny Port', annual kelp, trepangs, scallops and hatchlings of keta are grown. All cultivated marine inhabitants are released into the coastal water of the Peter the Great Gulf.[20]
In order to prevent a negative impact on water bodies and encourage ecological recovery and maintenance of the region of the Baltic sea in accordance with international treaty HELCOM(Convention on the protection of water environment of Baltic Sea adopted in 1992 in Helsinki), JSC 'Rosterminalugol' upgrades the complex of cleaning facilities. They will seek to minimize the volume of wastewater and ensure its high-tech cleaning.[21] In December 2016, Rosterminalugol JSC completed the reconstruction of cleaning facilities and systems for cleaning water. A new automatized cleaning system installed at the port uses the technology of dispersion-reactive nanoflotation. It brings mixed domestic and storm sewage to optimum values at the maximum permissible standards for wastewater and completely cleanses gutters of coal dust and substances of organic origin. The level of chemical cleaning reagents in the system has been significantly reduced, and the high effectiveness and compactness of the building allows for the reduction of power consumption.[22] Environmental engineers work at the terminal, and environmental monitoring and audits are implemented on a regular basis. The company takes care to replenish bio-resources by organizing tree planting. In addition, in November 2016, under the initiative and at the expense of Rosterminalugol, more than 1,300 two-year-old bulltrout fish were released into the river Svir. The total amount of investment of the port in ecological enterprises between 2014 and 2016 was more than 200 million Rubles.[23]
In December 2016, JSC 'Vostochny Port' and Rosterminalugol JSC signed а five-year-long agreement on cooperation in the field of increasing ecological safety and ecological education of people with the administrations of the municipal bodies of Primorsky Krai and Leningrad Oblast.[24]
Social responsibility
'Managing Port Company' LLC and JSC 'Vostochny Port' finances the opening of the first oncology department in the city hospital of Nakhodka, Primorsky Krai, in November 2016. It will provide a complex for medical services for patients of the city and nearby settlements in one place. The hospital has been renovated, and modern endoscopic equipment has been purchased and installed. The new polyclinic department has its own registry, two doctor's offices, a small operating room, a staff room, a procedural clinic for cytostatics, and a day hospital with five beds, which will be maximally used in two shifts. The department will work as the regional oncological center for the population of neighboring cities and districts.[25]
References
- Prime. “Anton Pyatkov Appointed on the Position of the General Director of “Port Management Company”, 05.10.16, http://1prime.ru/News/20161005/826614794.html
- Russian Railways-Partner. “System Approach to Management by the Coal Ports of Russia”, 18.11.16, author – Marina Ermolenko.
- IA PortNews. “The Aggregate Freight Turnover of “Port Management Company” for 9 Months of the Year 2016 Has Made 30,9 Mln Tons”, 13.10.16, http://portnews.ru/news/227877/
- Morskie Vesti of Russia (Sea News of Russia). “Kuzbassrazrezugol” Consolidates the Stevedoring Assets”, 12.08.16, http://morvesti.ru/detail.php?ID=57596
- Russian Railways-Partner. “System Approach to Management by the Coal Ports of Russia”, 18.11.16, author – Marina Ermolenko.
- IA PortNews. “The Aggregate Freight Turnover of “Port Management Company” for 9 Months of the Year 2016 Has Made 30,9 Mln Tons”, 13.10.16, http://portnews.ru/news/227877/
- TASS. “Rating of Stevedoring Assets of the Largest Holdings of the Russian Federation in Relation to the Freight Turnover”, 17.10.16, http://tass.ru/transport/3710968
- Russian Railways-Partner. “System Approach to Management by the Coal Ports of Russia”, 18.11.16, author – Marina Ermolenko.
- Lenta.ru. „Car Artillery“, 21.12.16, https://lenta.ru/articles/2016/12/20/wagons/
- RIA DEYTA. “Vostochny Port” Increased the Freight Turnover in November”, 11.12.16, http://deita.ru/news/economy/11.12.2016/5177974-vostochnyy- Archived 2016-12-26 at the Wayback Machine port-v- noyabre-uvelichil- gruzooborot/
- IA PortNews, “Marubeni Corporation Shipped Two Tandem Car Dumpers for the Coal Terminal of “Vostochny Port”, 01.12.16, http://portnews.ru/news/230546/
- 12 IA PortNews, “Assembly of the Large Transferring Machines of the Third Stage of “Vostochny Port” Was Completed”, 01.12.16, http://portnews.ru/news/230545/
- RIA PrimaMedia. “Dmitry Medvedev Wished Luck in the Construction of the Third Stage of “Vostochny Port” in Nakhodka”, 06.12.16, http://primamedia.ru/news/554082/
- Moskovskiy Komsomolets # Vladivostok (vlad.mk.ru), “Vostochny Port” Launches the New Investment Project in the Free Port Vladivostok”, 20.12.16, http://vlad.mk.ru/articles/2016/12/20/vostochnyy-port-zapuskaet-novyy-investicionnyy-proekt-v-svobodnom-portu-%5B%5D vladivostok.html
- Gudok. “Modernization Project of the Coal Terminal of “Vostochny Port” JSC Got the Prime Minister Interested”, 05.12.16, http://www.gudok.ru/infrastructure/?ID=1358129
- Russian Railways-Partner. “System Approach to Management by the Coal Ports of Russia”, 18.11.16, author – Marina Ermolenko.
- Morskie Vesti (Sea News) (morvesti.ru), “Freight Turnover of the Largest Russian North-West’s Coal Terminal Has Increased to 16,4 Mln Tons for the Period of 11 Months”, 12.12.2016, http://morvesti.ru/detail.php?ID=59999
- IA PortNews, "Rosterminalugol" is preparing all customers for the quality and volume of coal", 25.10.16
- Russian Railways-Partner, “Terminal Laid the Foundation of Development of Ust-Luga Sea Trade Port”, 18.11.16, author – Tatiana Simonova.
- Russian Railways-Partner “Sea Ports. Innovations in Coal Handling”, 18.11.16, author – Marina Ermolenko.
- IA PortNews. “Rosterminalugol” Sent 80 mln Roubles for Ecological Program for 10 Months of the Year 2016, 11.11.16, http://portnews.ru/news/229402/
- Morskie Vesti of Russia (Sea News of Russia). “Rosterminalugol” Completes the Reconstruction of the Waste Treatment Facilities”, 18.11.16, http://morvesti.ru/detail.php?ID=59540
- Morskie Vesti of Russia (Sea News of Russia). “Rosterminalugol” Completes on Cooperation in the Field of Ecological Safety for 5 Years”, 13.12.16, http://morvesti.ru/detail.php?ID=60024
- IA PortNews. “Economy and Ecology of Coal Terminals Are Inseparable”, 09.12.16, http://portnews.ru/comments/2242/ Tikhookeanskaya Rossiya (Pacific Russia). “Ecological Five-Year Plan is Waiting for the Eastern Port and Administration of Nakhodka”, 14.12.16, http://to-ros.info/?p=44016
- Nakhodka Info. “Primary Oncological Department is Opened in Nakhodka City Hospital”, 29.11.16, http://nakhodka.info/news/society/pervichnoe_onkologicheskoe_otdelenie_otkryto_v_nakhodkinskoy_gorodskoy_bolnitse/ Archived 2016-12-26 at the Wayback Machine