Yangluo Line
Yangluo Line of the Wuhan Metro was opened on 26 December 2017.[1][2]
Yangluo Line | |
---|---|
Yangluo | |
Overview | |
Other name(s) | Line 21[1] |
Status | Operational |
Owner | Wuhan |
Locale | Wuhan, Hubei |
Termini | Houhu Boulevard Jintai |
Stations | 16 |
Service | |
Type | Rapid transit |
System | Wuhan Metro |
Services | 1 |
Operator(s) | Wuhan Metro Group Co., Ltd. |
Rolling stock | CRRC Zhuzhou Locomotive Chinese Type A |
History | |
Opened | 26 December 2017 |
Technical | |
Line length | 34.575 km (21.48 mi) |
Number of tracks | 2 |
Character | Underground and Elevated |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
It is the seventh line of the Wuhan Metro to be opened since its creation.
History
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Houhu Boulevard — Jintai | 26 December 2017[1] | 34.575 km (21.48 mi)[3] | 16 | Phase 1 |
Stations
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Zhongyi Road | 中一路 | 8 12 | Jiang'an | ||
Wuhan University for the Aged | 老年大学 | ||||
Houhu Boulevard | 后湖大道 | 3 | 0.000 | 0.000 | |
Baibutinghuayuan Road | 百步亭花园路 | 0.985 | 0.985 | ||
Xinrong Long-Distance Bus Station | 新荣客运站 | 1 [lower-alpha 1] | 1.759 | 2.744 | |
Xingfuwan | 幸福湾 | 2.042 | 4.786 | ||
Zhujiahe | 朱家河 | 2.351 | 7.137 | ||
Shenjiaji | 谌家矶 | 0.881 | 8.018 | ||
Qinglong | 青龙 | 3.164 | 11.182 | Huangpi | |
Gaoche | 高车 | 2.294 | 13.476 | ||
Wuhu | 武湖 | 2.230 | 15.706 | ||
Shakou | 沙口 | 4.628 | 20.334 | ||
Junmincun | 军民村 | 3.785 | 24.119 | Xinzhou | |
Wuhan Bioengineering Institute | 武生院 | 1.018 | 25.137 | ||
Yangluo | 阳逻 | 2.787 | 27.924 | ||
Yangluo Development Zone | 阳逻开发区 | 1.460 | 29.384 | ||
Shigang | 施岗 | 3.232 | 32.616 | ||
Jintai | 金台 | 1.959 | 34.575 | ||
Future Development
A 3.2 km extension with 2 stations is under planning.[4]
Notes
- Out of system transfer via Xinrong.
References
- "武汉轨道交通阳逻线(21号线)通车". 2017-12-26.
- "武汉轨道交通阳逻线今日通车". 2017-12-26.
- "Wuhan opens 55km of new metro lines". International Railway Journal. 2017-12-28. Retrieved 2020-09-23.
- "武汉市地铁四期建设规划调整(2019-2024年)公示". Retrieved 2021-01-13.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.