Adelaide Metro A-City Class 4000

The Adelaide Metro A-City 4000 Class is a class of electric multiple unit trains built by Bombardier Transportation, Dandenong for the electrified Adelaide Metro rail network. This class were the first, and currently only, electric trains to have operated in South Australia.

Adelaide Metro A-City 4000 Class
4004/4008 at Mile End in October 2019
Interior of a passenger car
ManufacturerBombardier Transportation
Built atDandenong
Replaced2000 class railcars
Entered service2014-present
Number under construction12 sets
Number built22 sets (12 set under construction)
Number in service22 sets
Formation3-car sets (driving motor, trailer, driving motor); coupled into 6-car sets for special events
Fleet numbers4001-4034
Capacity540 (240 seated, 300 standing)
Operator(s)Adelaide Metro
Depot(s)Seaford Meadows
Line(s) servedGawler (From early 2022)
Seaford
Flinders
Specifications
Car lengthDriving cars: 25.26 metres
Trailers: 24.96 metres
Width3.05 m (10 ft 18 in)
Height4.01 m (13 ft 1 78 in)
Floor height1,200 mm (3 ft 11 14 in)
Doors12
Wheel diameter920 mm (36.22 in) / 850 mm (33.46 in) (new/worn)
Maximum speed110 km/h (68 mph)
Traction system8 x 200kW per three car set[1]
Acceleration0.8 m/s2 (2.6 ft/s2)
Deceleration1.12 m/s2 (3.7 ft/s2)
Electric system(s)25 kV AC overhead lines
Current collection methodPantograph
Coupling systemScharfenberg
Track gauge1,600 mm (5 ft 3 in)

History

In March 2011, Bombardier Transportation was awarded a contract to build 22 three-carriage trains for the Adelaide rail network, that was in the process of being electrified.[2][3][4]

The design uses a similar shell to that of the V/Line VLocity diesel multiple unit trains, introduced in 2004. The first of the Adelaide trains was delivered in July 2013, and entered service on 23 February 2014.[5][6][7][8][9] The last was completed in October 2015.[10][11] The trains currently operate services on the Seaford and Flinders lines.[12]

When they were ordered, it was proposed that the Gawler line would be electrified, which would allow the trains to access Adelaide Metro's Dry Creek depot. However, before they were delivered, that project was cancelled. Whilst light maintenance is performed at their primary stabling point at Seaford, heavy maintenance needs to occur at Dry Creek. When required, each train is hauled there from Adelaide station by a pair of 3000 class railcars. When the Gawler Line is electrified to Salisbury in 2021, that movement will cease.[13] In June 2019, a further 12 train sets were ordered and were due to be delivered in mid-2020.[14]

Operation

The sets primarily operate on the Seaford and Flinders lines, as well as the Showground Shuttle services between Adelaide and Goodwood during the Royal Adelaide Show. During major events, such as AFL matches, two sets are coupled to form a six-car set. That causes problems at some stations on the Seaford line, including Mile End, Marion and Hove, which only accommodate a maximum of five cars. To allow for those stations to be served despite the train length, the doors of the rear car are isolated to prevent unsafe alighting.

References

  1. "Adelaide A-City EMU" (PDF). Fact Sheet. Archived from the original (PDF) on 2 May 2013. Retrieved 14 June 2018.
  2. "Bombardier preferred supplier for Adelaide's electric trains" Railway Digest January 2011 page 6
  3. Bombardier Wins Contract to Supply 25 kV Railcars for Adelaide, Australia Archived 4 October 2011 at the Wayback Machine Bombardier Transportation 31 March 2011
  4. Bombardier scores Adelaide rail contract Archived 22 February 2014 at the Wayback Machine Rail Express 6 April 2011
  5. First of 22 Bombardier electric trains to arrive in Adelaide this week Adelaide Advertiser 14 July 2013
  6. Bombardier delivers on train contract Dandenong Star Community 25 July 2013
  7. Adelaide's new A-City Class 4000 class electric trains have arrived! Archived 27 January 2014 at the Wayback Machine Department of Planning, Transport & Infrastructure
  8. The Seaford line is now electrified Archived 13 April 2014 at the Wayback Machine Department of Planning, Transport & Infrastructure
  9. "Seaford Rail Extension opens for business" Railway Digest April 2014 page 16
  10. Bombardier Complete $220 Million Project for South Australia South East Melbourne Manufacturers Alliance 19 October 2015
  11. "Bombardier completes Adelaide EMU project" Track & Signal January 2016 page 82
  12. "Adelaide's A-City EMU Surburban Trains" Railway Digest December 2014 pages 44/45
  13. $615m Gawler electrification deal signed Rail Express 22 January 2018
  14. Adelaide A-City fleet expansion Metro Report International 2 July 2019
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.