Ankeng light rail
The Ankeng Light Rail (Chinese: 安坑輕軌; pinyin: Ānkēng Qīngguǐ) (code K) is a light rail transit (LRT) system under construction in Xindian District, New Taipei City, Taiwan.[2][3] The route will run from Shuangcheng, joining terminating at Shisizhang where it is to link with the planned Circular line. The line is known in the New Taipei Metro system as the Khaki line, or line K.[4] The line is expected to open in 2021, although some construction work isn't expected to finish until the end of 2022. [5][6][7][8] The rolling stock for the line will be produced in Taiwan.[9]
Ankeng Light Rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | Ankeng Light Rail Transit System | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Under Construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | New Taipei City, Taiwan | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 9 (9 under construction) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Light rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | New Taipei Metro Co. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 7.67 km (4.77 mi)[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | Standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The trains for the Ankeng line will be in the shape of a partially battery powered tram service, most likely the same type of trams used for the Danhai light rail. Construction started around April 2016 and is well away on the road level part between station K01 and K05, with the first tracks having been laid in November 2018. A depot will also be located just past station K01, near Antai Road. A large part of the depot appears to be inside a mountain, with three large tunnels going through the mountain and a train yard on the other side of the mountain. The train yard construction site is clearly visible on Google Maps. As of December 2020 the line was 74.94% complete and several of the ground level stations were close to completion in September of 2020. The elevated section is still only partially done at this time and the bridge over the Xindian river should be complete by the end of the year.
Stations
(Stations’ names are to be confirmed except Shisizhang station.)
Code | Station Name | Transfer | Districts | |
---|---|---|---|---|
English | Chinese | |||
K01 | Shuangcheng | 雙城 | Xindian | |
K02 | Rose China Town | 玫瑰中國城 | ||
K03 | Taipei Xiaocheng | 臺北小城 | ||
K04 | Cardinal Tien Hospital Ankang Branch | 耕莘安康院區 | ||
K05 | Jinwen University of Science and Technology | 景文科大 | ||
K06 | Ankang | 安康 | ||
K07 | Sunrise Sports Park | 陽光運動公園 | ||
K08 | Xinhe Elementary School | 新和國小 | ||
K09 | Shisizhang | 十四張 | ||
References
- 新北市政府. "安坑線路線說明". Archived from the original on 2017-09-26. Retrieved 2017-06-19.
- 新北市政府. 安坑線輕軌運輸系統暨周邊土地開發綜合規劃報告書. Retrieved 2019-02-03.
- "Department of Rapid Transit Systems-Network-Approved MRT Routes". New Taipei City Government. 2019-01-23.
- "捷運路線清楚又便利!學問就在顏色上!" (in Chinese). New Taipei City Government. 2018-04-18.
- 新北市政府. "安坑輕軌" (in Chinese). Retrieved 2017-06-19.
- "安坑輕軌工程今動土 預計110年完工" (in Chinese). 自由時報. 2016-05-18. Retrieved 2017-06-19.
- 賴月貴 (2017-04-26). "安坑輕軌簽約創內需 錢台灣人自己賺" (in Chinese). 大紀元. Retrieved 2017-06-19.
- "〈台北都會〉安坑輕軌土建4/6動工 110年底完工" (in Chinese). 自由時報. 2016-03-29. Retrieved 2017-06-19.
- 李珣瑛 (2017-04-26). "台灣車輛與中鋼簽約 承接安坑輕軌車體工程". 聯合報. Retrieved 2017-06-25.