Brookland–CUA is a Washington Metro station in Washington, D.C., on the Red Line. Service began on February 3, 1978.[2] The station serves the Brookland neighborhood and the Catholic University of America. It is the focal point of an upcoming transit-oriented development project. .

Brookland – CUA
rapid transit station
This picture shows the curve in the station's platform.
Location801 Michigan Avenue, NE, Washington, D.C.
Coordinates38.933234°N 76.994544°W / 38.933234; -76.994544
Owned byWMATA
Platforms1 island platform
Tracks2
Connections Metrobus: 80, G8, H1, H2, H3, H4, H6, H8, H9, R4
CUA Shuttle: Blue, Green[1]
ACHS Shuttle: Brookland Metro
Metropolitan Branch Trail
Construction
Structure typeSurface
Parking27 metered parking spaces
Bicycle facilities10 racks, 16 lockers
Disabled accessYes
Other information
Station codeB05
History
OpenedFebruary 3, 1978 (February 3, 1978)[2]
Previous namesBrookland (1978–79)
Passengers
20175,468 daily[3] 3.6%
Services
Preceding station Washington Metro Following station
Rhode Island Avenue–Brentwood Red Line Fort Totten
toward Glenmont

History

The station opened on February 3, 1978. Originally simply known as "Brookland," in 1979 its name was changed to "Brookland–CUA" due to the proximity of The Catholic University of America to the station.[4]

In the summer of 2018 from July 21 to September 3, the station was shut down for platform repairs due to settling of the platform and decaying concrete caused by salty de-icer used in the winter.[5]

Transit-oriented development

Brookland–CUA station is slated to be the center of a massive transport-oriented regeneration with the aim of increasing pedestrian-friendly development and an arts-focused neighborhood.[6] The project includes a relocation of the station portals slightly to the south in a plaza with the western end of 9th, Newton, and Otis Streets which will be extended to the station plaza for more convenient access to the rest of the surrounding area.[6]

In August 2014, Metro picked a joint venture involving MRP Realty and CAS Riegler LLC to begin the redevelopment of the 1.8 acres (7,300 m2) site. The plan called for construction of 280 apartments and condominiums; 9,000 square feet (840 m2) of ground-floor retail, 228 parking spaces, and the replacement of Metro's 38-space Kiss & Ride lot. Metro proposed a 98-year lease that included rent increases, and required the joint venture to seek approval of its plans from the District of Columbia Zoning Commission. At that time, Metro said ground would break on the redevelopment in 2016.[7]

But in January 2015, the joint venture said it would take at least four years before it could complete its plans and obtain zoning commission approval, and that it would not be able to sign a lease until 2019.[7]

Station layout

The station has one slightly curved island platform. This curve requires mirrors to be placed on the westbound side of the platform to aid train operators in making sure the area is clear before closing the doors. Brookland–CUA also has a relatively uncommon layout; passengers entering the station first take escalators, stairs, or an elevator down to a lower level which includes the station's fare gates and ticket machines, before using escalators or elevators to go back up to reach the platform level.

Like Takoma, Fort Totten, and Silver Spring, Brookland–CUA is located in the middle of the CSX Metropolitan Subdivision rail line. There are two tracks to either side of the island platform, with Metro trains use the inner tracks and Amtrak and MARC Trains using the outer tracks.

P
Platform level
Westbound      Capitol Limited does not stop here
     Brunswick Line does not stop here
Westbound toward Grosvenor–Strathmore or Shady Grove (Rhode Island Avenue–Brentwood)
Island platform
Eastbound toward Silver Spring or Glenmont (Fort Totten)
Eastbound      Capitol Limited does not stop here
     Brunswick Line does not stop here →
G Street level Exit/entrance, buses, parking
M Mezzanine Fare control, ticket machines, station agent

Notable places nearby

References

  1. "CUA Shuttle Bus Schedule" (PDF). CUA Department of Public Safety. Retrieved March 28, 2018.
  2. Johnson, Janis (February 4, 1978). "Exuberant Crowd Celebrates Metro's Arrival in Maryland". The Washington Post. p. B1.
  3. "Metrorail Average Weekday Passenger Boardings" (PDF). WMATA. Retrieved July 31, 2018.
  4. Eisen, Jack (August 7, 1979). "Zoological Park Subway Stop Name, 9 Others Changed by Metro Board". The Washington Post. p. C5.
  5. Pascale, Jordan (July 20, 2018). "Why Metro Is Shutting Down Those Two Red Line Stations". DCist. Retrieved August 3, 2020.
  6. "Brookland/CUA Metro Station Small Area Plan" (PDF). DC Office of Planning. Retrieved March 28, 2018.
  7. Neibauer, Michael (January 7, 2015). "Half a decade away: Brookland Metro redevelopment pushed to late 2019". Washington Business Journal. Retrieved January 7, 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.