Cantonment MRT station
Cantonment MRT station is a future underground Mass Rapid Transit (MRT) station on the Circle line (CCL), situated in Bukit Merah planning area, Singapore, along Everton Road near the junction of Spottiswoode Park Road. This station is part of Stage 6 of the Circle line which will "close the circle" between the HarbourFront and Marina Bay stations.
CC31
Cantonment 广东民 கெண்டொன்மன் Cantonment | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | |||||||||||
Construction site of Cantonment station in 2020 | |||||||||||
Location | 100 Everton Road Singapore 089395 | ||||||||||
Coordinates | 1.272814°N 103.836659°E | ||||||||||
Operated by | SMRT Trains Ltd (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 1 | ||||||||||
Parking | Yes | ||||||||||
Bicycle facilities | Yes | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opening | 2025 | ||||||||||
Electrified | Yes | ||||||||||
Previous names | Old Railway Station, Spottiswoode Park[1] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Cantonment Cantonment station in Singapore |
The station is built underneath and will be integrated with the historic Tanjong Pagar railway station, which ceased operations on 1 July 2011.[2] Once construction is completed in 2025, this station will provide MRT access to the future Greater Southern Waterfront development.
History
External image | |
---|---|
Artist impression of Cantonment station Source: LTA |
The station was first announced on 29 October 2015 as part of the Stage 6 of the Circle line.[3] Contract 883 for the construction of Cantonment station was awarded to China State Construction Engineering Corporation Limited (Singapore Branch) at a sum of S$205 million (US$148.55 million) in November 2017. Construction began that year, with expected completion in 2025.[4][5][6]
In November 2017, the old train platform canopy structures were relocated to facilitate construction works of the station to a restoration yard nearby.[7] In March 2018, the Land Transport Authority (LTA) has temporarily dismantled part of the platforms in Tanjong Pagar railway station to make way for the construction of Cantonment MRT station and is working with a heritage consultant and members of the heritage community on possible solutions for the affected platforms.[3][6][8][9]
Station details
Station design
When completed, the station is expected to be integrated with the Tanjong Pagar railway station. The affected canopy structures is expected to be reinstated to their original locations once the station is finished.[7] The size of the station will be 162 metres (531 ft) by 50 metres (160 ft) by 27 metres (89 ft) with three levels.[10][11]
References
- "LTA | News Room | News Releases | Vote for Names of Circle Line 6 Stations". www.lta.gov.sg. Archived from the original on 15 July 2020. Retrieved 15 July 2020.
- "Closing the loop on Circle Line in 2025 with 3 new stations: Keppel, Cantonment, Prince Edward, Transport News & Top Stories - The Straits Times". web.archive.org. 20 September 2019. Archived from the original on 20 September 2019. Retrieved 20 September 2019.
- "News Room - News Releases - Joint Release by the Land Transport Authority (LTA) & SLA - Circle Line 6 – Becoming A Full Circle". LTA. 29 October 2015. Archived from the original on 15 May 2020. Retrieved 30 October 2020.
- "Circle Line's Cantonment MRT station contract goes to China State Construction for $205m, Transport News & Top Stories - The Straits Times". 20 September 2019. Archived from the original on 20 September 2019. Retrieved 20 September 2019.
- "News Room - News Releases - LTA Awards Final Construction Contract for Circle Line 6". LTA. 10 November 2017. Archived from the original on 30 October 2020. Retrieved 30 October 2020.
- "Upcoming Projects - Rail Expansion - Circle Line 6". LTA. 12 June 2020. Archived from the original on 20 September 2019. Retrieved 30 October 2020.
- "News Room - News Releases - Factsheet: Circle Line 6 Construction to go into Full Swing". LTA. 29 March 2018. Archived from the original on 30 October 2020. Retrieved 30 October 2020.
- "With final 3 stations, Circle Line will come 'full circle' by 2025". Channel NewsAsia. 29 October 2015. Archived from the original on 9 August 2016. Retrieved 15 September 2016.
- "Work to preserve Tanjong Pagar Railway Station on track". The Straits Times. 30 March 2018. Archived from the original on 7 April 2018. Retrieved 13 October 2018.
- "LTA awards final construction contract for Singapore CCL 6". Home Page. 10 November 2017. Retrieved 30 October 2020.
- C883 Cantonment Station (Infographic poster at CCL6 Project Information Centre). Singapore: Land Transport Authority (LTA). 2020.