CapeFlyer
The CapeFlyer (stylized CapeFLYER) is a passenger rail service in Massachusetts between Boston and Cape Cod that began in 2013. It is operated by the Cape Cod Regional Transit Authority (CCRTA) in collaboration with the Massachusetts Bay Transportation Authority (MBTA) and the Massachusetts Department of Transportation (MassDOT). The service runs on the weekends, beginning Friday evenings and including holidays, between Memorial Day weekend and Labor Day weekend.
A CapeFlyer train crossing the Cape Cod Canal Railroad Bridge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Service type | Regional rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Southeast Massachusetts | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Predecessor |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
First service | May 24, 2013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Current operator(s) | CCRTA using MBTA trains | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ridership | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Start | South Station | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
End | Hyannis Transportation Center | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Distance travelled | 78 miles (126 kilometres) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Average journey time | 2 hours 19 minutes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service frequency | Friday, Saturday, and Sundays, Memorial Day–Labor Day | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
On-board services | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Disabled access | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 8 1⁄2 in (1,435 mm) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track owner(s) | MBTA, MassDOT | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
During 2013, its first season, the CapeFLYER carried a total of 16,586 passengers, with service extended from Labor Day to Columbus Day weekend due to its early success.[1] In October 2013, MassDOT announced the service would return in 2014 and become a permanent seasonal service. Two additional stops were added in the subsequent years, with a stop in Wareham added in 2014[5] and a station in Bourne added in 2019. Year-round weekend service over the route and full MBTA Commuter Rail service as far as Buzzards Bay are under consideration.[5][6]
It is the first scheduled passenger train to Cape Cod since Amtrak's Cape Codder ceased operation in 1996, and the first direct service between South Station in Boston and Cape Cod since 1961.[7] The Cape Cod & Hyannis Railroad operated scheduled service between Braintree station, south of Boston (the southern terminus of the MBTA's Red Line), and the Cape from 1984 until 1988, but did not extend that service to Boston proper.
Route
The CapeFLYER utilizes the MBTA Middleborough/Lakeville Line from Boston's South Station to Middleborough and continues to Hyannis via the Cape Cod Canal Railroad Bridge and the Cape Main Line, a state-owned rail corridor. The corridor is also used for freight by the Massachusetts Coastal Railroad, and heritage service provided by the Cape Cod Central Railroad.[8]
Scheduled travel time between Boston and Hyannis, a distance of 78 miles, is about 2 hours and 20 minutes.[9] The relatively slow running time is due to the track conditions between Buzzards Bay and Hyannis, which limits the speed of passenger trains on the Cape to 30 miles per hour.[8] Extensive track rehabilitation was completed in early 2013, resulting in faster operating speeds between Middleborough and Buzzards Bay.[10][11]
The Cape Cod Canal separates Cape Cod from the mainland and only two highway bridges cross it, the Sagamore and Bourne Bridges. Plans for a third highway bridge have stalled.[12] Severe traffic jams are common at peak periods. The CapeFlyer, by crossing the canal over a separate railroad bridge, avoids this congestion.[13]
Fare and ticket information
The adult fare between Boston and Hyannis is $22 one-way and $40 round-trip. CapeFLYER tickets, which are unreserved, can be purchased at the ticket office in South Station or on board the train at no additional cost, as well as being purchased with the MBTA mTicket App.[10][14]
On-board services
On-board concessions, including beer and wine, are sold in the Cafe Car.[15] A designated bicycle car offers storage and maintenance for passengers' bicycles, and free wireless internet service is also available aboard the entire train.[16]
History
Early railroads on Cape Cod
The first passenger train, which was operated by the Cape Cod Railroad Company, arrived in Hyannis on July 8, 1854. It is said that the train was met by a crowd estimated at 3,000. Immediately the line started running three trains a day to and from Boston.[17]
Year-round direct passenger service between Boston and Hyannis continued until June 30, 1959 when the New York, New Haven & Hartford Railroad (NH) ended passenger service on its Old Colony division.[17] Up until that time, daily passenger service between Boston and Cape Cod had been operated to both Hyannis and Woods Hole with trains such as The Cranberry, The Sand Dune, and The Buttermilk Bay[18] Service to Provincetown ended in 1941.[19] The bridge over the Neponset River between Dorchester and Quincy burned soon after, preventing the quick return of service on the Old Colony Main Line.
The New Haven's trains operated year-round trains from Boston to the Cape. However, the railroad's trains made stops at several stations eliminated from present-day CapeFlyer service: Sandwich, West Barnstable, Barnstable and Yarmouth. In addition to the Hyannis branch, the New Haven operated a southward branch that went to Falmouth and Woods Hole, for ferryservice to the large islands to the south of Cape Cod, Martha's Vineyard and Nantucket Island. The stations of the Woods Hole branch included Monument Beach, Pocasset, North Falmouth, Falmouth and Woods Hole.[20]
From the 1930s to the early 1960s, the company offered various summertime Cape Codder trains from New York City to the Cape. It offered a daily Day Cape Codder. On Friday afternoons it offered the Neptune; and on Friday nights offered a night train, the Night Cape Codder. Sunday nights had trains returning from Hyannis.[21] Already by 1955, the New York service was reduced to summer only. However, the New Haven operated daily year-round service from Boston's South Station.[22]
From 1960 to 1964 NH operated weekend service from New York to Hyannis/Woods Hole. Riding from Boston generally required a change of trains in either Attleboro or Providence, though a Boston-Hyannis trip ran via Stoughton and Taunton briefly in mid-1961.[7]
Since then, numerous attempts have been made to restore regular passenger service. In 1974 officials from Penn Central, the owner of the rail lines on the Cape at that time, met with state and local officials to discuss the possible restoration of service.[23] Most remaining trackage on the Cape was purchased by the Commonwealth of Massachusetts in 1976 to preserve the infrastructure for both freight service and future passenger service.[24] A trial passenger train between Hyannis, Buzzards Bay and Falmouth, was operated for a week in the summer of 1979 after trackage was rehabilitated. Politicians hoped to have service regularly operating by 1981.[25]
Cape Cod & Hyannis Railroad
During the summers of 1984 to 1988 the Cape Cod & Hyannis Railroad operated scheduled passenger service between Braintree and Cape Cod, with service to both Hyannis and Falmouth. The one-way trip to Hyannis took 2 hours and 25 minutes.[26] In its last year of service, the Braintree-Cape Cod service carried 89,000 passengers. It was the last time Falmouth was served by passenger trains; derelict trackage was dismantled south of North Falmouth in 2007 and replaced with an extension of the Shining Sea Bikeway amid public opposition.
The Cape Cod & Hyannis Railroad ceased operation in February 1989 when the Massachusetts Executive Office of Transportation and Construction suspended the subsidy for the 1989 season due to the state's fiscal crisis.[27]
Amtrak's Cape Codder and other service
From 1986 to 1996 Amtrak operated a train known also known as the Cape Codder from Washington, DC/New York City to Hyannis. The service was routed from Attleboro to Taunton via a section of track that was once part of the Taunton Branch Railroad. Traveling between Boston and Cape Cod required transferring to Providence/Stoughton Line or Regional service at Providence. The Cape Codder was discontinued after 1996, despite moderate success, due to the end of the state subsidy.
The Middleborough/Lakeville Line opened in September 1997 along with the Plymouth/Kingston Line, restoring passenger service to 60 miles of the Old Colony network.[7] Initial plans called for full service as far as Buzzards Bay, but the final route was scaled back due to high costs and uncertain ridership. In 2007, a Boston Region Metropolitan Planning Organization report analyzed the possibility of an extension to Buzzards Bay. At that time ridership was estimated to be between 1,766 weekday riders with four daily trips, and 2,750 riders with all Middleborough trains extended to Buzzards Bay.[28]
The Cape Cod Railroad operated excursion service from 1989 to 1997, followed by the Cape Cod Central Railroad starting in 1999.[7] However, neither service ventured north of Buzzards Bay and occasionally Wareham, making them largely useless for those traveling to the Cape from outside areas.
CapeFLYER
In early 2011 the CCRTA awarded a contract to the Transportation Planning and Resource Group, a consulting firm, to study the "obstacles, impediments and funding issues associated with reviving passenger rail service to Cape Cod."[29] At that time the CCRTA had hoped to launch seasonal rail service from Boston for the summer of 2012. The launch of service was pushed back a year, to 2013, in part to avoid the perception that the CCRTA's new service to the Cape might be adding to the MBTA's fiscal problems.[30]
In late 2012 the CCRTA announced that a decision had been made to restore passenger service between Boston South Station and Cape Cod starting Memorial Day weekend 2013.[31] The Patrick-Murray administration made the announcement official on April 2, 2013 at a press conference at South Station in Boston.[32]
A test train with passengers aboard was run on May 18, 2013 – the first direct train from Boston to Cape Cod since 1961, and the first via the Old Colony main line since 1959. The CapeFLYER's inaugural journey departed South Station at 5:12 p.m. on Friday, May 24, 2013, with about 200 passengers destined for Buzzards Bay and Hyannis.[33]
The CapeFLYER has operated one round trip on Fridays, Saturdays and Sundays each year since its inception.
Ridership
For the 2013 season, total ridership was 16,586 passengers.[34] Revenue was $293,000 (including the period after Labor Day), and $27,000 in advertising revenue.[35]
For the 2014 season, the CapeFlyer carried 12,625 passengers, down from about 15,000 for the similar period in 2013.[3] Fare revenue was $221,000, with $93,000 from advertising.[35]
For 2015, ridership was 13,278 – up from 2014, but still down from 2013 – with fare revenue of $223,000.[3]
In 2016 ridership was 13,663, however there were only 15 weekends of service vs. 16 in 2015, so per round trip ridership was up 9.2%. Revenue was $230,000.[4]
Finances
In its inaugural season the CapeFlyer generated $290,756 in fare revenue and its operating costs were estimated to be $180,000 to $190,000. Marketing costs during the first year were between $110,000 and $120,000. These costs were offset by ticket sales and revenue collected from on-board concessions and advertising.[36][37][38]
The capital costs associated with the start of the CapeFLYER in 2013 were approximately $3.4 million. This included track surfacing, fresh track ballast, installation of new railroad ties, new signage, improvements to the Buzzards Bay and Hyannis stations, and repairs to numerous grade crossings along the Cape Main Line.[8]
MassDOT's draft Capital Investment Plan for FY2014-FY2018 includes $31 million to complete track and signal projects necessary to restore permanent, seasonal Cape Flyer passenger service to Cape Cod.[39]
In 2014 a new station platform in Wareham was constructed and the station platforms in Buzzards Bay and Hyannis were expanded, at a total cost of about $2.5 million.[40]
Expansion and development
Service changes
Less than a week after the service launched Thomas Cahir, the Administrator of the CCRTA, announced that the CapeFLYER would stop at the station in Wareham starting in 2014.[41] The CapeFLYER does not currently stop at the Cape Cod Central Railroad stations in Sandwich or West Barnstable in an effort to get the train to Hyannis in a reasonable amount of time.[42]
In October 2013, MassDOT announced that the CapeFLYER would be a permanent seasonal service, with a study to be made of year-round weekend service.[5] The MassDOT announcement included confirmation of the addition of the Wareham stop in 2014, though Cahir backtracked on his previous statement saying the stop was not "fiscally prudent."[43] However, CCRTA and MassDOT proceeded with plans for the Wareham stop. Construction of a high-level platform at Wareham began in April 2014, and the CapeFLYER began stopping there in late June.[44]
For the 2015 season, the CapeFLYER operated with a dedicated trainset on Fridays (rather than continuing an existing local commuter train), thus allowing a more convenient departure time and fewer stops on that train. All CapeFLYER trains stop at Brockton station to provide a one-seat ride between Brockton and Cape Cod.[45] In August 2019, after a train ran out of seats, MassDOT added another bi-level passenger car to the train. This was done at the request of the Cape Cod Regional Transit Authority before the weekend of August 9.[46]
Operations in the 2020 season were delayed by the COVID-19 pandemic, with seasonal service not beginning until June 26, 2020, over a month later than planned.[47]
Bourne station
In September 2014 it was announced that MassDOT was considering a new CapeFLYER station stop in Bourne for the 2015 season.[48] The new 400-foot station platform, as proposed, would be built at the railroad right of way below the Bourne Bridge approach.[49] MassDOT also announced plans to restore a siding on the north side of the Cape Cod Canal Railroad Bridge and to install a new double-ended 4,000-foot passing siding just south of the canal. The new track work, and associated switches and signals, would facilitate multiple train moves during a single bridge drop.[49]
In February 2015, it was announced that the opening of the station would be delayed one year, due to the amount of snow received during the winter and local unease over the project.[50] After the conclusion of the season in 2015, it was announced that current plans for building a station in Bourne had been suspended.[51] Following several years of uncertainty, the station subsequently opened in 2019, when a prefabricated section of high-level platform was installed in lieu of a fully-constructed station.
Commuter rail to Buzzards Bay
The relative success of the CapeFLYER has brought new attention to the possibility of extending the Middleborough/Lakeville Line. The possibility was seriously discussed before the end of its first summer season.[6] In September 2013, the Wareham Chamber of Commerce announced that based on the success of the CapeFLYER, the Chamber supported commuter rail extension to Buzzards Bay.[52] The Buzzards Bay town selectmen similarly supported the idea later that year, and a public forum was held in January 2014.[53][54]
Bourne's Transportation Advisory Committee began studying the possibility in mid-2014, with the addition of work by MassDOT's Central Transportation Planning Staff (CTPS) in November 2014.[55] A Local Impact Report released in April 2015 proposed an 800 foot (240 m) high-level platform and two parking alternatives: a 120-space modification of the existing lot, and a 400-to-600-space structure including a realignment of Academy Drive. The CTPS data estimated ridership at 875 daily riders if all Middleborough trains were extended to Buzzards Bay, or slightly fewer with a limited number of trains.[55]
Bourne voted to join the MBTA district in 2015 and began paying an assessment in mid 2016 (for FY 2017), although there was no guarantee that commuter rail service would be provided in the fiscally constrained environment.[56] For FY 2017, Bourne paid $41,707 to the MBTA plus an existing $88,429 to the CCRTA for existing bus service.[57] MassDOT began planning a possible commuter rail trial service in October 2015. In February 2016, state representatives and CCRTA administrator Thomas Cahir said that the state wishes to begin trial service during FY 2017.[57]
While the various proposals for commuter rail service in the mid-2010s were not realized, the MBTA began a study in fall 2020 to evaluate the feasibility of implementing Buzzards Bay commuter rail service in conjunction with the currently under-construction South Coast Rail.[58][59]
Station list
CapeFlyer tickets are not priced using the MBTA Commuter Rail's numbered fare zone system. Instead, the route is divided into three sections (Boston–Brockton, Middleborough/Lakeville–Bourne, and Hyannnis), with ticket prices varying depending on origin and destination.[10]
Mile (km)[60] | Location | Station | Connections and notes |
---|---|---|---|
0.0 (0) | Boston | South Station | Amtrak: Acela, Lake Shore Limited, Northeast Regional MBTA Commuter Rail: Fairmount, Framingham/Worcester, Franklin, Needham, Greenbush Line, Old Colony, and Providence/Stoughton lines MBTA subway: Red Line; Silver Line (SL1, SL2, SL3, SL4) MBTA bus: 4, 7, 11 South Station Bus Terminal |
10.9 (17.5) | Braintree | Braintree | MBTA subway: Red Line MBTA Commuter Rail: Middleborough/Lakeville Line, Kingston/Plymouth Line MBTA bus: 230, 236 |
20.0 (32.2) | Brockton | Brockton | MBTA Commuter Rail: Middleborough/Lakeville Line Brockton Area Transit Authority: 1, 2, 3, 4, 5, 6, 8, 9, 10, 11, 12, 14 |
35.6 (57.3) | Lakeville | Middleborough/Lakeville | MBTA Commuter Rail: Middleborough/Lakeville Line GATRA: Downtown Middleborough Shuttle, Wareham/Middleborough/Lakeville Train Connector |
49.1 (79.0) | Wareham | Wareham Village | GATRA: Wareham/Onset/Wareham Link |
54.7 (88.0) | Buzzards Bay | Buzzards Bay | Cape Cod Central Railroad GATRA: Cranberry Plaza To Buzzards Bay Link CCRTA: Bourne Run |
56.4 (90.8) | Bourne | Bourne | CCRTA Steamship Authority Shuttle |
79.1 (127.3) | Hyannis | Hyannis Transportation Center | Cape Cod Central Railroad CCRTA Plymouth and Brockton Street Railway Peter Pan Bus Lines |
References
- "Governor Patrick Announces Permanent Seasonal Service for Cape Flyer, New Science Building for Cape Cod Community College". The Official Website of the Governor of Massachusetts. 29 October 2012. Archived from the original on 11 December 2013. Retrieved 29 October 2013.
- Enwemeka, Zeninjor (May 21, 2015). "Boston-To-Cape Train Returns Friday With Additional Service". WBUR.
- Mintz, Sam (5 October 2015). "Weekend tourist train posts another successful summer". Cape Cod Times. Archived from the original on 5 October 2015. Retrieved 5 October 2015.
- Reporter, Staff. "CapeFLYER increases ridership over 2015". capecodtimes.com.
- "Governor Announces Cape Flyer Permanent Seasonal Service". Commonwealth Conversations: Transportation. Massachusetts Department of Transportation. 29 October 2013. Retrieved 29 October 2013.
- Kinsella, James (16 August 2013). "Cape Commuter Rail Is A Real Possibility". Cape News. Archived from the original on 19 August 2013. Retrieved 18 August 2013.
- Belcher, Jonathan (23 March 2013). "Changes to Transit Service in the MBTA district" (PDF). NETransit. Retrieved 11 July 2013.
- Transportation Planning and Resource Group (May 2012). PHASE I Project Report: Cape Cod Seasonal Passenger Rail Service. Retrieved February 5, 2013.
- "CapeFLYER 2015 Schedule". CCRTA. Retrieved April 16, 2015.
- Cape Rail Digest. Cape Cod Chapter, National Railway Historical Society. April 2013. Missing or empty
|title=
(help) - Grundstrom, Gretchen (April 11, 2013). "Cape Flyer train plans to traverse Rochester, Wareham". Wareham Courier. Retrieved April 11, 2013.
- "Stopgap measures pondered to ease Cape traffic - The Boston Globe". BostonGlobe.com.
- "Getting smart about Cape summer traffic". July 10, 2013.
- "Schedules and Fares". CCRTA. Retrieved May 21, 2013.
- "Patrick-Murray Administration Announces Return of Rail Service from Boston to Cape Cod" (Press release). Massachusetts Bay Transportation Authority. April 2, 2013. Retrieved April 7, 2013.
- "While Onboard". CapeFLYER. Retrieved March 16, 2019.
- Farson, Robert H. (1993). Cape Cod Railroads Including Martha's Vineyard and Nantucket. Joan Hollister Farson (First ed.). Yarmouthport, Massachusetts: Cape Cod Historical Publications. ISBN 0-9616740-1-6.
- "Boston and Cape Cod Timetable". New Haven Railroad. April 28, 1957. Retrieved February 17, 2013.
- "To End Train Service Between Yarmouth, Provincetown on Cape". Daily Boston Globe. June 24, 1941. Retrieved February 17, 2013.
- New Haven Railroad timetable, April 25, 1948, Tables 29, 30, 31, 32
- New Haven Railroad timetable, June 25, 1939, Table A
- New Haven Railroad timetable. April 24, 1955 – via Wikimedia Commons.
- Deveney, Paul (January 6, 1974). "Penn Central 'opens door' for renewed Cape rail service". Boston Globe. Retrieved February 17, 2013.
- Pave, Marvin (April 5, 1976). "85 miles of track acquired by state". Boston Globe. Retrieved February 17, 2013.
- Garland, Russell (August 12, 1979). "Trial run for Cape train". Boston Globe. Retrieved February 17, 2013.
- Pillsbury, Fred (June 30, 1984). "Hyannis, Falmouth, All Aboard!". Boston Globe. Retrieved February 17, 2013.
- "Dukakis Budget Would End Braintree-Cape Rail Subsidy". Boston Globe. January 28, 1989. Retrieved February 17, 2013.
- Humphrey, Thomas J.; et al. (January 2007). "Buzzards Bay Commuter Rail Feasibility Study" (PDF). Boston Region Metropolitan Planning Organization. Retrieved 11 July 2013.
- Bailey, Michael (March 18, 2012). "CCRTA Pushes For Passenger Rail Revival In 2012". The Enterprise. Archived from the original on January 25, 2012. Retrieved March 5, 2013.
- Corcoran, Sean (April 27, 2012). "'Tourist Train' Status: Delayed". WGBH. Archived from the original on 2012-05-01. Retrieved March 5, 2013.
- Maroney, Edward F. (December 6, 2012). "Boston-Hyannis passenger rail service due by May". The Barnstable Patriot. Retrieved April 28, 2013.
- "Patrick-Murray Administration Announces Return of Rail Service from Boston to Cape Cod" (Press release). Boston, Mass.: MassDOT. April 2, 2013. Retrieved 2013-04-28.
- Anderson, Derek J. (May 25, 2013). "CapeFlyer embarks on maiden voyage". Boston Globe. Retrieved June 4, 2013.
- "Governor Offers Dual Boosts for Cape". Cape Cod Times. October 29, 2013. Archived from the original on October 30, 2013. Retrieved October 29, 2013.
- Vaccaro, Adam (17 September 2014). "CapeFLYER Ridership, Revenue Down in 2014". The Boston Globe. Retrieved 17 September 2014.
- Seelye, Katharine (March 25, 2013). "Weekend passenger rail service to run seasonally between Cape and Boston". The New York Times. Retrieved March 25, 2013.
- Cassidy, Patrick (December 13, 2012). "Weekend passenger rail service to run seasonally between Cape and Boston". The Standard-Times. Retrieved December 13, 2013.
- Cassidy, Patrick (April 30, 2014). "Cape Flyer to return for the summer". The Cape Cod Times. Archived from the original on May 2, 2014. Retrieved April 30, 2014.
- "MassDOT Releases Five-Year Investment Plan". MassDOT. 10 January 2014. Retrieved 28 January 2014.
- "MassCoastal Railroad – Wareham, Buzzards Bay & Hyannis Platform Reconstruction". Century Paving & Construction Corp. October 2014. Retrieved 2014-10-25.
- Rebhan, Jaime (May 28, 2013). "First weekend of Cape train service successful, Wareham stop planned". Wareham Week. Retrieved May 30, 2013.
- "CapeFLYER will fly by WB". The Barnstable Patriot. December 20, 2012. Retrieved March 25, 2013.
- Cassidy, Patrick (29 October 2013). "Governor offers dual boosts for Cape". Cape Cod Times. Archived from the original on 30 October 2013. Retrieved 29 October 2013.
- "New Wareham CapeFLYER Stop Opens" (Press release). Massachusetts Bay Transportation Authority. 26 June 2014. Retrieved 26 June 2014.
- "CapeFLYER Service Begins Memorial Day Weekend" (Press release). Massachusetts Bay Transportation Authority. 13 May 2015. Retrieved 13 May 2015.
- Merchant, Brian (August 13, 2019). "CapeFlyer Expanding Capacity Amid Higher Demand". CapeCod.com. Retrieved August 14, 2019.
- "Report from the Deputy General Manager" (PDF). Massachusetts Bay Transportation Authority. June 15, 2020.
- "Bourne Stop on Cape Flyer Route to be Considered For Next Season". CapeCod.com. 4 September 2014.
- "New Bourne Capeflyer Station meeting to be held by MassDOT Dec. 1". Wareham Courier. 2014-11-18. Retrieved 2014-11-20.
- Barber, C. Ryan (12 February 2015). "CapeFlyer rail platform project delayed a year". Cape Cod Times. Retrieved 13 February 2015.
- Gately, Paul (23 September 2015). "CapeFlyer ridership, revenue increase in third season". Wicket Local Bourne. Retrieved 23 September 2015.
- "Chamber: Bring on commuter rail to Wareham, Buzzards Bay". Wicked Local Wareham. 25 September 2013. Retrieved 17 March 2014.
- "Commuter rail return to Buzzards Bay: viable, or romantic notion?". Wicked Local Buzzards Bay. 16 December 2013. Retrieved 17 March 2014.
- Rausch, Michael J. (27 January 2014). "Pros And Cons of Bourne Commuter Rail Discussed At Forum". Cape News. Archived from the original on 17 March 2014. Retrieved 17 March 2014.
- "Buzzards Bay Commuter Rail Extension Local Impact Report" (PDF). Cape Cod Commission. April 2015. Retrieved 26 February 2016.
- Vaccaro, Adam (15 February 2016). "This Cape Cod town is paying for rail service that doesn't exist". Boston Globe. Retrieved 21 February 2016.
- Rausch, Michael J. (26 February 2016). "Details Expected Soon About Buzzards Bay Commuter Trains". Cape News. Retrieved 26 February 2016.
- Grady Culhane (3 December 2020). "Study Investigates Possible Cape Cod Commuter Rail Service". CapeCod.com. Retrieved 15 December 2020.
- Ethan Genter (1 December 2020). "New study renews hope for Cape commuter rail service". Cape Cod Times. Retrieved 15 December 2020.
- "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
Further reading
- Harris, Patricia; Lyon, David (June 8, 2013). "The CapeFlyer to Hyannis". The Boston Globe.
- Seelye, Katharine Q. (May 26, 2013). "Train Service to Cape Cod, an Alternative to Road Rage". The New York Times.
- "Cape Cod welcomes the CapeFLYER" (PDF). The Barnstable Patriot. March 24, 2013. Archived from the original (PDF) on 2014-07-03. Retrieved 2013-05-28.
- Transportation Planning and Resource Group (March 2012). Phase I Project Report: Cape Cod Seasonal Passenger Rail Service (Report).
External links
Wikimedia Commons has media related to CapeFLYER. |