The Circle line is a London Underground line in a spiralling shape, running from Hammersmith in the west to Edgware Road and then looping around central London back to Edgware Road. The railway is below ground in the central section and on the loop east of Paddington. Unlike London's deep-level lines, the Circle line tunnels are just below the surface and are of similar size to those on British main lines. Coloured yellow on the Tube map, the 17-mile (27 km) line serves 36 stations, including most of London's main line termini. Almost all of the route, and all the stations, are shared with one or more of the three other sub-surface lines, namely the District, Hammersmith & City and Metropolitan lines. On the Circle and Hammersmith & City lines combined, over 114 million passenger journeys were recorded in 2011/12.

Circle line
A Circle line S7 Stock train at Aldgate
Overview
Stations36
Colour on mapCorporate Yellow (with black outline until 1990)[1]
Websitetfl.gov.uk
Service
TypeRapid transit
SystemLondon Underground
Depot(s)Hammersmith
Rolling stockS7 Stock
Ridership114.6 million (2011/12)[lower-alpha 1][2] passenger journeys
History
OpenedInfrastructure opened in stages between 1863 and 1884; shown as a separate line on the Tube map from 1949
Last extension2009
Technical
Line length27 km (17 mi)
CharacterSub-surface
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
London Underground
Bakerloo
Central
Circle
District
Hammersmith & City
Jubilee
Metropolitan
Northern
Piccadilly
Victoria
Waterloo & City
Other systems
Crossrail
DLR
London Overground
London Trams
TfL Rail

The first section became operational in 1863 when the Metropolitan Railway opened the world's first underground line between Paddington and Farringdon with wooden carriages and steam locomotives. The same year a select committee report recommended an "inner circle" of lines connecting the London railway termini, and the Metropolitan District Railway (commonly known as the District Railway) was formed to build the southern portion of the line.

In 1871 services began between Mansion House and Moorgate via Paddington, jointly operated by the two companies. Due to conflict between the two companies it was not until October 1884 that the inner circle was completed. The line was electrified in 1905, and in 1933 the companies were amalgamated into the London Passenger Transport Board. In 1949 the Circle line appeared as a separate line for the first time on the Tube map. In 2009 the closed loop around the centre of London on the north side of the River Thames was broken at Edgware Road and extended west to become a spiral to Hammersmith.

The signalling system is being upgraded. The C Stock trains were replaced in 2014 by new seven-car S Stock trains, in a programme completed in 2015.

History

Origins

High Street Kensington in 1892

In 1863 the Metropolitan Railway, the world's first underground railway, opened in London between Paddington and Farringdon, connecting the Great Western Railway's relatively remote terminus at Paddington with Euston and King's Cross stations and the City, London's financial heart. In the same year a select committee report recommended an 'inner circle' of railway lines connecting the London termini that had been built or under construction. In the next year the Metropolitan District Railway (commonly known as the District Railway) was formed to build and operate a railway from South Kensington to Tower Hill. The Metropolitan western extension opened in 1868 from a new station at Paddington to South Kensington. By May 1870 the District railway had opened its line from West Brompton to Blackfriars via Gloucester Road and South Kensington, services being operated at first by the Metropolitan.[3] In 1871 the District had built a terminus at Mansion House, and on 18 November 1876 the Met opened its terminus at Aldgate.[4] Due to conflict between the two companies it took an Act of Parliament before further work was done on the inner circle.[5] In 1882 the Metropolitan extended its line from Aldgate to a temporary station at Tower Hill and the District completed its line to Whitechapel. On 6 October 1884 the temporary station was replaced with a joint station and the inner circle was complete.[6][7] The Metropolitan provided the clockwise or 'outer rail' trains, the District the 'inner rail' or anti-clockwise.[8] Many breakdowns occurred, due to the unbalanced wear and tear inflicted upon the train and carriages caused by travelling in one (circular) direction which were hard to remove. Equally services were further disrupted due to petty squabbles between the two rivals including an incident whereby the Metropolitan Railway forcibly removed (using 3 trains) the District Railway's parked carriages which had been chained to the track.[9] Historically there has been difficulty in relaying the direction of travel a train is headed in a clear message, variations such as "eastbound/westbound", "clockwise/counterclockwise" have caused ambiguity. Recently TfL considered stopping such announcements due to passengers becoming more accustomed to digital devices and now uses key stations along the route e.g. "via. High Street Kensington"[10][11]

Other circle routes

As well as the inner circle, other routes circumnavigated London, although these were not complete loops. From 1872 the L&NWR began an "outer circle" service from Broad Street to Mansion House via Willesden Junction and Earl's Court, diverting an earlier service that had run to Victoria; and the GWR began a "middle circle" service from Moorgate to Mansion House via Latimer Road and Earl's Court. Both of these routes were cut back to Earl's Court: the "middle circle" in 1900 and the "outer circle" in 1909. The GWR service survived as a shuttle service from the Hammersmith & City line to Addison Road, now Kensington (Olympia), until 1940.[8]

The Midland Railway briefly ran a "super outer circle" from St Pancras to Earl's Court from 1878 to 1880.[8] Today London Overground runs services between Clapham Junction, Willesden Junction and Dalston Junction and between Dalston Junction and Clapham Junction.

Electrification

The joint Metropolitan and District Railway experimental electric train that ran between Earl's Court and High Street Kensington in 1900

Wooden carriages were originally hauled by steam locomotives leading to smoke-filled stations and carriages, unpopular with passengers. At the start of the 20th century the District and Metropolitan were seeing increased competition in central London from the new electric underground tube lines and trams, and conversion to electric traction was seen as the way forward.[12] Experiments were carried out on the Earl's Court to High Street Kensington section, and a jointly-owned six-carriage train began passenger service in 1900. Following this an AC system was suggested, and this was accepted by both parties. However, the District was looking for a way to raise the finance needed and in 1901 found an investor, the American Charles Yerkes. He formed the Underground Electric Railways of London (UERL), and his experience in the United States led him to favour DC, with third-rail pick-up similar to that in use on the City & South London Railway and Central London Railway. After arbitration by the Board of Trade the DC system was taken up, and the railways began electrifying the routes, using multiple-unit stock.[13]

The District and Metropolitan Railways bought different designs of electric multiple unit. Both had open saloons; the Metropolitan trains with gated ends, the District B Stock with sliding doors in the middle of each car.[14] When their introduction was attempted on 1 July 1905, a Metropolitan train overturned the third rail on the District Railway, requiring all Metropolitan trains to be modified before running again on the District lines. Full electric service started on 24 September, initially with 6-car trains, later reduced to 4-car.[15] The Metropolitan trains were soon modified to enclose the gated end[16] and eventually to add sliding doors in the middle.[17] Trains were increased to 5 cars in 1918 and the Metropolitan introduced new stock in 1921, with three pairs of sliding double doors on trailer cars.[18] In 1926 the Metropolitan took over all inner circle workings except for three trains on Sundays.[19]

London Transport

O Stock was used on the Circle line 1947–70. Here photographed at Barking in 1980.
The Circle line before extension to Hammersmith

On 1 July 1933 the Metropolitan and the District Railways were amalgamated with other Underground railways, tramway companies and bus operators to form the London Passenger Transport Board. Metropolitan Railway electric multiple units were refurbished in 1934 at Acton Works to become eighteen 5-car trains of Circle Stock, at first painted red and cream, later painted red all over to reduce costs. These trains included first-class accommodation,[20] but this was downgraded in 1940.[21] From 1947 these were replaced by 5-car trains of O and P Stock, with doors remotely operated by the guard, released by the transfer of F Stock to the Uxbridge line.[22] The 1933 London Underground Beck map shows a Metropolitan line north of High Street Kensington and Mark Lane stations and a District line south of these points.[23] On the 1947 map the Metropolitan and District lines were shown together in the same colour[24] and two years later in 1949 the Circle line was shown separately on the map.[25]

In 1959–1960 Circle line trains were increased to 6 cars, the same length as those operating on the Hammersmith & City line, and the stock of the two lines was integrated with maintenance concentrated at Hammersmith depot, allowing Neasden depot to concentrate on the new A Stock.[26] Aluminium C Stock trains, with public address systems and originally unpainted, replaced these trains from 1970.[27] One person operation of the trains was proposed in 1972 but, due to conflict with the trade unions, was not introduced until 1984.[28] In 2003, the infrastructure of the Circle line was partly privatised in a public–private partnership, managed by the Metronet consortium. Metronet went into administration in 2007 and the local government body Transport for London took over responsibilities.[29]

On 7 July 2005, at about 08:50, bombs exploded on two Circle line trains. One was travelling between Liverpool Street and Aldgate and the other was at Edgware Road. The bombs killed 15 people, including the two suicide bombers.[30][31] Following the attacks, the whole of the Circle line was closed until 8 August.[32]

A day before a ban on drinking alcohol on public transport in London came into force, a party was held on 31 May 2008, mainly on the Circle line. Thousands of people attended and 17 were arrested by police due to disorderly behaviour, eventually causing several stations to be closed.[33]

Extension

Prior to 13 December 2009, Circle line trains travelled in both directions around a simple loop with 27 stations and 12.89 miles (20.75 km) of track. In 2006 there were fourteen trains in service on the line with an interval between trains of 8 12 minutes during peak hours and 8 minutes off-peak; the minimum running time around the circle off-peak was 51 12 minutes,[34] although timetabled stops at stations extended this.[lower-alpha 2]

In December 2009 the Circle line was extended to include the Hammersmith & City route from Edgware Road to Hammersmith. Rather than continuously running around the circle, trains now travel from Hammersmith to Edgware Road, generally going around the circle once before terminating at Edgware Road, and returning via the same route; occasionally, trains may also continue clockwise through Edgware Road to additional stations. The change was made to improve reliability and increase the service frequency on the Hammersmith branch.[36]

In 2020, following the UK government's implementation of lockdown restricting all non-essential travel, the Circle line, along with the Waterloo & City line, was suspended.[37]

Route

Map

The route of the Circle line since 13 December 2009 and the London boroughs it serves

Railway line

Circle line
District line &
Piccadilly line
Hammersmith
Hammersmith
Goldhawk Road
Hammersmith depot
Shepherd's Bush
(MR)
District line &
Piccadilly line
Shepherd's Bush Market
White City
Wood Lane
Latimer Road
Ladbroke Grove
Westbourne Park
High Street Kensington
Royal Oak
Gloucester Road
Notting Hill Gate
Bayswater
South Kensington
Paddington
Sloane Square
Edgware Road
Victoria
Baker Street
St. James's Park
Great Portland Street
Westminster
Euston Square
Embankment
King's Cross St. Pancras
King's Cross Thameslink
Temple
Farringdon
Blackfriars
City Thameslink
Mansion House
Cannon Street
Barbican
Monument
Mark Lane
Moorgate
Tower Hill
Liverpool Street
Aldgate
Key

Joint sections:


Source:

Detailed map of London Tube, Underground,
Overground, DLR, Tramlink & National Rail

The Circle line is 17 miles (27 km) long with 36 stations.[38] Almost all of its track, and all of its stations, are shared with the other London Underground sub-surface lines: the Hammersmith & City line from Hammersmith to just north of Aldgate; the Metropolitan line from Baker Street to Aldgate; and the District line from Tower Hill station to Edgware Road station,[39] (except for a short connecting section near Gloucester Road). The line is electrified with a four-rail DC system: a central conductor rail is energised at −210 V and a rail outside the running rail at +420 V, giving a potential difference of 630 V.[40] The running rails are not electrified. Much of the 2-mile-35-chain (3.9 km) double track railway from the Hammersmith terminus to Westbourne Park station is on a 20-foot (6.1 m) high brick viaduct.[41]

East of Westbourne Park the line passes beneath the Great Western main line before resurfacing at Royal Oak station and running alongside the tracks of the main line to an island platform just north of the suburban platforms at Paddington station.[39] The line enters a cut and cover tunnel at the end of the platforms and meets the District line and the other end of the Circle line from Bayswater at Praed Street Junction before passing through Edgware Road station in a cutting. After King's Cross St Pancras station the line exits the tunnel before passing under the Ray Street Gridiron that carries the City Widened Lines which are currently used by Thameslink services.[39][42] The line continues underground after Farringdon station; there are bay platforms at Moorgate station.[39]

After passing through Aldgate station, the terminus of the Metropolitan line, the line joins the District line shortly before Tower Hill; this part of the line includes stations on the Victoria Embankment, on the north bank of the Thames, as far as Westminster station.[39] West of Gloucester Road station the line turns off the District main line to join the District line's Edgware Road branch just before High Street Kensington station.[39] In Bayswater the line is in a cutting, concealed from above by a façade of two five-storey houses at Nos. 23 and 24 Leinster Gardens.[43] Trains then call at the second Paddington station on Praed Street before rejoining the Hammersmith & City line at Praed Street junction and terminating at the four-platform Edgware Road station.[39]

Services

As of December 2012 there are six trains per hour, calling at all stations,[44] requiring 18 trains in service.[38] The journey from Edgware Road around the loop and continuing to Hammersmith takes 72 minutes off-peak.[44] Together with the Hammersmith & City line over 114 million passenger journeys are made each year.[2] Paddington and all stations on the loop are within Zone 1, with those on the line to Hammersmith in Zone 2.[45]

Two trains per day run from the District line station at Barking to Edgware Road via Victoria (as of February 2015).[46]

Rolling stock

From 1970 to 2014, services were provided using six-car C69 stock trains, each car having mostly transverse seating and four sets of double doors per side to minimise loading times.[47]

The C69 stock trains were replaced by seven-car S Stock trains, the first running on the Circle line on 2 September 2013.[48][49][50] By June 2014 all services were provided by S7 Stock trains. The trains are part of Bombardier's Movia family,[51] and have a top speed of 62 mph (100 km/h).[51] A 7-car S Stock train has a capacity of 865 passengers compared to 739 for the 6-car C Stock train it replaced.[52][53] With a length of 117 metres (384 ft), the S Stock trains are 24 metres (79 ft) longer than the 93-metre (305 ft) long C stock train, and required station platforms to be lengthened before their introduction.[54]

Depot

The line's depot is at Hammersmith,[lower-alpha 3] close to Hammersmith station, originally built by the Great Western Railway to be operated by the Metropolitan Railway when the joint Hammersmith & City Railway was electrified in the early 20th century.[55] Sidings at Barking, Farringdon and near High Street Kensington (known as Triangle Sidings) stable trains overnight.[38]

Four Lines Modernisation (4LM)

It was planned that a new signalling system would be used first on the sub-surface lines from the end of 2016,[56] but signalling contractor Bombardier was released from its contract by agreement in December 2013 amid heavy criticism of the procurement process[57] and London Underground subsequently awarded the contract for the project to Thales in August 2015.[58]

With the introduction of S7 Stock, the track, electrical supply, and signalling systems are being upgraded in a programme planned to increase peak-hour capacity on the line by 27 per cent by the end of 2023.[56][59][60]A single control room for the sub-surface railway opened at Hammersmith on 6 May 2018, and Communications Based Control (CBTC) provided by Thales will progressively replace 'fixed block' signalling equipment dating back the 1940s.[56][61]

The rollout of CBTC has been split into sections, each known as a Signal Migration Area (SMA), and are located on the line as follows:[62]

Circle line Signal Migration Areas
SMA from to status date
0.5 Hammersmith Latimer Road commissioned March 2019
1 Latimer Road Paddington commissioned September 2019
2 Paddington Euston Square commissioned September 2019
3 Euston Square Monument planned March 2021
4 Monument Sloane Square planned May 2021
5 Sloane Square Paddington planned July 2021

SMAs 6–14 concerns parts of the District, Hammersmith & City, and Metropolitan lines.

List of stations

StationImageOpened[7]Additional informationPosition
Hammersmith 13 June 1864Moved to current position 1 December 1868.[7] Connects with Hammersmith & City Line.51°29′39″N 000°13′30″W
Goldhawk Road1 April 191451°30′07″N 000°13′37″W
Shepherd's Bush Market13 June 1864Moved to current position 1 April 1914.[7] Renamed from "Shepherd's Bush" in 2008.[63]51°30′21″N 000°13′35″W
Wood Lane 1 May 1908Open as Wood Lane (Exhibition) 1908–14 and as required from 1920 as Wood Lane (White City). Renamed White City in 1947 and closed in 1959,[7] until re-opened as Wood Lane on 12 October 2008.[64]51°30′35″N 000°13′27″W
Latimer Road16 December 1868Closed from 17 January to 1 August 2011 for engineering and refurbishment works.[65]51°30′50″N 000°13′02″W
Ladbroke Grove13 June 1864Opened as Notting Hill, renamed Notting Hill & Ladbroke Grove in 1880, Ladbroke Grove (North Kensington) in 1919, and Ladbroke Grove in 1938.[7]51°31′02″N 000°12′38″W
Westbourne Park1 February 1866Moved to current position 1 November 1871,[7] and a Great Western main-line station from 1871 to 1992.[66]51°31′16″N 000°12′04″W
Royal Oak30 October 1871Also a Great Western main line station after opening[67] until 1934.51°31′09″N 000°11′17″W
Paddington 10 January 1863Opened as Paddington (Bishop's Road), renamed in 1948.[7]
Connects with Bakerloo and District lines and National rail services from Paddington main line station.
51°31′07″N 000°10′46″W
Edgware Road10 January 1863Connects with District and the anti-clockwise Circle lines.51°31′12″N 000°10′04″W
Baker Street10 January 1863Connects with Bakerloo, Jubilee and Metropolitan lines.51°31′19″N 000°09′25″W
Great Portland Street10 January 1863Opened as Portland Road, renamed Great Portland Street in 1917. Named Great Portland Street & Regent's Park 1923–33.[7]51°31′26″N 000°08′38″W
Euston Square10 January 1863Opened as Gower Street and renamed in 1909.[7] Street connection with London Overground and National rail services from Euston main line station.51°31′33″N 000°08′09″W
King's Cross St Pancras 10 January 1863Opened as King's Cross, renamed King's Cross & St. Pancras in 1925 and King's Cross St. Pancras in 1933. Moved to current position in 1941.[7]
Connects with Northern, Piccadilly and Victoria lines and National and International Rail Services from St Pancras and King's Cross main line stations.
51°31′49″N 000°07′27″W
Farringdon 10 January 1863Opened as Farringdon Street, and moved to current position in 1865. Renamed Farringdon & High Holborn in 1922 and Farringdon in 1936.[7]
Connects with Thameslink services.
51°31′12″N 000°06′19″W
Barbican23 December 1865Opened as Aldersgate Street, then Aldersgate in 1910, Aldersgate & Barbican in 1923 and Barbican in 1968.[7]51°31′13″N 000°05′52″W
Moorgate23 December 1865Opened as Moorgate Street, renamed in 1924.[7]
Connects with Northern line and National rail services from the main line Northern City Line.
51°31′07″N 000°05′19″W
Liverpool Street11 July 1875From February to July 1875 trains used platforms in the mainline station.[68]
Connects with Central and Hammersmith & City lines and London Overground, TfL rail and National rail services from Liverpool Street mainline station.
51°31′04″N 000°04′59″W
Aldgate18 November 1876Connects with Metropolitan Line. 51°30′50″N 000°04′34″W
Tower Hill 25 September 1882The Metropolitan Railway opened "Tower of London", however closed this in 1884 as the District Railway had opened "Mark Lane" nearby. This station was renamed "Tower Hill" in 1946 and moved to the site of the "Tower of London" station in 1967.[7][69] Connects with District line, DLR from Tower Gateway and National rail services from Fenchurch Street mainline station.51°30′36″N 000°04′34″W
Monument6 October 1884Opened as Eastcheap, renamed The Monument in 1884.[7] Escalator connection to Bank station giving connections with Central, Northern, Waterloo & City and DLR.51°30′47″N 000°05′17″W
Cannon Street6 October 1884Connects with Cannon Street main line station.51°30′37″N 000°05′27″W
Mansion House3 July 187151°30′44″N 000°05′39″W
Blackfriars 30 May 1870Connects with National rail services from Blackfriars main line station, including Thameslink services.51°30′42″N 000°06′11″W
Temple30 May 1870Opened as The Temple.[7]51°30′40″N 000°06′52″W
Embankment30 May 1870Opened as Charing Cross, renamed Charing Cross Embankment in 1974 and to the current name from 1976.[7] Connects with Bakerloo and Northern lines and National rail services from Charing Cross main line station.51°30′25″N 000°07′19″W
Westminster 24 December 1868Opened as Westminster Bridge, renamed in 1907.[7] Connects with Jubilee line.51°30′04″N 000°07′30″W
St James's Park24 December 186851°29′58″N 000°08′04″W
Victoria 24 December 1868Connects with Victoria line, National rail services from Victoria main line station and Victoria bus station.51°29′48″N 000°08′41″W
Sloane Square24 December 186851°29′33″N 000°09′24″W
South Kensington24 December 1868Connects with Piccadilly line.51°29′39″N 000°10′26″W
Gloucester Road1 October 1868Opened as Brompton (Gloucester Road), renamed in 1907.[7] Connects with Piccadilly and District lines.51°29′41″N 000°10′59″W
High Street Kensington1 October 1868Opened as Kensington (High Street) and name gradually changed by 1880.[7] Connects with District line Edgware Road branch.51°30′03″N 000°11′33″W
Notting Hill Gate1 October 1868Connects with Central line.51°30′32″N 000°11′49″W
Bayswater1 October 1868Opened as Bayswater, renamed Bayswater (Queen's Road) & Westbourne Grove in 1923, Bayswater (Queen's Road) in 1933 and Bayswater (Queensway) in 1946, after which the suffix was gradually dropped.[7]51°30′43″N 000°11′17″W
Paddington1 October 1868Opened as Paddington (Praed Street), renamed in 1948.[7] Connects with Bakerloo and Hammersmith & City lines and National rail services from Paddington main line station.

51°30′56″N 000°10′32″W

The line then continues to Edgware Road where trains terminate, then reverse to traverse the loop in an anticlockwise direction to Hammersmith.

Urban myths

Owing to its traditionally circular nature, the line has generated many urban myths over the years, including a dead man travelling around undiscovered, a school or office using the service to save infrastructure costs and, as an April fool in the Independent, a new particle accelerator to coexist alongside passenger services. [10][70][71]

See also

Notes and references

Notes

  1. combined figures for Circle and Hammersmith & City lines
  2. For example the 22:26 outer rail (clockwise) service from Aldgate was booked to arrive back at Aldgate at 23:22 after waiting at Gloucester Road (for 1 12 minutes), Edgware Road (2 12 minutes) and Baker Street (12 minute).[35]
  3. Position: 51°29′52″N 000°13′31″W

References

  1. Leboff & Demuth 1999, p. 50.
  2. "Performance: LU Performance Data Almanac". Transport for London. 2012. Archived from the original on 14 February 2013. Retrieved 17 January 2013.
  3. Green 1987, pp. 7–9.
  4. Green 1987, pp. 10–11.
  5. Green 1987, p. 12.
  6. Simpson 2003, pp. 23–4.
  7. Rose 2007.
  8. Bruce 1983, p. 11.
  9. Bextor, Robin (2013). Little Book of the London Underground. Woking: Demand Media Limited. ISBN 9781909217379.
  10. Martin, Andrew (2012). Underground Overground: A passenger's history of the Tube. Pine Street, London: Profile Books Ltd. ISBN 978-1846684784.
  11. "London Underground voice announcements". ilyabirman.net. Retrieved 2 October 2018.
  12. Horne 2003, p. 28.
  13. Green 1987, p. 25.
  14. Bruce 1983, pp. 33,37.
  15. Bruce 1983, p. 40.
  16. Bruce 1983, p. 37.
  17. Bruce 1983, p. 39.
  18. Bruce 1983, p. 71.
  19. Bruce 1983, pp. 40–41.
  20. Bruce 1983, pp. 76–77.
  21. Green 1987, p. 51.
  22. Bruce 1983, p. 94.
  23. Green 1987, p. 33.
  24. Green 1987, p. 54.
  25. "1949 tube map". Retrieved 5 March 2012.
  26. Bruce 1983, p. 95.
  27. Bruce 1983, p. 114.
  28. Croome, Desmond F.; Jackson, Alan Arthur (1993). Rails Through the Clay: A History of London's Tube Railways. Capital Transport. p. 468. ISBN 978-1-85414-151-4.
  29. "PPP Performance Report" (PDF). Transport for London. 2010. pp. 7–8. Retrieved 7 March 2012.
  30. "7 July Bombings: Edgware Road". BBC News. Retrieved 24 November 2012.
  31. "7 July Bombings: Aldgate". BBC News. Retrieved 24 November 2012.
  32. Day & Reed 2010, p. 217.
  33. "Tube drinks party sparks mayhem". BBC News. 1 June 2008. Retrieved 23 August 2012.
  34. Working Timetable No. 21, from 11 June 2006. Circle line, Hammersmith & City line. London Underground. 20 April 2006. pp. 2–3.
  35. Working Timetable No. 21, from 11 June 2006. Circle line, Hammersmith & City line. London Underground. 20 April 2006. p. 45.
  36. "Circle Line extended to the west". BBC News. 5 March 2009. Retrieved 24 November 2011.
  37. "Decision to cut Tube services caused overcrowding, say watchdogs". City A.M. London. 20 April 2020. Retrieved 23 April 2020.
  38. "Circle line facts". Transport for London. Retrieved 5 December 2012.
  39. "Detailed London Transport Map". cartometro.com. Retrieved 23 November 2012.
  40. Martin, Andrew (26 April 2012). Underground, Overground: A Passenger's History of the Tube. Profile Books. pp. 137–138. ISBN 978-1-84765-807-4. Retrieved 7 December 2012.
  41. Jackson 1986, p. 38.
  42. Jackson 1986, p. 48.
  43. Jackson 1986, pp. 52–53.
  44. "Hammersmith to Edgware Road Circle line timetable". Transport for London. Retrieved 9 December 2012. In the Tube timetable - Tube station box select "Hammersmith (H&C Line)" and press Get Timetable. Select Edgware Road timetable and then view timetable.
  45. "Standard Tube Map" (PDF). Transport for London. Retrieved 8 December 2012.
  46. Elledge, Jonn (2 November 2015). "London Underground: Why are Circle line trains showing up at Whitechapel?". CityMetric. Retrieved 14 July 2017.
  47. Hardy, Brian (1997). London Underground Rolling Stock (14 ed.). Harrow: Capital Transport. pp. 44–46. ISBN 185414 193 7.
  48. "S Stock trains take to Circle line". Global Rail News. 3 September 2013. Archived from the original on 26 September 2017. Retrieved 3 September 2013.
  49. Prentice, Paul (18 September 2013). "S Stock trains enter service on the Circle and District lines". Rail (731): 26.
  50. Hendy, Peter (December 2013). "Commissioner's Report" (PDF). Transport for London. p. 5. Archived from the original (PDF) on 24 December 2013. Retrieved 21 December 2013.
  51. "Metro — London, United Kingdom". Bombardier. Retrieved 27 January 2011.
  52. "Rolling Stock: C Stock". Transport for London. Retrieved 25 November 2012.
  53. "Rolling Stock: S stock". Transport for London. Retrieved 10 January 2012. Note: The table erroneously says "Length per car", instead of "Length per train".
  54. "'S' stock making its mark". Modern Railways. London. December 2010. p. 46.
  55. Jackson 1986, p. 185.
  56. Abbott, James (January 2013). "Sub-surface renewal". Modern Railways. pp. 38–41.
  57. "London Underground and Bombardier abandon Tube signalling contract". International Railway Journal. 3 January 2014. Retrieved 2 June 2020.
  58. "London Underground resignalling reaches milestone". International Railway Journal. 13 October 2017. Retrieved 2 June 2020.
  59. "Our Upgrade Plan" (PDF). Transport for London. February 2011. Archived from the original (PDF) on 17 August 2012. Retrieved 7 December 2012.
  60. Matters, Transport for London | Every Journey. "Four Lines Modernisation". Transport for London. Retrieved 2 June 2020.
  61. Stewart, Rob (January 2013). "Cityflo 650 to control the SSR". Modern Railways. pp. 42–43.
  62. "Underground News". London Underground Railway Society. 706: 572. October 2020.
  63. "Modernisation complete as Shepherd's Bush Tube station re-opens" (Press release). Transport for London. 7 October 2008. Archived from the original on 16 August 2012. Retrieved 6 February 2013.
  64. "New Wood Lane Underground station opens" (Press release). Transport for London. 14 October 2008. Retrieved 8 December 2012.
  65. "Latimer Road station to close for three months for engineering works" (Press release). Transport for London. 14 January 2011.
  66. Butt 1995, p. 244.
  67. Butt 1995, p. 200.
  68. Jackson 1986, p. 70.
  69. Jackson 1986, p. 110.
  70. "Hadron Collider II planned for Circle Line". The Independent. London. 1 April 2010. Retrieved 2 October 2018.
  71. "April 1st: So, were you fooled...?". The Independent. London. 2 April 2010. Retrieved 2 October 2018.

Bibliography

  • Butt, R. V. J. (1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Patrick Stephens Ltd. ISBN 1-8526-0508-1.
  • Bruce, J Graeme (1983). Steam to Silver. A history of London Transport Surface Rolling Stock. Capital Transport. ISBN 0-904711-45-5.
  • Day, John R; Reed, John (2010). The Story of London's Underground. Capital Transport. ISBN 978-1-85414-341-9.
  • Green, Oliver (1987). The London Underground: An illustrated history. Ian Allan. ISBN 0-7110-1720-4.
  • Horne, Mike (2003). The Metropolitan Line. Capital Transport. ISBN 1-85414-275-5.
  • Jackson, Alan (1986). London's Metropolitan Railway. David & Charles. ISBN 0-7153-8839-8.
  • Leboff, David; Demuth, Tim (1999). No Need to Ask!. Capital Transport. ISBN 1-85414-215-1.
  • Rose, Douglas (December 2007) [1980]. The London Underground: A Diagrammatic History (8th ed.). Capital Transport. ISBN 978-1-85414-315-0.
  • Simpson, Bill (2003). A History of the Metropolitan Railway. Volume 1: The Circle and Extended Lines to Rickmansworth. Lamplight Publications. ISBN 1-899246-07-X.

Further reading

  • Croome, Desmond F. (1 February 2003). Circle Line. Capital Transport. ISBN 978-1-85414-267-2.
  • London Railway Map. Quail Maps. 2001. ISBN 978-1898319-54-2.
  • Yonge, John (November 2008) [1994]. Jacobs, Gerald (ed.). 5: Southern & TfL. Railway Track Diagrams (3rd ed.). Bradford on Avon: Trackmaps. ISBN 978-0-9549866-4-3.

KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.