Gangxia North station

Gangxia North station (Chinese: 岗厦北站; pinyin: Gǎngxià Běi Zhàn) is a station of Line 2 and Line 10 of the Shenzhen Metro. Line 2 platforms opened on 28 June 2011. Line 10 platforms do not open to transfer Line 2 before the transfer passage between Line 2 and Line 10 complete, plan to open at 2021.[1]

Gangxia North

岗厦北
LocationFutian District, Shenzhen, Guangdong
China
Operated bySZMC (Shenzhen Metro Group)
Line(s)
Platforms2 (1 island platform)
Construction
Structure typeUnderground
History
Opened28 June 2011
Services
Preceding station Shenzhen Metro Following station
Civic Center
towards Chiwan
Line 2 Huaqiang North
towards Yantian Road
     Line 10 does not stop here


It will be a massive transfer station of Line 10, Line 11 and Line 14 in the future.[2] Measuring 220,000 meters square, it will be nearly twice as large as the nearby intermodal Futian Station.[2]

Station layout

G - Exit
B1F
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
Transfer Passage between Line 2 and Line 10 (Under construction)
B2F
Platforms
Platform 1      Line 2 towards Chiwan (Civic Center)
Island platform, doors will open on the left
Platform 2      Line 2 towards Yantian Road (Huaqiang North)
Platform      Line 11 towards Bitou (Futian) (under construction)
Island platform, doors of will open on the left (Line 11) / right (Line 14)
Platform      Line 14 termination platform (under construction)
Platform      Line 14 towards Shatian (Huangmugang) → (under construction)
Island platform, doors will open on the right (Line 14) / left (Line 11)
Platform      Line 11 towards Hongling South (The Eighth Affiliated Hospital of Sun Yat-sen University) → (under construction)
B3F
Platforms
[lower-alpha 1]
Side platform, doors will open on the right
Platform      Line 10 towards Futian Checkpoint (Gangxia) (does not stop here)
Platform      Line 10 towards Shuangyong Street (Lianhuacun) → (does not stop here)
Side platform, doors will open on the right
  1. Do not open to transfer Line 2 before the transfer passage between Line 2 and Line 10 complete, plan to open at 2021.

Exits

Exit Destination
Exit A Galaxy Century, Caitian Road, Hong Jia Hotel, Rencai Building, Phoenix Mansion, Caihong Xindu, Top Living, Zhongshen Garden
Exit B Shennan Boulevard, Shenzhen No.1 Vocational School of Technology, Central Park, Tianmiancun, Green Oasis School

References

  1. "站点查询". Shenzhen Metro. 2020-08-05.
  2. "福田站的1.6倍!22万平"地下帝国"岗厦北超级枢纽来了". sohu.com. Retrieved 2 April 2019.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.