Line 13 (Shenzhen Metro)

Line 13 of the Shenzhen Metro is one of the four new metro lines of Phase IV expansion under construction in the city of Shenzhen, Guangdong.[2] It is expected to be completed and operational in 2022.[3] The first phase of the line will be 23 km (14 mi) long and use eight car type A trains with a maximum operating speed of 100 km/h (62 mph).[4]

Line 13
13
Overview
Other name(s)Shiyan Line
(石岩线; 石岩線; shíyán xiàn)
StatusUnder construction
LocaleBao'an and Nanshan districts
Shenzhen, Guangdong
TerminiShenzhen Bay Checkpoint
Shangwu
Stations16
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)MTR Corporation (Shenzhen)[1]
Technical
Line length22.5km
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationOverhead Line, 1,500 V DC
Operating speed100 km/h (62 mph)
Route map

Gongming North
Xiacun
Changchun Road
Gongming Square
Gongming South
Dongzhou Road
Gongming Depot
Yueliang Road
Fenghuang Town
Tongguan Road
6 (Branch Line) to Science City East
Guangmingcheng
6 (Branch Line)
Guangming Central Hospital
Phase 2 (Northern Extension)
Phase 1
Shangwu
Shiyan
Luozu
Yingrenshi
Baimang
Liuxiandong
Shigu
Xili railway station
Songping
Kexing
1 to Luohu
Shenzhen University
Yuehaimen
Keyuan
Houhai
Dengliang East
Neihu Stabling Yard
Shenzhen Bay Checkpoint
Phase 1
Phase 2 (Southern Extension)
Sunrise Amphitheatre
Opera House
Dongjiaotou

Stations

Stage Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Southern Extension Dongjiaotou 东角头 2 Nanshan
Opera House 歌剧院
Sunrise Amphitheatre 日出剧场
Line 13 Shenzhen Bay Checkpoint 深圳湾口岸
Dengliang East 登良东
Houhai 后海 2 11
Keyuan 科苑 2
Yuehaimen 粤海门 9
Shenzhen University 深大 1
Kexing 科兴
Songping 松坪
Xili Railway Station 西丽火车站 ELQ
15
Shigu 石鼓
Liuxiandong 留仙洞 5
Baimang 白芒
Yingrenshi 应人石 Bao'an
Luozu 罗租
Shiyan 石岩
Shangwu 上屋 6
Northern Extension Guangming Central Hospital 市中医院 Guangming
Guangmingcheng 光明城 6 Branch Line
Tongguan Road 同观路
Fenghuang Town 凤凰城 6
Tongguan Road 月亮路
Dongzhou Road 东周路
Gongming South 公明南
Gongming Square 公明广场 6
Changchun Road 长春北路
Xiacun 下村
Gongming North 公明北  5 

Phase 1 (Shenzhen Bay Checkpoint - Shangwu)

Phase 1 of Line 13 will run through Bao'an and Nanshan districts with 16 stations.[4] It will link Shenzhen Bay Immigration Checkpoint to Xili Lake near Shenzhen University.[5] It will open in 2022.[6]

Xili Railway station (Infill station)

It will opens at December 2024.

Northern Extension (Shangwu - Gongming North)

It will open at December 2024.

Southern Extension (Dongjiaotou - Shenzhen Bay Checkpoint)

It will start construction in late 2020 and open in 2025.[7]

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.