The Goodwill Bridge is a pedestrian and cyclist bridge which spans the Brisbane River in Brisbane, Queensland, Australia. The bridge connects the South Bank Parklands in South Brisbane to Gardens Point in the Brisbane CBD.

Goodwill Bridge
Goodwill Bridge
Coordinates27.480429°S 153.02717°E / -27.480429; 153.02717
CarriesPedestrians and cyclists
CrossesBrisbane River
LocaleBrisbane, Queensland, Australia
Characteristics
DesignSteel Through arch bridge
Total length450 metres (1,480 ft)
Width6.5 metres (21 ft)
Longest span102 metres (335 ft)
Clearance below11.4–12.7 metres (37–42 ft) from high water level to (the underside of?) the bridge deck
History
Engineering design byOve Arup & Partners
Opened21 October 2001[1]
Location
View of the Lower North Bank from the Goodwill Bridge
View of the South Bank from the Goodwill Bridge

The Goodwill Bridge was opened on 21 October 2001 and takes its name from the Goodwill Games, which were held in Brisbane that year.[2][3][4][5] The bridge does not carry any motorised traffic it is shared by pedestrians, cyclists and inline skaters.

Structure

Two main components of The Goodwill Bridge are the pavilion and the arch. The pavilion is located in the middle of the Brisbane River between the arch and the city approach. It is a fundamental component of the pedestrian and cycle bridge and supports one end of the arch. The arch is 102 metres (335 feet) in length, 10 metres (33 feet) wide and 15 metres (49 feet) high and weighs 360 long tons (366 t; 403 short tons).

Specifications

  • Width: 6.50 metres (21.3 feet)
  • Height: Clearance for River Vessels 11.4 to 12.7 metres (37 to 42 feet) from high water level to the bridge deck (same height as Victoria and Captain Cook bridges)
  • Arch: 102 metres (335 feet) in length, 10 metres (33 feet) wide and 15 metres (49 feet) high
  • Bridge Deck: The bridge deck wearing surface is concrete with a broom finish to provide a safe foothold. It incorporates coloured concrete and applied finish bandings which signify areas where caution is required.
  • Security: Six closed circuit TV cameras are spread across the bridge and are monitored from the South Bank Security Control Room.
  • Architects: Cox Rayner[6]
  • Design preparation: Ove Arup and Partners[6]
  • Construction Company: John Holland Group[6]
  • Project Manager: Jack Sullivan, AMTEC International Construction Services
  • Officially Opened: The Premier of Queensland, The Honourable Peter Beattie, officially opened The Goodwill Bridge on 21 October 2001.[1]
  • Total length: 450 metres (1,480 feet)[6]
  • Bridge Foundations: The bridge's 45 foundation piles range in diameter from 500 to 1,500 millimetres (19.7 to 59.1 inches) and are reinforced with 350-grade steel and 60 cubic metres (78 cubic yards) of concrete.
  • Central Arch span: 102 metres (335 feet)
  • Construction overseen by Mark Carney

History

The structure was built downstream at Hemmant and took three months to construct. On completion barges floated the arch upstream at low tide it was floated under the Captain Cook Bridge and then lifted as a single structure into its final resting position by two heavy lift towers.[7][8][9][10] Four strategically positioned platforms and the pavilion-viewing platform provide rest points for pedestrians and cyclists. With exception of cables, all materials utilised in the construction of the arch and the pavilions were sourced from local suppliers.

Controversy arose during the construction of the bridge over its growing cost, and a subsequent budgetary blow-out which resulted in the use of $20.3 million in government funds.[11] The bridge was scheduled to be opened by Queen Elizabeth II during her visit for the Commonwealth Heads of Government Meeting summit to be held in Brisbane, but after the postponement of that meeting and change of venue to Coolum on the Sunshine Coast in the wake of the terrorist attacks on 11 September 2001, the bridge was instead opened by Queensland Premier, Peter Beattie.[1][11]

Usage

The Goodwill Bridge connects the South Bank Parklands to Gardens Point.

Over 40,000 people walk or cycle across the bridge each week and it is clearly established as a major access point between South Bank and the city. Spanning the Brisbane River between the southern end of South Bank Parklands and the CBD via the Queensland University of Technology campus, the bridge provides a vital link for pedestrians and cyclists, especially since the closest train station to QUT is in South Bank.

The bridge is also popular amongst those who like to maintain fitness, providing a link for a continuous run. Traceurs also use the bridge not only to cross, but in strength training as a distance to travel in the Quadrupedel movement (which provides an arm and leg workout), and also refines coordination skills.

The bridge innovatively includes several outspanning seating bays which allow for contemplation of the river and relaxation.

The architectural design has received mixed reviews; many people see it as a work of art, while others consider it a monstrosity. This is likely due to its unconventional form; for instance, the bridge is entirely asymmetrical, and does not appear to follow any particular scheme with regards to placement of features.

Halfway across the bridge, there is a coffee cart with seating and cushions .

See also

References

  1. Spann, Craig (22 October 2001). "Goodwill flows as new bridge comes on stream". The Courier-Mail (1 ed.). p. 3.
  2. "Goodwill Bridge - Visit Brisbane". Visit Brisbane. Retrieved 20 March 2018.
  3. "Goodwill Bridge - Attraction - Queensland". Retrieved 20 March 2018.
  4. "Goodwill Bridge". Retrieved 20 March 2018.
  5. GmbH, Emporis. "Goodwill Bridge, Brisbane - 269231 - EMPORIS". www.emporis.com. Retrieved 20 March 2018.
  6. Musgrave, Elizabeth (September 2002). "Goodwill overture". Architecture Australia. 91 (5): 66. ISSN 0003-8725. Retrieved 20 July 2011.
  7. Jones, Chris (17 August 2001). "All systems stop for bridge span plan". The Courier-Mail (1 ed.). p. 1.
  8. Parnell, Sean (18 August 2001). "Footbridge span continues sailing on troubled waters". The Courier-Mail (1 ed.). p. 6.
  9. Wenham, Margaret (20 August 2001). "Final journey an unabridged success". The Courier-Mail (6 ed.). p. 1.
  10. Parnell, Sean (21 August 2001). "Bridge in suspense waits for dawn". The Courier-Mail (1 ed.). p. 1.
  11. Yallamas, Lisa (9 October 2001). "Footbridge stands firm in weight test". The Courier-Mail. p. 9.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.