Hongtudi station
Location | Chongqing China | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Operated by | Chongqing Rail Transit Corp., Ltd | |||||||||||||||
Line(s) | 6 10 | |||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Below ground | |||||||||||||||
Depth | 94.467 m (309.93 ft) | |||||||||||||||
Disabled access | 4 accessible elevators | |||||||||||||||
Other information | ||||||||||||||||
Station code | 6/10、10/10 | |||||||||||||||
History | ||||||||||||||||
Opened |
| |||||||||||||||
Services | ||||||||||||||||
|
Hongtudi is an interchange station on Line 6 and Line 10 of Chongqing Rail Transit in Chongqing Municipality, China.[1][2] It is located in the Jiangbei District.
History
In 2012, the opening of the Line 6 platforms made the station the deepest subway station in China, at over 60 meters below the surface.[3] In 2017, the station became even deeper with the opening of Line 10 platforms, reaching over 94 meters below the ground.[4] The new Line 10 platforms became one of the deepest subway stations in the world after Arsenalna Station in the Kyiv Metro. The journey from the surface to Line 10 platforms takes over 5 minutes.[5] The station's extreme depth, large transfer demand between the two lines and numerous entrances on the surface necessitates the need for over 91 escalators to be installed throughout the entire station.[6]
Station structure
Floors
1F | Above ground | Entrance/Exits, Accessible elavators | |
Entrance/Exit passageways | Exits 1A, 1B | ||
Exits 3A, 3B | |||
B1 | Line 6 Station Concourse | Ticket machines, Ticket gates, Customer service center, Interchange channel for 10 | |
B2 | Line 6 Platform | Trains, One-way Interchange channel from 10 | |
Interchange channel | Interchange between 6 & 10 | ||
B3 | Line 10 Station Concourse | Ticket machines, Ticket gates, Customer service center, Interchange channel for 6 | |
B4 | Line 10 Platform | Trains, One-way Interchange channel to 6 | |
Line 6 Platform
- Platform layout
An island platform is used for Line 6 trains travelling in both directions.
To 6 Huangnibang&Beibei | ← | 6/10 | ← | ||
---|---|---|---|---|---|
Island Platform
Doors open on the left |
|||||
→ | 6/10 | → | To 6 Wulidian & Chayuan |
Line 10 Platform
- Platform layout
An island platform is used for Line 10 trains travelling in both directions.
To 10 Liyuchi & Lanhualu | ← | 10/10 | ← | ||
---|---|---|---|---|---|
Island Platform
Doors open on the left |
|||||
→ | 10/10 | → | To 10 Wangjiazhuang |
Exits
There are a total of 4 entrances/exits currently in use for the station. Exit 2 closed after the opening of Line 10.
Exit | To | |
---|---|---|
1A | Wuhong Road, ChuangxinLuse Garden residential block | |
1B | Wuhong Road, Jinke Garden residential block | |
3A | Wuhong Road, Tian'an Dingdu residential block, Ji'an Yuan residential block | |
3B | Wuhong Road, Chang'an Lidu residential block |
Surroundings
- Nearby places
- Wuhong Road
- ChuangxinLuse Garden residential block
- Jinke Garden residential block
- Tian'an Dingdu residential block
- Ji'an Yuan residential block
- Lidu residential block
- Nearby stations
- Liyuchi(a Line 10 station)
References
- 重庆市轨道交通 Archived 2013-03-15 at the Wayback Machine
- Transportation in Chongqing
- 刘春暖. "埋深达94米相当于31层楼高 "全国最深地铁站"下还有更深地铁站_社会新闻_大众网". www.dzwww.com (in Chinese). Retrieved 2018-01-27.
- "重庆10号线红土地站刷新"全国最深地铁站"深度". news.sina.com.cn. Retrieved 2017-12-30.
- "【齋睇就好攰】強國最深地鐵站 搭程車要落31層樓..." Apple Daily 蘋果日報. Retrieved 2018-01-27.
- "全国最深地铁站红土地站埋深94米 相当31层楼高". www.hi.chinanews.com. Retrieved 2018-01-27.