Line 3 (Chongqing Rail Transit)

CRT Line 3 (and the branch line branded as Konggang line) runs from north to south, linking the districts separated by Chongqing's two main rivers, the Yangtze (Chang Jiang) and Jialing rivers. The first phase of the line began construction on 5 April 2007. The initial segment from Lianglukou to Yuanyang (18 stations, 17.5 km (10.9 mi)) opened on September 29, 2011, with a northern extension from Yuanyang to Jiangbei Airport opening on December 30, 2011[3] and a southern extension from Ertang to terminus Yudong on December 28, 2012.[4] At 55.5 km (34.5 mi), plus 9.97 km (6.20 mi) for the Jurenba branch line opened on December 28, 2016, Line 3 is the longest single monorail in the world by track length.[5][6] Line 3 is also the world's busiest monorail line with a daily ridership of over 675,000 passengers per day.[1]

Line 3
Line 3 train crossing Jialing River
Overview
Other name(s)Line 3b or Konggang line (空港线)
StatusIn Operation
TerminiYudong / Bijin
Terminal 2 of Jiangbei Airport / Jurenba
Stations45
Service
TypeStraddle-beam monorail
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit Corp., Ltd
Daily ridership682,800 (2014 Daily Avg.)[1]
1,080,000 (2016 Peak)[2]
History
Opened29 September 2011 (2011-09-29)
Technical
Line length66 km (41 mi)
Route map

Yudong
 2 
Jinzhu
Yuhulu
Daojiao Depot
Xuetangwan
Dashancun
Huaxi
Chalukou
Jiugongli
Qilong
Bagongli
Chongqing Jiaotong University
Liugongli
Chongqing Technology
and Business University
Sigongli
 Loop 
Nanping
 10 
Gongmao
Tongyuanju
Lianglukou
 1 
Niujiaotuo
 2 
Yuao Rail Transit Bridge
across Jialing River
Huaxin
Guanyinqiao
 9 
Hongqihegou
 6 
Jiazhoulu
 4 
Zhengjiayuanzi
Tangjiayuanzi
Shiziping
S. Square of Chongqing
N. Railway Station
 Loop   10 
Longtousi
Tongjiayuanzi Depot
Tongjiayuanzi
Jinyu
Jintonglu
Yuanyang
The Expo Garden
 5 
Cuiyun
Changfulu
Huixing
 9 
Shuanglong
Airport branch
Bijin
Jiangbei Airport
Terminal 2
 10 
Shuangfengqiao
Konggang Square
Gaobao Lake
Huancheng North Road Depot
Guanyuelu
Lianhua
Jurenba
=
Virtual interchange: transport
card only, re-entry required.
Interior of a Line 3 train showing open gangway design.

There are interchange stations in central Yuzhong district for transfer to Jiefangbei CBD with Line 1 at Lianglukou and with Line 2 at Niujiaotuo.

Opening timeline

SegmentCommencementLengthStation(s)Name
Lianglukou Yuanyang 29 September 2011 17.323 km (10.76 mi) 11 Phase 1 & 2 (initial section)
Yuanyang Changfulu 8 October 2011 4.9 km (3.04 mi) 3 Phase 2 (2nd section)
Ertang Lianglukou 30 December 2011 8.66 km (5.38 mi) 5 Phase 1 (final section)
Changfulu Terminal 2 of Jiangbei Airport 6.9 km (4.29 mi) 4 Phase 2 (final section)
Tongjiayuanzi Infill station 1
Hongqihegou 1 March 2012 Infill station 1
Zhengjiayuanzi 1 May 2012 Infill station 1
Yudong Ertang 28 December 2012 16.197 km (10.06 mi) 7 Line 2 & 3 connector project
Gongmao, Tongyuanju Infill stations 2
Jinzhu, Huaxi, Chalukou 31 January 2013 Infill stations 3
Longtousi 5 February 2013 Infill station 1
Bijin Jurenba 28 December 2016 11.0 km (6.84 mi) 6 Airport line

Service routes

Current Stations

Service
routes
Station
Station name Connections Distance
km
Location
English Chinese
3/01 Yudong 鱼洞  2  0.00 0.00 Ba'nan
3/02 Jinzhu 金竹 1.95 1.95
3/03 Yuhulu 鱼胡路 1.65 3.60
3/04 Xuetangwan 学堂湾 2.25 5.85
3/05 Dashancun 大山村 1.65 7.50
3/06 Huaxi 花溪 2.30 9.80
3/07 Chalukou 岔路口 1.90 11.70
3/08 Jiugongli 九公里 1.20 12.90
3/09 Qilong 麒龙 1.00 13.90
3/10 Bagongli 八公里 1.35 15.25
3/11 Chongqing Jiaotong University[7] 重庆交通大学[7] 1.35 16.60 Nan'an
3/12 Liugongli 六公里 1.05 17.65
3/13 Chongqing Technology and Business University[7] 重庆工商大学[7] 1.05 18.70
3/14 Sigongli 四公里  Loop  1.05 19.75
3/15 Nanping 南坪  10  1.30 21.05
3/16 Gongmao 工贸 2.25 23.30
3/17 Tongyuanju 铜元局 1.30 24.60
3/18 Lianglukou 两路口  1  CQW 1.85 26.45 Yuzhong
3/19 Niujiaotuo 牛角沱  2  1.05 27.50
3/20 Huaxinjie 华新街 0.85 28.35 Jiangbei
3/21 Guanyinqiao 观音桥  9  1.15 29.50
3/22 Hongqihegou 红旗河沟  6  1.50 31.00 Yubei
3/23 Jiazhoulu 嘉州路  4  1.20 32.20
3/24 Zhengjiayuanzi 郑家院子 1.30 33.50
3/25 Tangjiayuanzi 唐家院子 1.00 34.50
3/26 Shiziping 狮子坪 1.05 35.55
3/27 Chongqing North Station (South Square)[lower-alpha 1] 重庆北站南广场  10   Loop   YW  CUW 0.60 36.15
3/28 Longtousi 龙头寺 1.15 37.30
3/29 Tongjiayuanzi 童家院子 1.60 38.90
3/30 Jinyu 金渝 1.65 40.55
3/31 Jintonglu 金童路 1.20 41.75
3/32 Yuanyang 鸳鸯 2.25 44.00
3/33 The EXPO Garden 园博园  5 [lower-alpha 2] 1.55 45.55
3/34 Cuiyun 翠云 1.50 47.05
3/35 Changfulu 长福路 1.70 48.75
3/36 Huixing 回兴 1.90 50.65
3/37 Shuanglong 双龙 1.55 52.20
3/38 Bijin 碧津 2.10 54.30
3/39 Terminal 2 of Jiangbei Airport 江北机场T2航站楼  10  CKG 3.40 57.70
Northern extension (also known as Konggang branch)
3/40 Shuangfengqiao 双凤桥 2.00 59.70 Yubei
3/41 Konggang Square 空港广场 0.90 60.6
3/42 Gaobaohu 高堡湖 2.05 62.65
3/43 Guanyuelu 观月路 2.80 65.45
3/44 Lianhua 莲花 1.20 66.65
3/45 Jurenba 举人坝 1.60 68.25
  1. The former English translation is South Square of Chongqingbei Railway Station, which has been changed since the opening of the Line 10's station
  2. Out of system transfer via The EXPO Garden Center

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.