Khyber train safari
The Khyber train safari (Urdu: خیبر بخار سفاری, Pashto: د خیبر تپ صفري) is a tourist train, operated and maintained by Tourism Corporation of Khyber Pakhtunkhwa and Pakistan Railways between Peshawar and Attock Khurd.[1] The trip takes approximately 1 hour and 26 minutes to cover a published distance of 69 kilometres (43 mi), traveling along an entire stretch of the Karachi–Peshawar Railway Line.[2] It is the only passenger line in Pakistan still operating steam engines.
Overview | |
---|---|
Service type | Tourist train |
First service | April 11, 2015 |
Current operator(s) | Tourism Corporation of Khyber Pakhtunkhwa |
Route | |
Start | Peshawar Cantonment |
End | Attock Khurd |
Distance travelled | 69 kilometres (43 mi) |
Average journey time | 1 hours, 26 minutes |
Service frequency | Daily |
Train number(s) | 1UP (Peshawar→Attock Khurd) 2DN (Attock Khurd→Peshawar) |
Technical | |
Track gauge | 1,676 mm (5 ft 6 in) |
Track owner(s) | Pakistan Railways |
Overview | |
---|---|
Service type | Tourist train |
First service | 1996 |
Last service | 2006 |
Former operator(s) | Sehrai Travels’ & Sarhard Tourism Corporation (1996 to 2006) Pakistan Tourism Development Corporation (2006) |
Route | |
Start | Peshawar Cantonment |
End | Landi Khana |
Distance travelled | 58 kilometres (36 mi) |
Average journey time | 1 hours, 52 minutes |
Service frequency | Daily |
Train number(s) | 1UP (Peshawar→Landi Kotal) 2DN (Landi Kotal→Peshawar) |
Technical | |
Track gauge | 1,676 mm (5 ft 6 in) |
Track owner(s) | Pakistan Railways |
History
Passenger service (1925–1982)
Regular passenger service along the Khyber Pass Railway began on 4 November 1925 between Peshawar City railway station and Landi Kotal railway station. The train took passengers through rugged mountainous terrain reaching a height of 1,200 m (3,900 ft) to reach Landi Kotal and covering a total distance of 52 km (32 mi) through 34 tunnels and 92 bridges and culverts. The oil-fired steam engines, which pushed and pulled the carriages from the rear and front, were built by Vulcan Foundry and by Kitson & Co in the United Kingdom.[3] One of the unusual features of this train journey was that its route passed across Peshawar Airport's main runway.[4]) On 3 April 1926, the railway was extended to Landi Khana, just 3 kilometers from the Torkham border crossing with Afghanistan. In 1932, the Landi Kotal to Landi Khana section of railway was closed down at the insistence of Afghan government. Regularly scheduled rail service continued between Peshawar and Landi Kotal until 1982, when it stopped due to lack of commercial value. The 2006 monsoon season rains in the Khyber Pass washed away significant sections of the railway. The track as of today is closed for all rail traffic.
Khyber steam safari (1996–2006)
In 1996, Sehrai Travels’ in collaboration with Sarhard Tourism Corporation launched the Khyber Steam Safari for foreign and local tourists[5] and was described by Time Magazine as "a journey into time and history". The train consisted of a refurbished parlour car and two second class coaches pulled by two vintage steam locomotives, as those used originally on the Khyber Pass Railway. The train was run on the first Sunday of every month as a charter, however the local population around the Khyber Pass were allowed free access. Pakistan Tourism Development Corporation took over operations in 2006 and in the same year the service was suspended due to monsoon damage of the line.
Khyber train safari (2015–present)
In 2015, the Tourism Corporation Khyber Pakhtunkhwa took control of the former Khyber Steam Safari and renamed it to Khyber Train Safari (also known as Abaseen Steam Safari).[6] However, the route now takes the train between Peshawar and Attock Khurd.[7][8][9]
Route
- Peshawar Cantonment–Attock Khurd via Karachi–Peshawar Railway Line (presently operating Khyber Train Safari)
- Peshawar City–Landi Kotal via Khyber Pass Railway (now defunct Khyber Steam Safari)
Station stops
Khyber Train Safari
- Peshawar Cantonment
- Peshawar City
- Nasarpur
- Taru Jabba
- Pabbi
- Pir Piai
- Khushhal
- Nowshera Junction
- Hayat Sher Pao Shahid
- Akora Khattak
- Jhangira Road
- Khairabad Kund
- Attock Khurd
Khyber Steam Safari
- Peshawar City
- Peshawar Cantonment
- Jamrud
- Bagiarari
- Medanak (1st Reversing Station)
- Chaghi (2nd Reversing Station)
- Shahgai
- Kata Kushta
- Zintara
- Sultan Khel
- Landi Kotal
- Torra Tigga (3rd Reversing Station)
- Landi Khana (4th Reversing Station)
Equipment
Peshawar locomotive shed continues to maintain 3 steam engines, which were used on the original passenger service on the Khyber Pass Railway, the Khyber steam safari and now on the Khyber train safari.
- 2-8-0 HG/S #2216 built by Kitson and Company in 1916
- 2-8-0 HG/S #2277 built by Vulcan Foundry in 1923
- 2-8-0 HG/S #2306 built by Vulcan foundry in 1923
References
- "Peshawar to Attock Safari train". DAWN.COM. 2 April 2015.
- "IRFCA: Pakistan Railway Train Names". Owais Mughal. Retrieved 6 April 2013.
- Hughes, H. (1990) Indian locomotives: Part 1 - Broad Gauge 1851-1940 Harrow: The Continental Railway Circle.
- Shah, Syed Inayat Ali The derailed safari train Archived 2012-08-29 at the Wayback Machine The Daily Jang jang.com.pk Retrieved on 20 September 2005
- "Khyber Safari — out of steam - DAWN.COM".
- Report, Bureau (30 November 2012). "Safari train set to hit the track in KP". DAWN.COM.
- "404 - Page Not Found". Cite uses generic title (help)
- http://pakhtunkhwa.pk/content/tourism-corporation-khyber-pakhtunkhwa-will-run-safari-train-peshawar-attock
- "Another direction: Khyber Steam Safari train resumes its magic after 2007". The Express Tribune. 2 December 2012.