The Leigh-Salford-Manchester Bus Rapid Transit scheme in Greater Manchester, England provides transport connections between Leigh, Atherton, Tyldesley, Ellenbrook and Manchester city centre via Salford. The guided busway and bus rapid transit (BRT) scheme promoted by Transport for Greater Manchester (TfGM) opened on 3 April 2016. Built by Balfour Beatty at a total cost of £122 million to improve links from former coalfield towns into Manchester city centre, the busway proposal encountered much opposition and a public enquiry in 2002 before construction finally started in 2013. A branch route from Atherton, and an extension to the Manchester Royal Infirmary have been added to the planned original scheme.

Leigh-Salford-Manchester Bus Rapid Transit
A Vantage bus at Newearth Road bus stop on the guided busway section
Overview
OwnerTransport for Greater Manchester
LocaleWigan
Salford
Manchester
Transit typeGuided busway and Bus rapid transit
Annual ridership3 million
WebsiteTfGM - Bus Priority - Guided Busway
Operation
Began operation3 April 2016
Operator(s)First Greater Manchester
Technical
System length22 kilometres

Twenty-five purple-liveried Wright Eclipse Gemini 3 bodied Volvo B5LH hybrid double-decker equipped with CCTV and next stop audio and visual announcements operate the service. Stops on the guided busway section have level-boarding from platforms equipped with passenger information display screens.

From Leigh, the V1 limited-stop bus service joins seven kilometres of guided busway to Ellenbrook, six kilometres of bus lanes on the East Lancashire Road and sections of reserved bus lanes through Salford and Manchester city centres. The V2 service from Atherton to Manchester joins the guided busway at Tyldesley. Both services run via the University of Manchester and Manchester Metropolitan University before terminating at Manchester Royal Infirmary.[1]

Background

Leigh, one of the largest towns in Britain without a railway station after the closure of the Tyldesley Loopline in 1969, suffered from poor transport connections to neighbouring towns. A guided busway scheme using a kerbed concrete track was proposed and constructed using the former railway trackbed from Leigh to Ellenbrook to improve access to Manchester city centre from Leigh, Tyldesley and Ellenbrook and regenerate areas of the former Lancashire Coalfield.

When proposed, the busway was controversial and encountered much local opposition.[2] It was branded the 'Misguided Busway' by a Salford councillor.[3] Critics contested claims by TfGM that the creation of within-carriageway bus lanes would not reduce general traffic capacity along the East Lancashire Road, a heavily congested radial route for traffic heading towards Manchester and Salford city centres; but instead increase it.[4]

Route

Cooling Lane stop on guided section and multi-user path
Leigh-Salford-Manchester
Bus Rapid Transit
Bag Lane
Leigh bus station
Mealhouse Lane
Spinning Jenny Way
for The Loom
Tyldesley Road
Atherton Arms
East Bond Street Park & Ride
130
Tyldesley Road
Sacred Heart Church
Holden Road
Atherton
Tyldesley
Leigh
Tyldesley
Stanley Street
Tyldesley Town Centre
Higher Folds
West Cooling Lane
Astley Street Park & Ride
45
Hough Lane
Sale Lane
Tyldesley
Ellenbrook
Newearth Road
Newearth Road
at East Lancs Road
Ellenbrook
Worsley
Walkden Road
on East Lancs Road
Old Clough Lane
on East Lancs Road
Worsley
Wardley
Park & Ride
on East Lancs Road
250
Wardley
Swinton
Moorside Road
on East Lancs Road
Worsley Road
on East Lancs Road
Barton Road
on East Lancs Road
Swinton
Pendleton
Pendleton Church
Pendleton
Salford
University of Salford
Frederick Road Campus
Salford Crescent station
University of Salford
Peel Park Campus
University of Salford
Adelphi House
Salford Cathedral
Salford Central station
Salford
Manchester
Bridge Street
for Deansgate
John Dalton Street
Albert Square
St. Peter’s Square
Princess Street
Portland Street
Oxford Road station
Route no longer in use
Piccadilly Gardens
MMU
John Dalton Building
Stevenson Square
MMU
All Saints Campus
Manchester Museum
University of Manchester
Whitworth Art Gallery
Manchester Royal Infirmary [5]
Key
Street running
Guideway running
with bus lane(s)[6][7]
n
Park & Ride
with n spaces

The BRT route begins at Leigh bus station, and joins the guided section at East Bond Street. It proceeds through Leigh and along the converted rail alignment via Tyldesley to Newearth Road in Ellenbrook. An improved bus route from Atherton joins the route at Astley Street, Tyldesley. From Ellenbrook the route continues via bus lanes alongside the A580 East Lancashire Road, serving Worsley and Swinton before joining the A6 at Irlams o' th' Height. All stops along the A580 bus lanes are bus bays so that conventional stopping services can be overtaken by limited-stop expresses. It passes the University of Salford/Salford Crescent railway station before continuing through Manchester city centre and along bus-only lanes on Oxford Road to Manchester Metropolitan University, Manchester University and the Central Manchester Hospitals.[8][9] Buses use Bolton Road in Salford when Broad Street is congested.[10]

The guided section has stops at East Bond Street, Holden Road in Leigh and Cooling Lane between Higher Folds and Squires Lane in Tyldesley, Astley Street, Hough Lane and Sale Lane in Tyldesley and Newearth Road in Ellenbrook. The multi-user path for walkers, horse riders and cyclists alongside the guided section provides access for emergency vehicles and maintenance.[11] For cyclists the path from Tyldesley to Ellenbrook is part of the National Cycle Network Route 55.[12]

The route from Leigh to Central Manchester Hospitals has 36 stops and the connecting route from Tyldesley to Atherton has five.[5] Park and ride facilities are provided at East Bond Street, Astley Street and Wardley (where the A580 road passes under the M60 motorway).[13]

Services

First Greater Manchester runs the service under a 10 year contract from TfGM,[14] branded Vantage.[15] Service V1 operates from Leigh and V2 from Atherton; with additional V4 services from Ellenbrook in the weekday morning peak period that does not use the guided section of the route.[16] Timetabled journey times are 55 minutes from Leigh and Atherton to Albert Square, Manchester at peak periods; 45 minutes daytime off-peak and 40 minutes in evenings and early mornings.[17] In daytime operation from Monday to Saturday at least eight buses per hour run in each direction on the guided section, four on the Leigh to Tyldesley section and four from Atherton joining the Tyldesley to Ellenbrook section.[18]

The earliest weekday departures from Leigh/Atherton are at 04:00/04:29 respectively; and last trips from Manchester Royal Infirmary at 24:00/23:45.[19] Two additional V1 services run from Leigh into Manchester in the weekday morning peak; three additional services return to Leigh in the weekday evening peak. Four further additional V4 services run into Manchester in the morning peak, starting from Ellenbrook [20]

The introduction of the Vantage services resulted in the withdrawal of a number of services by operator First.[21] Others were amended to join the A580 bus lanes east of Boothstown.[22]

The services were amongst those set to transfer to Go North West when it took over First's Cheetham Hill depot in 2019,[23] but it was later announced that First will continue to operate the service.[24]

Operation

Vantage bus on the guided busway
A Vantage bus crosses tramlines in St Peter's Square in Manchester city centre

After light-controlled junctions along the East Lancashire Road were upgraded with SCOOT adaptive signalling in July 2016, TfGM reported in the October that traffic journey times on this section had returned to pre-construction levels in the morning peak while accommodating significant additional traffic.[25]

In the first six months of operation, more than 900,000 passenger journeys were made. A survey of users published in October 2016 revealed that 20% of passengers had switched from using their cars for the same journey, and nearly all respondents would recommend the service.[26][27] More than a quarter of busway users walked or travelled more than a kilometre to reach the busway.[28] By the third year of operation, it was being estimated that 580,000 car trips per year along the BRT route had transferred to bus ridership.[29]


The service attracted about 28,000 passengers per week when it started in April 2016 rising to 45,000 by the autumn and 55,000 in the run up to Christmas 2016.[30] In the first year more than 2.1 million passengers were carried; increasing to approximately 2.6 million in the second,[31] and 3 million in the third.[32] By December 2017, weekly ridership had increased to 62,000.[33] This has further increase a record 62,700 passengers in September 2018.[34]

Buses

Services were initially operated by 20 Wright Eclipse Gemini 3 bodied Volvo B5LH hybrid double-decker buses in purple-livery. They are equipped with CCTV and next stop audio and visual announcements, USB charging points and free Wi-Fi.[35] Five more buses were purchased in January 2017 to provide extra capacity at busy times and facilitate the extended service to Central Manchester Hospitals.[10][36] It is required that buses that operate the busway service are replaced after 5 years of service. Further buses are scheduled to enter service in September 2018. These will operate the V4 service from Ellenbrook, and will be standard vehicles not adapted for busway running.[37]

In February 2019, TfGM were successful in bidding for funding support in buying an additional 10 electric buses for busway operation, to enter service in March 2020.[38] These will be Alexander Dennis Enviro400 MMC double-deckers with BYD Company battery power. TfGM intend that eventually all Vantage services will be operated by electric buses; to be purchased and owned by TfGM themselves, rather than by the service operator. Five of the existing fleet of Volvo B5LH buses will be transferred to other services in Greater Manchester; and so total fleet will increase to 30, allowing increased daytime frequency on V1 services from Leigh.[39]

Stops, signalling and ticketing

Stops along the guided busway section provide level-boarding from platforms and are equipped with passenger information display screens. The guided busway crosses local roads on level, light-controlled junctions at which busway services have priority.[40] Standard First Greater Manchester fares include travel on Vantage services.[41]

Awards

The scheme won the Transport Policy, Planning and Implementation award at the Chartered Institute of Logistics and Transport North West Awards[25] and the award for sustainability at the 10th annual North West Construction Awards in 2016.[42] The launch of the Vantage service won the Transport Project of the Year category and the Leigh to Ellenbrook Guided Busway section was the winner in the Construction and Engineering category at the National and the North of England Transport Awards in December 2016.[43] Greater Manchester's Bus Priority Package won the National Transport Award for improvements to bus services in October 2017.[44]


History

Planning

A long legal process preceded the busway's construction, including a public inquiry in 2002.[45] The decision of the public inquiry was delayed because of great crested newts occupying a site on the route. The Department for Transport granted powers to build the busway in 2005 and it was projected to be built by 2009 but preliminary work only started in 2012.[46] Powers to build it are set out in the Greater Manchester (Leigh Busway) Order 2005 in the Transport and Works Act.[47] The Greater Manchester Passenger Transport Executive estimated in 2005 that the busway would generate around 2 million passenger trips per annum.[48] After the public inquiry, a branch bus route from Atherton to Tyldesley and an extension from Manchester city centre to the Manchester Royal Infirmary were added to the scheme.

Construction

The guided busway under construction at Cooling Lane, Tyldesley in January 2016

Site clearance for the dedicated busway section between Leigh and Ellenbrook took place between November 2012 and March 2013.[49] Balfour Beatty began its construction in September 2013.[50] A short section of the busway west of Newearth Road was completed in early 2015 and in the April was used for a trial of the construction method and the bus guidance system. Following delays due to bad weather and other problems, the busway works were rescheduled to be completed before the end of 2015. The service began on 3 April 2016[35] to coordinate with associated road and tram works in Manchester city centre.[51][52]

TfGM spent £122 million on bus priority investment of which the guided busway track and infrastructure cost £68 million and the rest was spent upgrading associated local roads, bus lanes and junctions. The Greater Manchester Transport Fund provided most of the funding and the Department for Transport contributed £32.5 million.[35]

References

  1. Vantage route map, retrieved 11 September 2018
  2. Gomm, Brian (19 August 2009), "Busway 'off the rails'", Leigh Journal, Newsquest Media Group, retrieved 7 August 2013
  3. "Salford Councillor says Busway will Cause Nothing But Chaos". Manchester Gazette. Archived from the original on 16 October 2013. Retrieved 16 October 2013.
  4. "Get set for four months of jams on East Lancs Road as busway work begins". Manchester Evening News. Retrieved 16 October 2013.
  5. Stopping Places, First Greater Manchester, retrieved 27 April 2017
  6. "Better journeys on the East Lancashire Road (A580)" (PDF). Transport for Greater Manchester. January 2014. Retrieved 22 October 2018.
  7. "Permanent changes to Oxford Road". Transport for Greater Manchester. Retrieved 22 October 2018.
  8. Busway – Route, Transport for Greater Manchester, archived from the original on 21 October 2013, retrieved 7 August 2013
  9. Bus Priority Package (PDF), Transport for Greater Manchester, retrieved 13 January 2016
  10. "Service Changes in Leigh, Atherton and Tyldesley". FirstGroup. FirstGroup. Retrieved 22 January 2017.
  11. Busway path completed, Leigh Journal, retrieved 19 May 2016
  12. Route 55 Map Sustrans, Sustrans, retrieved 19 May 2016
  13. Manchester Confidential "Archived copy". Archived from the original on 16 March 2015. Retrieved 11 March 2015.CS1 maint: archived copy as title (link)
  14. "TfGM Ultra Low Emission Bus Scheme Bid Submission" (PDF). Retrieved 14 October 2018.
  15. Guided busway service unveiled, Leigh Journal, 20 January 2016, retrieved 5 April 2016
  16. extra buses to run on vantage busway during rush hour, FirstGroup, retrieved 8 August 2018
  17. Timetable, First Greater Manchester, retrieved 5 April 2018
  18. Improving bus connections between Leigh, Salford and Manchester (PDF), Transport for Greater Manchester, 3 December 2011, archived from the original (pdf) on 4 March 2016, retrieved 31 October 2015
  19. Timetable, First Greater Manchester, retrieved 5 April 2018
  20. V1, V2, V4 Timetables, retrieved 8 August 2018
  21. Four bus routes to change from April, Leigh Journal, 17 February 2016, retrieved 1 February 2017
  22. Stagecoach Manchester launch new bus service
  23. Go-Ahead agrees Manchester deal Buses issue 769 April 2019 page 6
  24. First Manchester to sell Bolton bus depot and 18 services
  25. Busway priority update, Transport for Greater Manchester, 14 October 2016, retrieved 30 November 2016
  26. Our survey says…the busway is a hit with passengers, Transport for General Manchester, 6 October 2016, retrieved 7 October 2016
  27. Busway operational update, Transport for General Manchester, 18 November 2016, retrieved 11 November 2016
  28. Presentation to BRT UK (PDF), Transport for General Manchester, 16 September 2016, retrieved 27 March 2017
  29. Multi-million milestone for busy busway, Transport for General Manchester, 3 April 2019, retrieved 19 February 2020
  30. Bus Priority Update February 2017, Transport for General Manchester, 10 February 2017, retrieved 3 February 2017
  31. Bus Priority Update April 2018, Transport for General Manchester, 13 April 2018, retrieved 5 April 2018
  32. Multi-million milestone for busy busway, Transport for General Manchester, 3 April 2019, retrieved 19 February 2020
  33. Mayor sets out major transport overhaul, Transport for General Manchester, 13 December 2017, retrieved 5 April 2018
  34. Vantage busway carries record number of September passengers, Transport for General Manchester, 16 October 2018, retrieved 20 October 2018
  35. Busway begins, Bus & Coach Buyer, 5 April 2016, retrieved 6 April 2016
  36. Extra buses added to cope with guided busway demand, Leigh Journal, 28 September 2016, retrieved 28 September 2016
  37. "Vantage Busway gains extra buses from September" Coach & Bus Week issue 1354 7 August 2018 page 13
  38. "TfGM Ultra Low Emission Bus Scheme Bid Submission" (PDF). Retrieved 14 October 2018.
  39. "TfGM Ultra Low Emission Bus Scheme". Retrieved 6 February 2019.
  40. "Positive reviews following "teething problems" for new guided busway", Leigh Journal, Newsquest Media Group, 7 April 2016, retrieved 7 April 2016
  41. Manchester in advance of the start of Vantage bus services on the North West’s first ever guided busway, First Greater Manchester, 23 March 2016, retrieved 6 April 2018
  42. The North West Regional Construction Awards 2016, North West Regional Construction, retrieved 30 November 2016
  43. North of England Transport Awards winners announced, Transport Times, 8 December 2016, retrieved 1 February 2017
  44. Inspiring transport projects rewarded at National Transport Awards ceremony, Transport Times, 13 October 2017, retrieved 29 October 2017
  45. Leigh Busway Inspector's Report (PDF), Transport for Greater Manchester, archived from the original (pdf) on 3 March 2016, retrieved 6 April 2016
  46. Leigh Salford Manchester Busway Project (PDF), brtuk.org, archived from the original (PDF) on 20 May 2013, retrieved 7 August 2013
  47. The Greater Manchester (Leigh Busway) Order 2005 (pdf), Legislation.gov.uk, retrieved 6 April 2016
  48. Vaughan, Nick, The Leigh-Salford_Manchester Busway Project (PDF), retrieved 25 September 2016
  49. Construction work, Transport for Greater Manchester, archived from the original on 19 October 2013, retrieved 7 August 2013
  50. Work starts on Greater Manchester’s first guided busway, Transport for Greater Manchester, retrieved 18 September 2013
  51. Bus Priority Update, Transport for Greater Manchester, retrieved 29 June 2015
  52. TfGM http://www.tfgm.com/buspriority/Pages/website/pdfs/Letter-110116.pdf Archived 4 March 2016 at the Wayback Machine
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.