Line 18 (Chongqing Rail Transit)

Line 18 (formerly known as Line 5A) of CRT is a rapid transit line in Chongqing, China, which is expected to be opened in around 2023.[1]

Line 18
 18 
Overview
Native name重庆轨道交通18号线
StatusUnder construction
Line number18
LocaleChongqing, China
TerminiFuhualu
Tiaodeng South
Stations19
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Planned opening2023 (2023)
Technical
Line length29.45 km (18.30 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
Electrification1500 V DC Overhead line

Planned Stations

Phase I

Station
No.
Station name Connections Distance
km
Location
English (probable) Chinese
Fuhualu 富华路  9  Yuzhong
Xietaizi 歇台子  1   5  Jiulongpo
Olympic Sports Center 奥体中心  Loop 
Shipingqiao 石坪桥
Yangjiaping 杨家坪  2 
Tanzikou 滩子口
Chongqing South Railway Station 重庆南站
Huangjueping 黄桷坪
Wulongmiao 五龙庙
Qiaonancun 桥南村 Ba'nan
Waiheping 外河坪
Yuanjiawan 袁家湾
Jianjiacao 简家槽
Qiezixi 茄子溪 Dadukou
Baijusi 白居寺  2 
Funiuxi 伏牛溪
Jin'aoshan 金鳌山
Tiaodeng 跳磴  5   Jiangtiao 
Tiaodeng South 跳磴南

Phase II

  • Currently under planning
Station
No.
Station name Connections Distance
km
Location
English Chinese
Xiaoshizi 小什字  1   6  Yuzhong
Kaixuanlu 凯旋路
Shibati 十八梯
Qixinggang 七星岗  1   10 
Chongqing Railway Station 重庆站
Huangshaxi 黄沙溪
Caiyuanlu 菜袁路
Majiabao 马家堡

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.