Line 19 (São Paulo Metro)

Line 19–Sky Blue (Portuguese: Linha 19–Celeste) is a planned line of the São Paulo Metro.[2][3][4]

São Paulo Metro Line 19 (Sky Blue)
Overview
StatusIn planning
LocaleSão Paulo, Brazil
Guarulhos, Brazil
TerminiAnhangabaú (First phase)
Bosque Maia
Stations15 (First phase)
Service
TypeRapid transit
SystemSão Paulo Metro
Operator(s) Companhia do Metropolitano de São Paulo
Daily ridership500,000 (projected)[1]
History
Planned openingUnknown
Technical
Line length17.6 kilometres (10.9 mi) (First phase)
CharacterFully underground
Track gauge1,435 mm (4 ft 8 12 in)
SignallingCBTC
Route map

Campo Belo
Jesuíno Maciel
Alvorada
Hélio Peregrino
 20 
Itaim Bibi
Parque Ibirapuera
Jardim Paulista
 16 
Brigadeiro
Bela Vista
Second phase
First phase
Anhangabaú
São Bento
Pari
Silva Teles
Catumbi
Vila Maria
Curuçá
Jardim Japão
Jardim Brasil
Jardim Julieta
Vila Medeiros rail yard
Itapegica
Dutra
Vila Augusta
Guarulhos
Bosque Maia

At 17.6 kilometres (10.9 mi) in length, the line will be the first to serve the municipality of Guarulhos. Construction is expected to begin in 2021.[1]

Background

Guarulhos is the second-largest city in the state of São Paulo, yet was not served by rail transport until the opening of the CPTM commuter rail's Line 13-Jade in 2018. Thus, planning for Line 19 began to link Guarulhos to the São Paulo Metro, along with Vila Medeiros and Vila Maria.[1] It will be underground for its entire length.

Planning

São Paulo Metro originally planned to begin tendering for the construction of Line 19 in April 2020, but this was delayed to May.[5]

Stations

Station Integration City Platform[6] Status
Bosque Maia Guarulhos Side platforms Planning (first phase)
Guarulhos
Vila Augusta
Dutra
Itapegica
Jardim Julieta São Paulo
Jardim Brasil
Jardim Japão
Curuçá
Vila Maria
Catumbi
Silva Teles
Pari
São Bento
Anhangabaú
Bela Vista Planning (second phase)
Brigadeiro
Jardim Paulista  16 
Parque Ibirapuera
Itaim Bibi
Hélio Peregrino  20 
Alvorada
Jesuíno Maciel
Campo Belo

References

  1. "São Paulo Metro begins studies to build Line 19". 6 August 2019. Retrieved 6 August 2019.
  2. "PDUI-STM-RedeAltaMediaCapacidade-11-05-2016.pdf" (PDF). Retrieved 16 January 2019.
  3. http://www.domboscoitaquera.org.br/downloads/secretaria_estadual_de_transportes.pdf Seminário sobre infraestrutura e sistema viário para a copa 2014 e o desenvolvimento da zona leste, Jurandir Fernandes, Secretário dos Transportes Metropolitanos, 25/08/2011
  4. "Metrô contrata estudos para três linhas an zona norte de SP".
  5. "Contractual wrangles delay São Paulo metro schemes". Railway Gazette International. 1 April 2020. Retrieved 20 June 2020.
  6. "Licitação do projeto básico da Linha 19-Celeste do Metrô é anulada pelo TCE". Metrô CPTM (in Portuguese). 2020-09-10. Retrieved 2020-09-11.