Line 2 (Qingdao Metro)

Line 2 of Qingdao Metro (Chinese: 青岛地铁2号线) is an underground metro line in Qingdao.

Line 2
 2 
Licun Gongyuan (now Licun Park) station Line 2 platform
Overview
StatusIn operation
OwnerGovernment of Qingdao
LocaleQingdao, China
TerminiTaishan Road
Licun Park
Stations21
Service
TypeRapid transit
SystemQingdao Metro
Services1
Operator(s)Qingdao Metro Corporation
Rolling stockChinese Type B1
History
Opened10 December 2017 (2017-12-10)
Technical
Line length24.387 km (15.15 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8 12 in)

History

The eastern section was opened on 10 December 2017 with 18 stations from Zhiquan Road to Licun Park.[1]

The western section from Zhiquan Road station to Taishan Road station opened on December 16, 2019. Haixin Bridge station on the section is not opened.[2]

Opening timeline

SegmentCommencementLengthStation(s)Name
Zhiquan Road — Licun Park 10 December 2017 20.422 km (12.69 mi) 18 Phase 1 (Eastern section)
Taishan Road — Zhiquan Road 16 December 2019 4.2 km (2.61 mi)[3] 3[lower-alpha 1] Phase 1 (Western section)

Stations

Station name Connections Distance
km
Location
English Chinese
Ferry Terminal 轮渡
Xiaogang 小港
International Cruise Port 国际游轮港
Taishan Road 泰山路 0.000 0.000 Shibei
Lijin Road 利津路 1.220 1.220
Taidong 台东 0.769 1.989
Haixin Bridge[lower-alpha 1] 海信桥 1.104 3.093
Zhiquan Road 芝泉路 0.872 3.965 Shinan
May 4th Square 五四广场  3  1.555 5.520
Fushansuo 浮山所 0.928 6.448
Yan'erdao Road 燕儿岛路 1.038 7.486
Gaoxiong Road 高雄路 0.802 8.288
Maidao 麦岛 1.160 9.448 Shinan / Laoshan
Haiyou Road 海游路 1.156 10.604 Laoshan
Haichuan Road 海川路 1.005 11.609
Hai'an Road 海安路 1.225 12.834
Shilaoren Beach 石老人浴场 1.547 14.381
Miaoling Road 苗岭路  11  1.043 15.424
Tong'an Road 同安路 1.496 16.920
Liaoyang East Road 辽阳东路 0.815 17.735
Donghan 东韩 1.483 19.218
Hualoushan Road 华楼山路 2.255 21.473 Licang
Zaoshan Road 枣山路 0.906 22.379
Licun 李村  3  1.071 23.450
Licun Park 李村公园 0.937 24.387
  1. Haixin Bridge station is not opened.

Future Development

A 3.84 km (2.39 mi) extension from Taishan Road to Lundu (Ferry Terminal) started construction on October 26, 2019.[4]

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.