Line 4 (Fuzhou Metro)
Line 4 of the Fuzhou Metro (Chinese: 福州地铁4号线; pinyin: Fúzhōu Dìtiě Sì Hào Xiàn) runs from Cangshan District to Cangshan District. It starts at Huaxi North Road and ends at Luozhou. The total length is 26.9 km. Line 4's color is orange. This line was scheduled to begin the construction in 2017 and end in 2021.
Line 4 | |
---|---|
Overview | |
Status | Under Construction |
Owner | City of Fuzhou |
Locale | Fuzhou, China |
Termini | Juyuan Difengjiang |
Stations | 23 (Phase 1) |
Service | |
Type | Rapid transit |
System | Fuzhou Metro |
Services | 1 |
Operator(s) | Fuzhou Metro Co., Ltd. |
History | |
Opened | 2022 (scheduled) |
Technical | |
Line length | 26.9 km (16.71 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Third rail, 1,500 V DC |
Stations
Phase 1 Station:[1]
- Difengjiang (Transfer Line 5 and Line F1)
- Luozhou Town
- Chengmen (Transfer Line 1)
- Linpu (Transfer Line 6)
- Exhibition Center
- Jiangbiancun
- Aofeng Road
- Yuanyang Road
- Qianyu (Transfer Line 2)
- Fuxin East Road
- Huagong Road
- Chibian
- Yuefeng Town North
- Tatou (Transfer Line F1)
- Fujian Provincial Hospital
- Dongjiekou (Transfer Line 1)
- Baima North Road
- West Erhuan Road
- Gongye Road
- Jinniushan
- Hongtang Road (Transfer Line 5)
- Yuanting Road
- Juyuan
References
- "福建招标与采购网-福州市轨道交通4号线一期工程(勘察、设计)". www.fjbid.gov.cn (in Chinese). Fujian Provincial Development and Reform Commission. Archived from the original on 11 February 2017. Retrieved 8 February 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.