Line 5 (Fuzhou Metro)
Line 5 of the Fuzhou Metro (Chinese: 福州地铁5号线; pinyin: Fúzhōu Dìtiě Wǔ Hào Xiàn) or Yanjiang Line (Chinese: 沿江线; pinyin: Yán Jiāng Xiàn) runs from Cangshan District to Minhou. It starts at Fuzhou South Railway Station and ends at Jingxi New Town. The total length is 27.71 km (17.22 mi). Line 5's color is light blue. This line is scheduled to begin the construction in 2018 and end in 2023.
Line 5, Fuzhou Metro | |
---|---|
Overview | |
Status | Under Construction |
Owner | City of Fuzhou |
Locale | Fuzhou, China |
Termini | Fuzhou South Railway Station Jingxi New Town |
Stations | 20 |
Service | |
Type | Rapid transit |
System | Fuzhou Metro |
Services | 1 |
Operator(s) | Fuzhou Metro Co., Ltd. |
History | |
Opened | 2023 |
Technical | |
Line length | 27.71 km (17.22 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Third rail, 1,500 V DC |
Stations
- Fuzhou South Railway Station (Transfer Line 1)
- Chengjin Road
- Gaoshi Road
- Luozhou Town
- Difengjiang (Transfer Line 4 and Line F1)
- Happy Valley
- Dangpu Road
- Wushan
- Qi'an Road
- Fuwan Road
- Fengshan Road
- Jianxin South Road
- Pushang Avenue
- Jinhuan Road
- Jinshan (Transfer Line 2, There is a Jinshan Parking.)
- Jinhua Road
- Jinlin Road
- Hongtang Road (Transfer Line 4)
- Fujian Agriculture and Forestry University
- Jingxi New Town
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.