Line G is a planned addition to the Buenos Aires Underground which has been on the drawing board in numerous forms since the 1930s. After a failed attempt at financing and building the line in 2009, its most recent proposal was put forward in 2015 by the government of Buenos Aires.


Line G
Route map as planned in Law 670
Overview
StatusPlanned (postponed)
TerminiRetiro
Cid Campeador
Stations11
Service
TypeRapid transit
SystemBuenos Aires Underground
Technical
Line length7.3-kilometer (4.5 mi) (Law 670)
CharacterUnderground
Track gauge1,435 mm (4 ft 8 12 in)

History

The original plan proposed by CHADOPyF includes large parts of what today is known as Line G.

The history of Line G dates back to 1930 when the Hispano-Argentine Company for Public Works and Finances (CHADOPyF) was tasked with expanding the network following the construction of Line A by the Anglo-Argentine Tramways Company. The company had been tasked with building four new lines, with Line 3 running from Plaza de Mayo to the intersections of San Martín and Gaona Avenues, the current location of the Sid Campeador monument, which would be built in 1935.[1] By 1932, the original plans had been revised twice and the number of projected lines was reduced to three, with parts of lines 3 and 4 being merged into a new Line 3 (today known as Line D), and the western section of Line 3 being left on the drawing board, later to re-emerge as the planned Line G.[1]

Law 670

On 8 November 2001, the government of the City of Buenos Aires established a law outlining the future expansion of the Underground network, which included three new lines; F, G and I, as well measures for the advancement of Line H. Line G would start at Retiro Mitre railway station and then head west, terminating at the Cid Campeador monument, near Parque Centenario in the Caballito neighborhood.[2][3] The line, which was to stretch 7.3km and have 11 station, was then planned as follows:

Network map according to law 670
Proposed PETERS 3 network map
Retiro - Cid Campeador

Retiro
Cerrito
Uruguay
Callao
Pueyrredón
Jean Juares
Mario Bravo
Gascón
Estado de Israel
Parque Centenario
Cid Campeador

In December 2009, the City of Buenos Aires had made significant advances in negotiating financing and construction equipment from Exim Bank of China and China Railway Group Limited (CREC). The construction of the line was to be done with tunnel boring machines, allowing for the tunnel to advance an average of 15 metres per day and CREC would be in charge of all aspects of construction and sourcing of materials as well as rolling stock.[4] By early 2011, it was announced that the government had obtained financing for $1.4 billion for the line and was to begin construction in 2012, concluding in 2016.[5] The line was now to be 12.5km long and terminate further west at Villa del Parque, continuing on from the Sid Campeador terminus envisioned in Law 670.[6] Once the project had reached the Buenos Aires City Legislature, many aspects of the deal were questioned, including the cost of the line which was estimated to be significantly cheaper ($1 billion) if built directly by the city.[7] Following these setbacks, later that year construction was postponed indefinitely. [8]

PETERS Plan

In 2015 plans for the Underground published by the Buenos Aires, the line was re-designed completely, running through the financial district of the city in between Line F and Line C before running westwards towards Palermo, proximately parallel to and just north of Line D. Construction on the line was to begin sometime after construction begins on Line F.[9]

References

  1. "Idas y vueltas de la línea G [parte I]". enelSubte.com (in Spanish). 2 April 2011. Retrieved 15 July 2018.
  2. "Ley CABA Nº: 670 / 2001". www.ciudadyderechos.org.ar. Ciudad y Derechos. Retrieved 10 July 2018.
  3. "Nuevas Líneas: F, G e I". Buenos Aires Ciudad. Gobierno de la Ciudad de Buenos Aires - Desarrollo Urbano. 4 June 2011. Archived from the original on 4 June 2011. Retrieved 15 July 2018.
  4. "La línea G, cerca de un acuerdo". enelSubte.com (in Spanish). 29 September 2010. Retrieved 15 July 2018.
  5. "La ciudad logró un crédito para la línea G del subte". La Nacion (in Spanish). 21 March 2011. Retrieved 15 July 2018.
  6. "Grindetti viaja a China a buscar fondos para la línea G – Noticias Urbanas". www.noticiasurbanas.com.ar (in Spanish). 14 March 2011. Retrieved 15 July 2018.
  7. "Cuestionamientos al acuerdo con China por la línea G". enelSubte.com (in Spanish). Retrieved 15 July 2018.
  8. "Macri decidió no hacer la línea G del subte con los chinos". Diario La política online. 7 November 2011. Retrieved 5 July 2012.
  9. "Plan Estrategico Y Tecnico Para la Expansion de la Red de Subtes de Buenos Aires ("Peters plan")" (PDF). City of Buenos Aires. 2015.