Line I (Buenos Aires Underground)

Line I is a planned addition to the Buenos Aires Underground.

The future network as outlined in Law 670, including line I Serrano-Directorio with 10 stations
Parque Chacabuco - Ciudad Universitaria

Line I will run Parque Chacabuco ("Directorio") to Ciudad Universitaria with 18 new stations. The route length is 12.6 km. The future of this line (which had the lowest priority in the expansion plans) is currently uncertain since it has been proposed that a Metrobus line be built instead, which would follow the same trajectory as the line.[1]

The first phase would include a route from Parque Chacabuco to Plaza Italia ("Serrano"), having 6,6 km and 10 stations.[2]

Phase 1

This line is planned as follows:

Serrano - Directorio

Serrano
Costa Rica
Córdoba
Corrientes
Warnes
Díaz Vélez
Aranguen
Rivadavia
Pedro Goyena
Directorio

Phase 2

  • Palermo (interchange to Line D)
  • Chenaut
  • Jorge Newbery
  • Teodoro García
  • Virrey del Pino
  • Barrancas de Belgrano

References

  1. Bodart: El Metrobús como reemplazo de la línea I es "una estafa transversal" – EnElSubte, 16 April 2015.
  2. "Ley de Subtes". Ley de Subtes (in Spanish). 2001. Retrieved 2 January 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.