List of tallest buildings in Romania
This is an incomplete list of high rise buildings in Romania, itemizing 28 buildings in Romania that are 60 metres (200 ft) or taller.[1] This overlaps with topic of more complete List of tallest buildings in Bucharest, which lists 52 buildings 60 metres (200 ft) or taller in Bucharest alone. For other tall structures in Romania see list of tallest structures in Romania.
Completed buildings
Rank | Image | Building | City | Height (m/ft) | Floors | Built | |
---|---|---|---|---|---|---|---|
1 | Floreasca City Center Sky Tower | Bucharest | 137 m (449 ft) | 37 | 2012 | ||
- | National Cathedral | Bucharest | 135 m (443 ft) | N/A | 2024 | ||
2 | Globalworth Tower | Bucharest | 118 m (387 ft) | 23 | 2015 | ||
3 | Ana Tower | Bucharest | 110 m (360 ft) | 24 | 2019 | ||
4 | Basarab Tower | Bucharest | 112 m (367 ft) | 23 | 1988 | ||
5 | Bucharest Tower Center (BTC) | Bucharest | 106 m (348 ft) | 26 | 2008 | ||
6 | Casa Presei Libere | Bucharest | 104 m (341 ft) | 14 | 1957 | ||
7 | Administrative Palace | Satu Mare | 97 m (318 ft) | 18 | 1984 | ||
8 | Asmita T3 | Bucharest | 92.2 m (302 ft) | 24 | 2009 | ||
9 | Iulius Town – United Business Center 3 | Timișoara | 84 m (276 ft) | 15 | 2019 | ||
10 | Palace of the Parliament | Bucharest | 84 m (276 ft) | 12 | 1988 | ||
11 | Bucharest Financial Plaza | Bucharest | 83 m (272 ft) | 18 | 1997 | ||
12 | BRD Tower | Bucharest | 82 m (269 ft) | 19 | 2003 | ||
13 | Charles de Gaulle Plaza | Bucharest | 80 m (262 ft) | 16 | 2005 | ||
Euro Tower | Bucharest | 80 m (262 ft) | 19 | 2010 | |||
14 | InterContinental Bucharest | Bucharest | 77 m (253 ft) | 25 | 1970 | ||
15 | Monaco Towers | Bucharest | 76 m (249 ft) | 20 | 2009 | ||
Globalworth Plaza | Bucharest | 76 m (249 ft) | 20 | 2010 | |||
17 | Cathedral Plaza | Bucharest | 75 m (246 ft) | 19 | 2010 | ||
City Gate Towers | Bucharest | 75 m (246 ft) | 18 | 2009 | |||
19 | Unirii View | Bucharest | 73 m (240 ft) | 18 | 2018 | ||
20 | Millennium Business Center | Bucharest | 72 m (236 ft) | 19 | 2006 | ||
21 | Evocasa Uptown | Ploiești | 72 m (236 ft) | 18 | 2009 | ||
22 | Palas – United Business Center 3 | Iași | 71 m (233 ft)[2] | 17 | 2012 | ||
23 | Sheraton Bucharest Hotel | Bucharest | 70 m (230 ft) | 18 | 2001 | ||
Alia Apartments | Bucharest | 70 m (230 ft) | 22 | 2009 | |||
The Mark (Bucharest) | Bucharest | 70 m (230 ft) | 15 | 2019 | |||
25 | Business Development Center Bucharest | Bucharest | 68 m (223 ft) | 17 | 2004 | ||
26 | United Nations Plaza | Bucharest | 66 m (217 ft) | 18 | 1978 | ||
27 | Mihai Viteazu Residence | Sibiu | 65 m (213 ft) | 16 | 2016 | ||
University of Medicine and Pharmacy | Iași | 65 m (213 ft) | 16 | 2004 | |||
Fructus Plaza | Timișoara | 65 m (213 ft) | 16 | 2011 | |||
28 | PGV Tower | Bucharest | 65 m (213 ft) | 15 | 2006 | ||
Rin Grand Hotel | Bucharest | 65 m (213 ft) | 15 | 2008 | |||
29 | BOS Tower | Bucharest | 64 m (210 ft) | 16 | 2007 | ||
Premium Plaza | Bucharest | 64 m (210 ft) | 15 | 2007 | |||
30 | Vitan Platinum Towers | Bucharest | 61 m (200 ft) | 16 | 2011 | ||
31 | Iulius Town – United Business Center 2 | Timișoara | 60 m (197 ft) | 12 | 2016 | ||
Iulius Town – United Business Center 1 | Timișoara | 60 m (197 ft) | 12 | 2016 | |||
Griro Tower | Bucharest | 60 m (197 ft) | 15 | 1984 | |||
Bucharest Corporate Center | Bucharest | 60 m (197 ft) | 15 | 2007 |
Tallest under construction, approved and proposed
Under construction
Rank | Image | Name | Location | Height (metres) |
Floors (above ground) |
Construction start | Scheduled completion | Notes |
---|---|---|---|---|---|---|---|---|
1 | West City Tower | Cluj-Napoca | 95 | 25 | 2018 | 2020 | [3] | |
2 | ISHO Riverside A | Timișoara | 75 | 21 | 2018 | 2020 | [4][5] | |
3 | Iulius Town – United Business Center 0 | Timișoara | 75 | 15 | 2018 | 2021 | [6] | |
4 | Maurer Panoramic | Cluj-Napoca | 74 | 23 | 2019 | 2021 | [7] | |
5 | ISHO Parkside D | Timișoara | 70 | 20 | 2018 | 2020 | [8][9] | |
6 | NeoPeninsula | Bucharest | 61 | 16 | 2006 | N/A | [10] | |
7 | Metropolis | Craiova | 52 | 14 | ||||
8 | Dream Village | Iași | 50 | 13 | ||||
9 | Green Gate | Bucharest | 46 | 12 | 2012[11] | 2014 |
Cancelled and on-hold
Rank | Building | City | Height (m/ft) | Floors | Scheduled completion | Status |
---|---|---|---|---|---|---|
1 | Esplanada City Center | Bucharest | 250 m (820 ft) | 70 | 2015 | Cancelled |
2 | Mamaia North Complex | Constanța | 220 m (722 ft) | 42 | – | On-hold |
3 | Dorobanți Tower | Bucharest | 200 m (656 ft) | 50 | 2013 | Cancelled |
4 | Marina Park Constanța | Constanța | 200 m (656 ft) | 39 | 2015 | Cancelled |
5 | Tender Financial Center | Timișoara | 180 m (591 ft) | 45 | – | Cancelled |
6 | Dâmbovița Center Towers | Bucharest | 155 m (509 ft) | 35 | 2015 | On-hold |
7 | Mamaia Beach Residential | Constanța | 150 m (492 ft) | 34 | 2015 | Approved |
8 | Timișoara High Tower | Timișoara | 138 m (453 ft) | 33 | – | Proposed |
9 | Constanța Tower | Constanța | 135 m (443 ft) | 35 | 2015 | Cancelled |
10 | Star Lido Hotel | Bucharest | 135 m (443 ft) | 35 | – | Cancelled |
11 | Kiseleff Business Plaza | Bucharest | 132 m (433 ft) | 31 | – | Proposed |
12 | Carol Tower | Bucharest | 130 m (427 ft) | 35 | – | On-hold |
13 | Cefin Tower | Bucharest | 125 m (410 ft) | 36 | – | On-hold |
14 | Colosseum Tower Bucharest | Bucharest | 125 m (410 ft) | 32 | – | On-hold |
15 | Sky Towers Cluj-Napoca | Cluj-Napoca | 125 m (410 ft) | 32 | – | Cancelled |
16 | Ana Tower | Bucharest | 120 m (394 ft) | 28 | – | On-hold |
17 | Chitila Tower | Bucharest | 120 m (394 ft) | 30 | – | Cancelled |
18 | Kron Tower | Brașov | 120 m (394 ft) | 30 | – | Cancelled |
19 | Olympic Tower Bucharest | Bucharest | 120 m (394 ft) | 33 | – | Proposed |
20 | Sigma Towers | Cluj-Napoca | 120 m (394 ft) | 35 | – | On-hold |
21 | SkyTurn Brașov | Brașov | 120 m (394 ft) | 30 | – | Cancelled |
22 | Petrom City Tower | Bucharest | 117 m (384 ft) | 27 | 2014 | On-hold |
23 | Tron Tower | Bucharest | 105 m (344 ft) | 25 | – | Cancelled |
24 | Golden Gate Tower | Iași | 100 m (328 ft) | 28 | – | Cancelled |
References
- Emporis data
- "Modificare PUZ-CP aprobat prin HCL nr. 375/01.09.2009" (in Romanian). 12 December 2019.
- https://cluj.com/articole/west-city-tower/
- "Riverside A". ISHO.
- "Riverside A". Economica.
- https://m.adevarul.ro/locale/timisoara/cea-mai-mare-cladire-birouri-romania-intrat-apa-vaavea-12-etaje-mai-putin-schimbare-neasteptata-strategie-iulius-town-1_5f96e9465163ec42713d5835/index.html
- https://www.maurerpanoramic.ro/en/home/
- "Parkside D". ISHO.
- "Riverside A". Economica.
- "NeoPeninsula, un proiect rezidențial în valoare de 300 milioane euro". Wall-Street.ro. 27 July 2006.
- Cristi Moga (17 March 2014). "Green Gate, cel mai mare proiect de birouri din București livrat în 2014". Ziarul Financiar.
External links
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.