Luton DART

The Luton DART is an under-construction automated guided people mover (light metro) which will connect Luton Airport Parkway station and Luton Airport in England. DART is an acronym for Direct Air-Rail Transit. It is scheduled to open in 2021 and will replace the existing Shuttle Bus, relieving its roads in peak times and providing a higher capacity.[1]

Luton DART
Map of the planned transit
Overview
OwnerLuton Borough Council
Transit typeAutomated guided people mover (light metro)
Number of stations2 or 3
Websitedart.llal.org.uk
Operation
Operation will start2021
Technical
System length1.4 miles (2.3 km)
No. of tracks2

History

In April 2016 Luton Airport's owner announced a proposal to connect the airport with Luton Airport Parkway station and the adjacent part of the town which is being upgraded via an automated guided people mover.[2]

The project involves construction of bridges over the A1081 road and tunnels, along with two/three stations. The plans see the first station built at Bartlett Square in Napier Park on the east side of Luton Airport Parkway station, and the final station at the airport. There is an option for a third station midway, beside the airport's Mid-Stay Car Park. The link was approved by Luton Borough Council in June 2017.[3][4] In April 2018 a VolkerFitzpatrick / Kier Group joint venture commenced construction work.[1][5] If Terminal 2 of the airport goes ahead, which requires central government approval, an additional DART station would be built there.[6]

In 2018, it was announced that the system would be a Cable Liner, manufactured by the Austrian transit manufacturer, Doppelmayr Cable Car (DCC), who also have a contract to operate the system for the first five years.[7] The vehicles will be built by the Austrian cabin manufacturer, Carvatech.[8]

In December 2019, a ready-constructed, 80-metre (260 ft)-long, 1,000-tonne curved bridge was moved into place over the A1081 road on large jacks.[9] Construction work on the line was halted briefly in April 2020 during the COVID-19 pandemic over concerns related to Coronavirus Health Protection Regulations, but has since resumed after a safety assessment.[10]

The system is scheduled to open in 2021.[11]

References

  1. "Work begins on new £225 million rail link at Luton Airport". ITV News Anglia. 17 April 2018. Retrieved 11 September 2019.
  2. Luton airport peoplemover plan announced Railway Gazette International 15 April 2016
  3. "New railway connection to London Luton Airport approved". BBC News. 22 June 2017. Retrieved 11 September 2019.
  4. "London Luton Airport peoplemover approved". Metro Report International. Sutton: DVV Media Group. 6 July 2017.
  5. VolkerFitzpatrick-Kier jv wins £119m Luton airport rail link Construction Enquirer January 2018
  6. "Future LuToN Statutory Consultation 2019" (PDF). London Luton Airport Ltd. October 2019. pp. 4, 26.
  7. "Doppelmayr Cable Car to build Cable Liner in London" (Press release). 18 April 2018. Archived from the original on 22 December 2018. Retrieved 22 December 2018.
  8. "Luton Dart". Carvatech. Retrieved 8 September 2020.
  9. Sketchley, Elisha (3 December 2019). "1,000 tonne Luton DART bridge opens". Planning, BIM & Construction Today. Retrieved 20 May 2020.
  10. "Work restarts on the Luton DART after review of how government's COVID-19 guidance was being implemented". www.lutontoday.co.uk. Retrieved 20 May 2020.
  11. Fast and easy transfer from train to plane London Luton Airport Limited
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.