Seoraphuli Junction railway station
Sheoraphuli Junction is a Kolkata Suburban Railway station on the Howrah–Bardhaman main line and is located in Hooghly district in the Indian state of West Bengal. It serves Sheoraphuli area & northern part of the Serampore City. The Sheoraphuli–Tarakeswar branch line meets Howrah–Bardhaman main line at Sheoraphuli.
![]() Seoraphuli Junction | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Kolkata Suburban Railway junction station | ||||||||||||
![]() Sheoraphuli railway station from the southern foot bridge | ||||||||||||
Location | Grand Trunk Road, Sheoraphuli, Hooghly district – 712223, West Bengal India | |||||||||||
Coordinates | 22°46′29″N 88°19′42″E | |||||||||||
Elevation | 13 metres (43 ft) | |||||||||||
Owned by | Indian Railways | |||||||||||
Operated by | Eastern Railway | |||||||||||
Line(s) | Howrah–Bardhaman main line Sheoraphuli–Bishnupur branch line | |||||||||||
Platforms | 6 | |||||||||||
Tracks | 9 | |||||||||||
Construction | ||||||||||||
Structure type | Standard (on ground station) | |||||||||||
Parking | No | |||||||||||
Bicycle facilities | Yes | |||||||||||
Other information | ||||||||||||
Status | Functioning | |||||||||||
Station code | SHE | |||||||||||
Zone(s) | Eastern Railway | |||||||||||
Division(s) | Howrah | |||||||||||
History | ||||||||||||
Opened | 1854 | |||||||||||
Electrified | 1958 | |||||||||||
Previous names | East Indian Railway Company | |||||||||||
Passengers | ||||||||||||
Busy | ||||||||||||
Services | ||||||||||||
| ||||||||||||
Location | ||||||||||||
![]() ![]() Seoraphuli Junction Location in West Bengal ![]() ![]() Seoraphuli Junction Location in India |
History
The first passenger train in eastern India ran from Howrah to Hooghly on 15 August 1854. The track was extended to Raniganj by 1855.[5]
The broad-gauge Sheoraphuli–Tarakeswar branch line was opened by the Tarkessur Railway Company on 1 January 1885 and was worked by East Indian Railway Company.[6][7] Testing of electric locomotives with some coaches on section Belur to Konnagar commenced on 10-11-1957. On four suburban trains, hauled by electric locomotives, introduced on tiie section Howrah to Sheoraphuli from 1-12-1957, a saving of 11 minutes per run compared to steam services is achieved at present.[8]
Electrification
Electrification of Howrah–Burdwan main line was completed with 3 kV DC overhead system in 1958.[9] Howrah–Sheoraphuli–Tarakeswar line was electrified in 1957–58. It was converted to 25 kV AC in the 1970s[10]
References
- "Howrah-Goghat Local 37371". India Rail Info.
- "Adra Divisional Railway Map". South Eastern Railway.
- "Kharagpur Divisional Railway Map". South Eastern Railway.
- "SER Pink Book 2018-19" (PDF). Indian Railways.
- "IR History Part I 1832-1869". IRFCA. Retrieved 13 April 2013.
- "Administration Report on the Railways in India" 1884–85
- "The Chronology of Railway development in Eastern Indian". Rail India. Archived from the original on 16 March 2008. Retrieved 13 April 2013.
- https://eparlib.nic.in/bitstream/123456789/1726/1/lsd_02_03_16-12-1957.pdf page 37
- "IR History Part IV 1947–1970". IRFCA. Retrieved 13 April 2013.
- "History of Electrification". IRFCA. Retrieved 13 April 2013.