Sloane stop
Sloane is a surface light rail transit (LRT) stop under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It is located in the Victoria Village neighbourhood at the intersection of Eglinton Avenue and Bermondsey Road/Sloane Avenue.[2] It is scheduled to open in 2022.[1]
The black & orange bollards mark the alignment of the future LRT tracks and platforms | |||||||||||
Location | Eglinton Avenue East at Bermondsey Rd/Sloane Ave Toronto, Ontario Canada | ||||||||||
Coordinates | 43°43′33″N 79°18′45″W | ||||||||||
Platforms | Centre platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | TTC buses | ||||||||||
Construction | |||||||||||
Structure type | At grade | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
History | |||||||||||
Opening | 2022[1] | ||||||||||
Services | |||||||||||
|
The stop is located in the middle of Eglinton Avenue East on the east side of its intersection with Bermondsey Road and Sloane Avenue. The stop will have a centre platform. Access to the platforms will be via the pedestrian crossing on the east side of the signalized street intersection.[2] East of the stop, between the two mainline tracks, there is a double-ended siding for trains to enter and exit from either direction on either main track.[3]:1:28–1:35
During the planning stages for Line 5 Eglinton, the stop was given the working name "Bermondsey" after Bermondsey Road on the south side of Eglinton Avenue. On January 14, 2016, the Metrolinx board of directors approved changing the stop name to "Sloane" after Sloane Avenue on the north side.[4]
Surface connections
The following routes would serve this station according to the report presented at the board meeting on February 25, 2016:[5]
Route | Name | Additional Information |
---|---|---|
91 | Woodbine | Northbound to York Mills Road and southbound to Woodbine station |
References
- Spurr, Ben (February 17, 2020). "Eglinton Crosstown faces another setback, delayed until 2022 | The Star". Toronto Star. Retrieved February 18, 2020.
- "Bermondsey Stop". Eglinton Crosstown. January 14, 2016. Retrieved November 4, 2017.
- "Eglinton Crosstown Surface Flyover - December 2020". Metrolinx. January 6, 2021.
- Mackenzie, Robert (January 14, 2016). "???". Transit Toronto. Retrieved November 4, 2017.
- "Changes to TTC Bus Routes in Eglinton Corridor for Line 5 Rapid Transit Line" (PDF). Toronto Transit Commission. February 25, 2016.
External links