Xinyi Special District
Xinyi Special District (Chinese: 信義計畫區), also known as Xinyi Planned Area, is located in Xinyi District, Taipei, Taiwan. The total area of Xinyi Special District is 153 hectares. It was designed in the 1970s and developed from the 1980s onward. Xinyi Special District is the prime central business district of Taipei. Important infrastructure, such as Taipei 101, Taipei City Hall, Taipei International Convention Center and Taipei World Trade Center, is located within this area.
Its historical development began in 1976, when the Taipei Municipal Government accepted the proposal to redevelop the area east of the Sun Yat-Sen Memorial Hall. The goal of this redevelopment was to set up a secondary commercial center away from the more crowded old city center (Taipei Station, Ximending area). The redevelopment hoped to increase the prosperity of the eastern district and the convenience of urban life for existing residents.
The development framework was planned by the Japanese architect Guo Maolin, an architect with planning experience with the Nishi-Shinjuku, a previously planned development in Tokyo. The center's purpose was to expand business investment in the area and attract international financial services and technology firms. It also planned for residential development by building a completely new community. The Xinyi Project Area is the only commercial development area in Taipei with a wholly planned street and urban design. In addition to attracting corporations, it also features large retail spaces, department stores, and shopping malls.
There are currently 15 department stores in Xinyi Special District, forming the Xinyi Commercial District. Department stores in the commercial district include Shin Kong Mitsukoshi Xinyi New Life Square (A4, A8, A9, and A11), Taipei 101 Mall, Vieshow Cinemas, ATT 4 FUN, Uni-President Hankyu Department Store, BELLAVITA, Eslite Bookstore, Breeze Xin Yi, Breeze Song Gao, Breeze Nan Shan, Neo19, and Far Eastern Xinyi A13. Taipei Sky Tower Mall is currently under construction and is scheduled to be completed in 2021.[1] With at least 5 department stores in a mere 50-hectare site, Xinyi Commercial District is said to be the world's densest commercial district.[2][3]
Main Buildings
Block | Name | Floor | Height (m) | Floor Area (m2) | Status | Completed | Usage | Note |
---|---|---|---|---|---|---|---|---|
Station | Taipei City Hall Bus Station | 31 | 151 | 144,037.15 | Completed | 2010 |
|
[4] |
Government | Taipei City Hall | 12 | 54.42 | 196,684.59 | Completed | 1994 |
|
[5] |
Government | Taipei City Council | 10 | 35 | 46,592.4 | Completed | 1990 |
|
[6] |
A1 | Farglory Financial Center | 32 | 208 | 61,147.58 | Completed | 2012 |
|
[7] |
A2 | Uni-President International Tower | 30 | 154 | 116,773.91 | Completed | 2004 |
|
[8] |
A3 | Cathay Landmark | 46 | 212 | 152,488.6 | Completed | 2015 |
|
[9] |
A4 | Shin Kong Mitsukoshi | 9 | 49 | 87,700 | Completed | 2005 |
|
[10] |
A5 | BELLAVITA | 9 | 49.98 | 52,636.11 | Completed | 2009 |
|
[11] |
A6 | Walsin Lihwa Building | 27 | 134.6 | 77,824.15 | Completed | 2009 |
|
[12] |
A7 | Taipei Sky Tower | 46 | 280 | 87,464.32 | Under Construction | 2021 |
|
[13][note 1] |
A8 | Shin Kong Mitsukoshi | 9 | 39.55 | 67,901.18 | Completed | 2001 |
|
[14] |
A9 | Shin Kong Mitsukoshi | 9 | 47.1 | 51,854.9 | Completed | 2003 |
|
[15] |
A10 | Humble House Taipei | 22 | 89.95 | 54,956.28 | Completed | 2013 |
|
[16] |
A11 | Shin Kong Mitsukoshi | 7 | 40.7 | 62,705.81 | Completed | 1997 |
|
[17] |
A12 | Shin Kong Xinyi Financial Center | 22 | 89.95 | 79,689.79 | Completed | 2010 |
|
[18] |
A13 | Far Eastern Xinyi A13 | 14 | 78.95 | 78,159.78 | Completed | 2019 |
|
[19] |
A14 | ATT 4 FUN | 10 | 42 | 33,065.65 | Completed | 2000 |
|
[20] |
A15, 18, 20 | Taipei Nan Shan Plaza | 48 | 274 | 192,154.99 | Completed | 2018 |
|
[21][note 2] |
A16 | Vieshow Cinemas | 3 | 21.15 | 10,944.2 | Completed | 1997 |
|
[22] |
A17 | Vieshow Cinemas | 4 | 27.9 | 20,674.15 | Completed | 1997 |
|
[23] |
A19 | Neo19 | 12 | 43.9 | 24,380.69 | Completed | 2001 |
|
[24] |
A21 | Taipei World Trade Center (Exhibition Hall 3) (Set for Urban Renewal) | 3 | - | - | Completed | 2003 |
|
- |
A22, A23 | Taipei 101 | 101 | 509.2 | 374,219.95 | Completed | 2004 |
|
[25] |
A24 | Taipei World Trade Center (Exhibition Building/Hall 1) | 8 | 41 | 157,642.34 | Completed | 1986 |
|
[26] |
A24 | TWTC International Trade Building | 34 | 142.92 | 111,791.52 | Completed | 1988 |
|
[27] |
A24 | Taipei International Convention Center | 10 | 48.95 | 59,997.45 | Completed | 1989 |
|
[28] |
A24 | Grand Hyatt Taipei | 26 | 85.2 | 118,505.52 | Completed | 1990 |
|
[29] |
A25 | Fubon Xinyi A25 | 52 | 265.5 | 132,362.85 | Under Construction | 2020 |
|
[30][31] |
A26 | Xinyi District Office (Set for Urban Renewal) | 46 | 234 | - | Completed | 1990 |
|
[32] |
B1 | CPC Building | 23 | 90 | 102,920.4 | Completed | 2001 |
|
[33] |
B2 | Cathay Financial Center | 24 | 106.15 | 89,902.76 | Completed | 2002 |
|
[34] |
B3 | Hontai Trade Plaza | 18 | 81.75 | 52,801.35 | Completed | 1999 |
|
[35] |
B4 | Capital Financial Center | 18 | 73.5 | 52,938.29 | Completed | 1998 |
|
[36] |
B5 | Kelti International | 15 | 89.5 | 28,823.85 | Completed | 2009 |
|
[37] |
B6 | Hua Nan Bank Headquarters | 27 | 154.5 | 52,131.74 | Completed | 2014 |
|
[38] |
B7 | 55 Timeless | 31 | 127.23 | 25,931.47 | Completed | 2018 |
|
[39] |
D1 | Rosewood Taipei | 37 | 144.9 | 40,329.37 | Under Construction | 2024 |
|
[40] |
D3 | D3 Building | 40 | 150.2 | 35,220.29 | Suspended | - |
|
[41] |
D4 | Sinyi Realty Building | 10 | 48.2 | 22,771.09 | Completed | 1995 |
|
[42] |
D5 | Cathay Xinyi Building | 12 | 49.95 | 47,088.36 | Completed | 2003 |
|
[43] |
E1 | Aurora Plaza Taipei | 18 | 72.75 | 33,747.71 | Completed | 1991 |
|
[44] |
E2 | Shin Kong Manhattan | 16 | 66.25 | 23,208.43 | Completed | 2000 |
|
[45] |
E4 | NanShan Financial Center | 17 | 69.95 | 27,559.93 | Completed | 2006 |
|
[46] |
H | Tao Zhu Yin Yuan / Agora Garden | 21 | 93.2 | 42,705.61 | Completed | 2018 |
|
[47] |
See also
Notes
- 原本為CTBC Financial Holding及CTBC Bank總行大樓和 新舞台,2014年5月中信金總部遷至南港區中國信託金融園區後,於2015年10月以151億新台幣售出95%土地所有權持分,由買方負責拆除,且需重建新舞台。
- 原本為世貿二館,2012年由 南山人壽 標得50年地上權,而在2013年拆除。
References
- 劉俞青、研究員.朱晉輝. "百貨燙金戰記". 今周刊. Retrieved 16 November 2019.
- TVBS. "台北「信義商圈」 全球密度最高百貨區│TVBS新聞網". TVBS (in Chinese). Retrieved 2020-09-26.
- "Four major department stores in Taiwan launch special offers for UnionPay QuickPass". www.unionpayintl.com. Retrieved 2020-09-26.
- 99使字第0010號
- 83使字第0112號
- 79使字第0470號
- 101使字第0345號
- 93使字第0373號
- 104使字第0094號
- 101使字第0238號
- 98使字第0081號
- 98使字第0108號
- 臺北市政府環境保護局 (2017-10-20). "信義A7綜合大樓新建工程環境影響說明書(初稿)". 臺北市政府環境保護局.
- 90使字第0397號
- 92使字第0377號
- 102使字第0155號
- 86使字第0392號
- 99使字第0255號
- 105建字第0129號
- 89使字第097號
- 103建字第6688號、103建字第6699號
- 86使字第447號
- 86使字第468號
- 90使字第287號
- 92使字第0168號、93使字第0353號
- 74使字第1265號
- 77使字第0158號、"國貿大樓概要". 台北世界貿易中心 國際貿易大樓. Retrieved 2018-01-07.
- 78使字第0714號
- 79使字第0052號
- 106建字第0237號
- "(1050121W) 臺北市信義區信義段三小段6地號開發計畫環境影響說明書-第五章". 行政院環境保護署. Retrieved 2018-02-20.
- "Nan Shan wins superficies rights to plot in Xinyi - Taipei Times". www.taipeitimes.com. 2019-11-21. Retrieved 2020-09-26.
- 90使字第090號
- 91使字第0265號
- 88使字第0022號
- 87使字第0484號
- 98使字第0288號
- 103使字第0318號
- "(1030141W) 台北市信義區信義段3小段52-2、52-3等2筆地號集合住宅大樓新建工程環境影響說明書-第五章". 行政院環境保護署. Retrieved 2018-02-20.
- "(1050161W) 富邦建設臺北市信義區信義段五小段39等10筆土地集合住宅新建工程環境影響說明書-第五章". 行政院環境保護署. Retrieved 2018-02-20.
- "(1010111W) 臺北市信義區信義段五小段29、29-1、29-7、29-8、29-9等5筆地號集合住宅新建工程環境影響說明書-第五章". 行政院環境保護署. Retrieved 2018-02-20.
- 84使字第0388號
- 92使字第0197號
- 80使字第0443號
- 89使字第0324號
- 95使字第0122號
- 107使字第6668號