Yogyakarta International Airport

Yogyakarta International Airport (Indonesian: Bandar Udara Internasional Yogyakarta, Javanese: ꦥꦥꦤ꧀​ꦄꦁꦒꦼꦒꦤ​ꦆꦤ꧀ꦠꦼꦂꦤꦱꦶꦪꦺꦴꦤꦭ꧀​ꦔꦪꦺꦴꦒꦾꦏꦂꦠ, romanized: Papan Anggêgana Internasiyonal Ngayogyakarta) (IATA: YIA, ICAO: WAHI) is an international airport located at Temon district of Kulon Progo Regency, in Java, Indonesia. The airport is situated around 45 kilometers from the city of Yogyakarta, which serves the Yogyakarta Special Region, as well as nearby Central Javan cities such as Purworejo, Kebumen, Cilacap and Magelang.[1] It is the largest and one of the three only airports in the Yogyakarta Special Region, the other being Adisutjipto International Airport which is located closer to the Yogyakarta city center and Gading Airfield in Wonosari, Gunung Kidul Regency. The airport serves flights to and from several cities and towns in Indonesia and some international destinations such as Malaysia and Singapore.

Yogyakarta International Airport

Bandar Udara Internasional Yogyakarta
ꦥꦥꦤ꧀​ꦄꦁꦒꦼꦒꦤ​ꦆꦤ꧀ꦠꦼꦂꦤꦱꦶꦪꦺꦴꦤꦭ꧀​ꦔꦪꦺꦴꦒꦾꦏꦂꦠ

Papan Anggêgana Internasiyonal Ngayogyakarta
Summary
Airport typePublic
OwnerGovernment of Indonesia
OperatorPT Angkasa Pura I
ServesYogyakarta Special Region
LocationKulon Progo Regency, Indonesia
Focus city for
Elevation AMSL7.3 m / 24 ft
Coordinates7°54′27″S 110°03′16″E
Websiteyogyakarta-airport.co.id
Map
Runways
Direction Length Surface
m ft
11/29 3,250 10,663 Asphalt

The airport is operated by Angkasa Pura I.[2] The airport replaced Adisutjipto International Airport of Yogyakarta. The airport commenced operations on the 6th of May 2019 with the first arrival, a Citilink flight from Jakarta's Halim Perdanakusuma International Airport.[3][4][5] The airport became fully operational on 29 March 2020 with all scheduled flights (except turboprops, cargo and other non-commercial flights) relocated from the old airport.[6]

Facilities and infrastructure

Current 2020 name sign in English and Javanese

The new airport is anticipated to accommodate twenty million passengers annually upon completion. The airport is equipped with an early detection system for earthquakes, tsunamis and extreme weather events. It can withstand an earthquake with a magnitude of up to 8.8 on the Richter scale and a 12-m-high tidal wave.

The airport will be developed in two phases. In the first phase of development, the airport will have a terminal area of 130,000 square meters with a capacity of up to 15 million passengers per year.[7] The total land area of the airport is about 645 hectares.[8] The airport runway has dimensions of 3,250 x 45 meters and can serve even wide-body aircraft such as the Boeing 777 and the Airbus A380. In the second phase of development, the new airport terminal will be developed to 195,000 square meters that can accommodate up to 20 million passengers per year. The length of the runway will be extended by 350 meters to 3,600 x 45 meters wide with an apron where up to 45 aircraft can be parked.[9]

Future plans also include to turn the airport land into an airport city integrated with industrial and tourism areas. The airport is designed to be resistant to earthquakes measuring up to 8.8 on the Richter magnitude scale as it was constructed in an earthquake-prone area, and will be equipped with tsunami mitigation facilities.[10] At present part of the terminal, about 129,00-square-meter is completed and used. When completed the terminal will spread over 210,000 sqm.[11] There will be three islands of check-in counters, with 32 counters in each of the islands. Parts of the airport feature local traditional artwork and local wisdoms, represented by the Jasmine flower and Wijayakusuma (Epiphyllum oxypetalum), designed by local artists.

Airlines and Destinations

Passenger

AirlinesDestinations
AirAsia Kuala Lumpur–International[12]
Air Niugini Charter:Port Moresby
Batik Air Jakarta–Halim Perdanakusuma,[13] Jakarta–Soekarno-Hatta, Palangkaraya, Samarinda
Citilink Balikpapan,[14] Banjarmasin,[14] Denpasar/Bali,[14] Jakarta–Halim Perdanakusuma,[14] Jakarta–Soekarno-Hatta,[14] Makassar,[14] Medan,[14] Palembang,[14] Pekanbaru
Garuda Indonesia Balikpapan,[14] Banjarmasin, Denpasar/Bali,[14] Jakarta–Soekarno-Hatta,[14] Makassar[14]
Indonesia AirAsia Denpasar/Bali,[12] Jakarta–Soekarno-Hatta,[12] Mataram–Lombok,[12] Medan,[12] Singapore[12]
Lion Air Balikpapan,[13] Banjarmasin,[13] Batam,[13] Denpasar/Bali,[13] Jakarta–Soekarno-Hatta,[13] Makassar,[13] Mataram–Lombok,[13] Medan,[13] Padang,[13] Palembang,[13] Pekanbaru,[13] Pontianak,[15] Samarinda,[13] Tarakan[13]
Scoot Singapore[16]
Sriwijaya Air Balikpapan,[17] Bandar Lampung,[17] Jakarta–Soekarno-Hatta,[17] Jambi, Makassar[17]

Controversy

40% of the land that will be used for the airport is classified as "Paku Alam (Duke)" land while the rest belongs to local communities. The location is in Temon District between Congot Beach and Glagah Beach (which covers Palihan village, Sindutan village, Jangkaran village and Glagah village).[18][19]

Affected residents learnt about the construction of YIA in 2011. Dissemination of YIA development was carried out by the Regional Government and related Offices, PT Angkasa Pura I, and the National Land Agency (BPN) of Kulon Progo Regency in 2014. The rejection by the affected people was covered by the mass media. The reason people rejected the planned YIA was the construction of the airport would eliminate the land that is the source of their livelihood as farmers. They also claimed about environmental issues with the proposed site as well as issues of safety, due to the area being at high risk for tsunamis and other natural disasters.[20] In addition there are a few historic as well as scared places for local community with the airport development area. The rejection of the YIA development has begun since the establishment of the Wahana Tri Tunggal (WTT). Later some of its members formed the Community Association for Refusing Kulonprogo Evictions (PWPP-KP). Initially, the attitude of refusing unconditionally became the principle of the WTT towards the construction of the YIA, until finally they accepted the construction provided that there was a reassessment of the assets of buildings, plants and other supporting facilities. Meanwhile, from the formation of the PWPP-KP until now, the attitude of refusing unconditionally still continues.[21] As of July 2018, there are 86 families who still refused to sell their land for the airport's development.[22]

On November 28, 2017, the Chairperson of the Ombudsman of the Republic of Indonesia requested a delay in emptying residents land because they were conducting an investigation regarding the possibility of maladministration in the process. The National Commission on Human Rights said that the handling of citizens in the YIA conflict area is relatively good compared to conflicts in many other areas with more complex levels of conflict.[23] At the same time, the commission considers there are human rights violations that occurred and need not be done in emptying the land occupied by residents.[24]

Ground transportation

At present DAMRI shuttle buses serve routes from YIA to Adisucipto International Airport, Wojo, Purworejo, Kebumen and Magelang. Another bus service Satelqu serves routes from YIA to Adisutjipto International Airport, Cilacap and Purwokerto.[25]

The airport is planned to be connected to Yogyakarta city center via a toll road and railway line. The railway line (airport railway) is planned to open in 2021.[26] At present Wojo Station is the nearest, which is about 10 kilometers from the airport. From there passengers have to use shuttle service to the airport. There are 3 other stations serving passengers to the airport, Yogyakarta Station in Yogyakarta, Wates Station in Kulon Progo and Wojo Station in Purworejo. All these stations have exclusive comfortable waiting room for the airport passengers and it is provided with international standard toilet.[27]

There is provisions for the operation of Damri shuttle buses, SetelQu, airport taxis, online taxis, and trains via Wojo station (about 10 minutes from the airport) to connect the airport with Borobudur.

See also

References

  1. 5 Fakta Baru Bandara Internasional Yogyakarta, Beroperasi Sebelum Lebaran hingga Sasar Penumpang dari Selatan Jateng
  2. "New airport to cater to more travelers in Yogyakarta". The Jakarta Post. Retrieved 2017-08-20.
  3. "Citilink marks the first flight at the new Yogyakarta airport". The Jakarta Post. Retrieved 21 August 2019.
  4. Dewi Rina Cahyani (May 6, 2019). "Citilink Jadi Maskapai Pertama Mendarat di Bandara Kulon Progo".
  5. Wahyu Setiawan Nugroho (August 13, 2019). "Hotel Bintang Tiga dan RS Internasional Belum Ada, Maskapai Asing Belum Mau Mendarat di Bandara YIA".
  6. "Yogyakarta International Airport officially opens for business". The Jakarta Post. Retrieved 30 March 2020.
  7. "Kulonprogo Airport Project to be Sped Up". Tempo. Retrieved 2017-08-20.
  8. "Construction of toll road in Yogyakarta being reviewed: Minister". Antaranews. Retrieved August 20, 2017.
  9. "New Yogyakarta International Airport Bakal Jadi Bandara Termegah di Indonesia ?". Tribunnews. Retrieved 25 March 2018.
  10. "Yogya's airport equipped with tsunami mitigation, quake resistance". The Jakarta Post. Retrieved 25 March 2018.
  11. "New Yogyakarta airport to start operations in April". The Jakarta Post. Retrieved 21 August 2019.
  12. "AirAsia to move its operations in Yogyakarta to Yogyakarta International Airport, Kulon Progo starting 29 March 2020". AirAsia. Retrieved 19 March 2020.
  13. "Default". agent.lionair.co.id. Retrieved 4 June 2020.
  14. "Starting on March 29th 2020, Garuda Indonesia Group Serves All Flights From and Toward Yogyakarta Through Yogyakarta International Airport". Garuda Indonesia. Retrieved 9 March 2020.
  15. "Lion Air buka rute Pontianak -- Yogyakarta". ANTARA. Retrieved 24 September 2019.
  16. "Scoot's Flight Schedules for August & September 2020". Scoot.
  17. "Mulai Tanggal 29 Maret 2020 Penerbangan Sriwijaya Air dari/ke Yogyakarta Pindah ke Yogyakarta International Airport (YIA)". Sriwijaya Air Official Instagram. Retrieved 3 March 2020.
  18. "Yogyakarta bakal Miliki Bandara Baru Seluas 637 Hektare". Retrieved 14 December 2018.
  19. "Bandara Kulon Progo Siap Tiang Pancang". Retrieved 14 December 2018.
  20. "Sosialisasi Bandara Kulonprogo Yogya Mulai Senin 8 September". Liputan 6. Retrieved 14 December 2018.
  21. "Manajemen konflik sosial pembangunan NYIA". jogja.antaranews.com. Retrieved 2018-12-14.
  22. "Last 86 families still fighting against Yogyakarta airport development to keep land". The Jakarta Post. Retrieved 14 December 2018.
  23. "Warga yang Tergusur dari Lahan Bandara NYIA Sulit Diprediksi". KOMPAS.com (in Indonesian). 2018-07-27. Retrieved 2018-12-14.
  24. "Komnas Ungkap Catatan Buruk Pelanggaran HAM di Proyek NYIA Kulonprogo". Harianjogja.com. 2018-08-14. Retrieved 2018-12-14.
  25. "Citilink makes first commercial landing at new Yogyakarta airport". The Jakarta Post. Retrieved 21 August 2019.
  26. "Angkasa Pura I to provide Rp 8T for new Yogyakarta airport". The Jakarta Post. Retrieved 20 August 2017.
  27. Ari Nugroho (April 23, 2019). "Operasi Penerbangan Internasional YIA, KAI Siapkan Ruang Tunggu Khusus Kereta Bandara".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.