Changqing Road station
Changqing Road (simplified Chinese: 长清路; traditional Chinese: 長清路; pinyin: Chángqīng Lù) is an interchange station on Lines 7 and 13 of the Shanghai Metro. It opened on 5 December 2009 as a Line 7 station. With the opening of phases two and three of Line 13 on 30 December 2018, it became a virtual interchange station between Lines 7 and 13.[1] Passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer here to continue their journey.
Line 7 platform | ||||||||||||||||
Location | Pudong New Area, Shanghai China | |||||||||||||||
Coordinates | 31.1772°N 121.483°E | |||||||||||||||
Operated by | Shanghai No. 3 Metro Operation Co., Ltd. (Line 7) SHanghai No. 2 Metro Operation Co., Ltd. (Line 13) | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Connections |
| |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
History | ||||||||||||||||
Opened | 5 December 2009 | |||||||||||||||
Services | ||||||||||||||||
|
The station is located near the junction of Changqing Road and Yaohua Road, just outside the Shanghai Expo 2010 zone.
Station Layout
G | Entrances and Exits | Exits 1-7 |
B1 | Line 7 Concourse | Faregates, Station Agent |
Line 13 Upper Concourse | Faregates, Station Agent | |
B2 | Line 13 Lower Concourse | Faregates, Station Agent |
Northbound | ← Line 7 towards Meilan Lake (Houtan) | |
Southbound | Line 7 towards Huamu Road (Yaohua Road) → | |
B3 | Westbound | ← Line 13 towards Jinyun Road (Shibo Avenue) |
Eastbound | Line 13 towards Zhangjiang Road (Chengshan Road) → |
References
- Shanghai Shentong Metro Group Co., Ltd. (2018-12-28). 5号线南延伸和13号线二、三期12月30日起试运营. Shanghai Shentong Metro Group Co., Ltd. (in Chinese). Retrieved 2018-12-29.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.