Cross Country Route

The Cross Country Route is a long-distance rail route in the United Kingdom that has in its central part superseded the Midland Railway. It runs from Bristol to York via, Birmingham, Derby, Sheffield and Leeds. It facilitates some of the longest passenger journeys in the UK such as Aberdeen to Penzance.

Cross Country Route
Overview
StatusOperational
OwnerNetwork Rail
TerminiYork
Bristol Temple Meads
Stations48
Service
TypeSuburban rail, Heavy rail, Inter-city rail
SystemNational Rail
Operator(s)CrossCountry (principal operator)
East Midlands Railway
Great Western Railway
Northern
TransPennine Express
West Midlands Trains
Rolling stockClass 43 HST
Class 170 Turbostar
Class 220 Voyager
Class 221 Super Voyager
Technical
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
ElectrificationPartial 25 kV AC OHLE
Operating speedUp to 125 mph (200 km/h) maximum, some sections limited to 100 mph (160 km/h)
Route map

(Click to expand)

The line is classed as a high-speed line because its sections from Birmingham to Wakefield and from Leeds to York have a speed limit of 125 mph (200 km/h), though the section from Birmingham to Bristol is limited to 100 mph (160 km/h) due to there being numerous level crossings, especially half-barrier level crossings, and the section from Wakefield to Leeds has the same limit owing to a number of curves.

History

The Birmingham to Bristol section was built as the Birmingham and Gloucester and Bristol and Gloucester Railways[n 1] before joining the Midland Railway, the southern forerunner to the cross-country route. From Birmingham to the north-northeast, the line had three separately owned sections, namely the:

From the Labour Government's nationalisation in 1948 until privatisation in 1990 it ran through six regions of British Rail but had (timetabling) priority in none of them and therefore the services were poorly promoted and thus not always well-patronised.

Most Derby-Nottingham local passenger trains were taken over by diesel units from 14 April 1958, taking about 34 minutes between the two cities.[1]

In the 1990s most services were operated by British Rail's InterCity business unit. As part of the privatisation of British Rail, these were taken over by Virgin CrossCountry in 1997 with the Class 47 hauled Mark 2 and High Speed Train sets replaced by Class 220 and Class 221 diesel multiple units in the early 2000s.[2][3]

The use of the route for freight has decreased, due to the bulk of haulage switching to roads and the building of the M5, M6 and M1 motorways.

Abortive British Rail proposals for complete electrification

In the 1960s the route was considered for electrification. In the early 1980s, electrification was again discussed at length and documentation for various proposals was produced in 1981.[4] This would have been particularly beneficial for climbing the Lickey Incline between Cheltenham and Birmingham, as many of the early diesels were under-powered. In 1977 the Parliamentary Select Committee on Nationalised Industries recommended considering electrification of more of Britain's rail network, and by 1979 BR presented a range of options that included electrifying the cross-country route by 2000.[5] Under the governments that succeeded the 1976–79 Labour government the proposal was not implemented.

Route

Map of Cross Country network. The core Cross Country Route is between Bristol and York

The route is well connected, and aside from its own alignment it uses parts of the South Wales Main Line, Midland Main Line, Swinton–Doncaster line, and the East Coast Main Line. Major cities and towns served along the route include:

Nominal start-point at Derby

Milepost zero for the main predecessor Derby to Bristol route has always been Derby, hence a train travelling the whole route starts out going "up" then becomes "down". The Birmingham to Derby section of the route has a line speed of 125 mph (200 km/h), while Birmingham to Bristol is restricted to 100 mph (160 km/h) due to a number of half-barrier level crossings.

Electrification

The line is not fully electrified, but some sections are overhead electrified at 25 kV AC such as Bromsgrove to Grand Junction, with further electrified sections around Leeds and the East Coast Main Line near York.[6] The section between Leeds and York is due to be fully electrified by 2022 with the electrification of the North TransPennine from Liverpool Lime Street to York via Manchester Piccadilly,[7] as is the section between Westerleigh Junction and Bristol Temple Meads as part of the 21st-century modernisation of the Great Western main line.

Network Rail stated in 2014 that the line between Derby and Sheffield would be electrified as part of the Midland Main Line upgrade.[8] However, the electrification programme was severely cut back in July 2017.[9]

Services

Most long distance services on the route are operated by Class 220/221 Voyagers, although a few services operate using High Speed Trains. These trains are capable of achieving 125 mph (200 km/h), compared to the previous Class 47s and Mk 2 coaching stock, which had a top speed of 95 mph (150 km/h).

See also

Notes and references

Notes
  1. Briefly amalgamated as the Birmingham and Bristol Railway
References
  1. Railway Magazine June 1958 p. 432
  2. Virgin says farewell to 47s with Penzance - Derby trip Rail issue 443 4 September 2002 page 16
  3. CrossCountry HSTs bow out The Railway Magazine issue 1230 October 2003 page 84
  4. "1981 Railway archive" (PDF). 1981.
  5. Railway Electrification. British Railways Board (Central Publicity Unit). Winter 1979. pp. 0–2, 8.
  6. "First electric train travels between Birmingham and Bromsgrove". Global Railway Review. Retrieved 7 June 2018.
  7. Philip Haigh (14 December 2011). Nigel Harris (ed.). "£290m to wire York-Manchester trans-Pennine route". Rail (685): 8–9.
  8. "Midland Mainline improvement programme – Network Rail". Network Rail. Archived from the original on 26 December 2016. Retrieved 4 May 2018.
  9. "Rail electrification plans scrapped". BBC News: Business. 20 July 2017. Archived from the original on 25 August 2017. Retrieved 31 October 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.