East Coast (train operating company)

East Coast, the trading name of the East Coast Main Line Company,[1] was a British train operating company running the InterCity East Coast franchise on the East Coast Main Line between London, Yorkshire, North East England, and Scotland. East Coast ran long-distance inter-city services from its Central London terminus at London King's Cross on two primary routes; the first to Leeds and the second to Edinburgh via Newcastle with other services reaching into Yorkshire and Northern and Central Scotland. It commenced operations on 14 November 2009 and ceased on 28 February 2015.[2]

East Coast
Class 91 locomotive at London King's Cross in August 2012
Overview
Franchise(s)InterCity East Coast
14 November 2009 – 28 February 2015
Main region(s)Greater London
East of England
East Midlands
Yorkshire and the Humber
North East England
Scotland
Fleet size31 Class 91 electric locomotives

30 InterCity 225 sets

14 InterCity 125 (HST) sets
Stations called at53
Stations operated12
Parent companyDirectly Operated Railways
Reporting markGR
PredecessorNational Express East Coast
SuccessorVirgin Trains East Coast
Other
Websitewww.eastcoast.co.uk
East Coast Route
Inverness
Carrbridge
Aviemore
Kingussie
Newtonmore
Blair Atholl
Pitlochry
Dunkeld & Birnam
Perth
Gleneagles
Dunblane
Stirling
Falkirk
Aberdeen
Stonehaven
Montrose
Arbroath
Dundee
Leuchars
Kirkcaldy
Inverkeithing
Glasgow Central
Motherwell
Haymarket
Edinburgh Waverley
Dunbar
Berwick-upon-Tweed
Alnmouth
Morpeth
Newcastle
Durham
Darlington
Northallerton
York
Skipton
Keighley
Bradford Forster Square
Shipley
Harrogate
Horsforth
Leeds
Wakefield Westgate
Hull
Brough
Selby
Doncaster
Retford
Lincoln
Newark North Gate
Grantham
Peterborough
Stevenage
London King's Cross

East Coast was a subsidiary of Directly Operated Railways, formed by the Department for Transport as an operator of last resort when National Express refused to provide further financial support to its National Express East Coast (NXEC) subsidiary and consequently lost its franchise.[3] The franchise was re-nationalised on 14 November 2009, with the day-to-day operations continuing normally on the whole. Within one year, East Coast's rolling stock begun to be re-liveried in a new silver scheme intentionally styled so that future operators of the franchise could easily apply their own branding following their takeover of operations. During May 2011, East Coast launched the "Eureka" programme, which involved numerous service changes, including an overhauled timetable and complimentary catering for First Class passengers. On the whole, service levels remained relatively steady and unchanged throughout East Coast's tenure.

From the onset of East Coast's operations, the Ministry of Transport had publicly stated its long term intention for the franchise was for it to be retendered and thus return to a private franchisee; the was originally set to occur by December 2013.[4] However, during March 2013, the Secretary of State for Transport announced that this transfer had been postponed to February 2015 instead.[5] In January 2014, FirstGroup, Keolis/Eurostar and Stagecoach/Virgin were announced as the shortlisted bidders for the new franchise.[6][7][8] The franchise passed to Virgin Trains East Coast on 1 March 2015.[9][10][11]

History

Background

The original InterCity East Coast franchise was awarded to the Bermuda-based transport and container leasing company Sea Containers, which operated it from April 1996 until April 2005 via its subsidiary Great North Eastern Railway (GNER).[12][13] While Sea Containers successfully bid for the award of a new seven-year franchise by the Department for Transport (DoT) commencing in May 2005;[14][15] the award was subject to criticism that, amid aggressive bidding between the different companies competing for the franchise, GNER had committed itself to fulfilling an overly generous arrangement that may not be financially realistic, and was accused as having overbid to secure the franchise.[12][16] During the original franchise, the company had been receiving subsidies from the British government to support its operations; however, the terms of the second franchise reversed this to have the operator making payments to the government, specifically a £1.3-billion premium which was due to the DoT over a ten year period.[17][18][12] Within two years, the company's financial difficulties had become a public concern.[19]

In October 2006, Sea Containers filed for bankruptcy protection under the US Chapter 11 process,[20] During December 2006, the DoT announced its intention to strip Sea Containers of its franchise, although GNER continued to operate it via an interim fixed fee management contract while another competitive tender was organised.[21] In February 2007, the DoT announced that Arriva, First, National Express and Virgin Rail Group had been shortlisted to lodge bids for the new franchise.[22] In August 2007, the DoT awarded the Intercity East Coast franchise to National Express, leading to the creation of National Express East Coast (NXEC) shortly thereafter.[23][24]

Under the terms of its franchise agreement, National Express committed to paying a £1.4-billion premium to the DoT over a time span of seven years and four months. However, numerous rail analysts at the time promptly voiced concerns that the company had paid too much for the franchise, and had effectively repeated GNER's mistake in order to secure the franchise.[25] According to railway industry periodical Rail, NXEC quickly garnered a reputation for cost-cutting and a decline in service levels, particularly in terms of the onboard catering.[12] By 2009, NXEC was under increasing financial pressure due to various factors, including compounding rises in fuel prices and the poor economic climate of the time, commonly known as the Great Recession.[26] During April 2009, National Express confirmed that it was pursuing talks with the government over possible financial assistance with the franchise, either through a reduction in the premium due or some other form of assistance.[27][12]

Formation

In July 2009, it was announced that National Express was intending to default on the franchise, having failed to renegotiate the contractual terms of operation; National Express stating that it would not be providing any further financial support necessary to ensure NXEC remained solvent. This meant NXEC would run out of cash by the end of 2009.[28] As a consequence of this decision, the DoT announced it would establish a publicly owned company to take over the franchise from National Express.[29] The failure of the NXEC franchise sparked widespread calls amongst industry officials and members of the public for the InterCity East Coast franchise to be permanently placed into public ownership, or even the complete scrapping of the entire franchise system.[26] In response, the Secretary of State for Transport Lord Adonis reiterated the findings of a 2008 National Audit Office (NAO) report which had concluded that the rail franchising system delivered good value for money and steadily improving services.[29]

On 13 November 2009, NXEC relinquished its operation of the franchise, at which point the DoT took over through its newly formed subsidiary, East Coast.[30]

Changes

According to Rail, East Coast's management strategy was typically adverse to initiating changes and that relatively little had changed across the organisation's operations during its eight years of running the franchise.[31] Karen Boswell, the managing director of East Coast, disputed this observation and pointed to substantial investment in terms of both staff and assets since assuming control of the franchise in 2009, and also observed that the operation was financially sound and that East Coast had become one of Britain’s most profitable train operating companies by 2015.[31]

During May 2011, East Coast introduced a major new timetable known as "Eureka"; changes included an extra three million seats per year, a decrease in general journey times and the adoption of a more regular service pattern.[32][33] Within a few years of these changes, both train performance and punctuality figures had noticeably improved.[31] Beyond the timetable changes, the Eureka programme was accompanied by various service changes, such as a nearly £10 million investment in staff training and to modernise its catering carriages, facilitating the introduction of complimentary catering for all First Class travellers.[33]

Prior to October 2010, East Coast offered free Wi-Fi to passengers in both First and Standard Class coaches. From 5 October 2010, the operator introduced a charge of £4.99 per hour or £9.99 for 24 hours for only Standard Class passengers; a 15-minute free allowance was still provided.[34] In 2011, East Coast announced an investment of £600,000 for upgrading Wi-Fi equipment across its fleet, these new uplinks used a combination of satellites and lineside 3G/HSPA masts.[33]

On 28 February 2015, the final operating day of East Coast, Virgin branding and public relations material begun to be deployed at various stations. Furthermore, East Coast's website, Twitter and Facebook pages were updated overnight to reflect Virgin's branding. That same day, multiple coordinated anti-privatisation protests were held in several cities, including Edinburgh, Doncaster and London, which were organised by the National Union of Rail, Maritime and Transport Workers (RMT). On 1 March 2015, Virgin Trains East Coast assumed operations.[31]

Principal services

London – Leeds

This was the busiest East Coast service – half-hourly, with one train per hour serving Peterborough, Doncaster, Wakefield Westgate and Leeds, while the other served Stevenage, Grantham, Doncaster, Wakefield Westgate and Leeds. At weekends, they called at Stevenage every two hours while Peterborough, Grantham, Newark, Doncaster and Wakefield were served hourly.

London – Newcastle

East Coast operated a half-hourly service between King's Cross and Newcastle (one fast, one semi-fast) throughout the day, departing from London on the hour and the half-hour. The top-of-the-hour trains were part of the London to Scotland services which ran as limited-stop expresses between London and Newcastle (as seen below). The half-hour train called at Peterborough, Newark, Doncaster, York, Northallerton, Darlington, Durham and terminated at Newcastle, although there was an extension of this service to Edinburgh every 2 hours. At weekends, all daytime services to Newcastle continued through to Edinburgh, with some going non-stop. Late evening services terminated at Newcastle.

London – Edinburgh

This was East Coast's flagship route, serving the whole length of the East Coast Main Line; an hourly service from London to Edinburgh Waverley, calling at York, Darlington, Newcastle, Berwick-upon-Tweed and Edinburgh. Some of these trains also called at Peterborough. Occasionally there was a half-hourly service to Edinburgh with some Newcastle trains extended at peak hours. At weekends all services on the half-hour continued to Edinburgh from Newcastle.

During the day, services to London King's Cross from Edinburgh ran every 30 minutes, one fast and one semi-fast. All trains called at Newcastle and most at Berwick upon Tweed, Darlington and York. In May 2011 East Coast re-introduced the historic Flying Scotsman service. This was an early-morning service to London King's Cross with a journey time of four hours, departing Edinburgh Waverley at 05:40, calling only at Newcastle at 07:03 and arriving at London at 09:40.

London – Newark/York

An hourly service ran between King's Cross and Newark, calling at all intermediate stations. This was extended to York every two hours, serving Retford and Doncaster and at peak times was extended to Newcastle. These services operated only on weekdays. Additional services also start/terminated at Doncaster or Peterborough at peak times.

A Map of East Coast Services showing the service pattern each hour and extensions

Limited service

London – Glasgow

There was only one direct through train per day in each direction between King's Cross and Glasgow Central departing Glasgow at 06:50 and departing King's Cross at 15.30 as an extension of a London to Newcastle service also calling at Edinburgh. There were no East Coast service to Glasgow on Saturdays.

London – Aberdeen

These trains were extensions to the hourly London-to-Edinburgh service. There were three trains per day each way between King's Cross and Aberdeen, departing at 10:00 (The Northern Lights), 14:00 and 16:00 (weekdays only), the journey time being just over seven hours. There was also one service per day in each direction between Leeds and Aberdeen. These services were operated by InterCity 125 sets, as the Edinburgh to Aberdeen line and York to Leeds section via Garforth were not electrified. This route crossed the historic Forth, Tay and Montrose bridges.

London – Inverness

This was an extension of a London-to-Edinburgh service with a daily service operating between King's Cross and Inverness, departing at 12:00 with the southbound service departing Inverness at 7:55 (09–40 Sundays), named the Highland Chieftain. The journey took just over eight hours and was operated by InterCity 125 sets, as the line between Edinburgh and Inverness was not electrified.

London – Bradford

One train per day in each direction ran between Bradford Forster Square and King's Cross via Leeds. This used an electric InterCity 225 train as the route was fully electrified. This service offered the fastest journey time of 1hr 59m, only stopping at Wakefield Westgate on the way to London.

London – Skipton

There was a morning train from Skipton to King's Cross with an early evening return. It was an extension of the London to Leeds service. Though the line to Skipton was electrified throughout, the East Coast service to/from the town was initially operated using a diesel HST because the electrical infrastructure on the Leeds to Skipton line was insufficient to support a Class 91 locomotive in addition to the Class 333 electric multiple units that operated the local services from Leeds to Skipton.

However, tests took place on 16 January 2011 for the operation of InterCity 225s on this service. From the timetable starting 22 May 2011, the evening return train from Kings Cross was worked by an InterCity 225 (Monday – Fridays only).[35]

The Saturday run of the outward service was the only East Coast service serving Leeds not to call at Wakefield Westgate: after Leeds, this service took the route via Micklefield and Hambleton Junctions to Doncaster. Although the other trains to/from Skipton used the InterCity 225, the Saturday run of the outward service used the InterCity 125 because the alternative route used was not fully electrified.

London – Lincoln

From May 2011, a direct train ran between King's Cross and Lincoln Central, with one service per day in each direction as an extension of the London – Newark service. This service used a diesel InterCity 125 set as the Nottingham to Lincoln line was not electrified.

London – Hull

The Hull Executive ran between King's Cross and Hull, with one train per day each way. This service also used InterCity 125 sets, as the Hull line was not electrified. More frequent services between King's Cross and Hull were operated by First Hull Trains.

London – Harrogate

There was a daily morning departure from Harrogate to King's Cross and an evening return. This service used a diesel InterCity 125 set as the Harrogate Line was not electrified.

Named trains

East Coast operates a number of named passenger trains, including:

NameOriginDestinationOther details
Flying ScotsmanLondon King's CrossEdinburgh WaverleyService began 1862 in both directions; named by the LNER in 1924
Highland ChieftainLondon King's CrossInverness1tpd both ways, the longest East Coast route
Hull ExecutiveLondon King's CrossHull
Northern LightsLondon King's CrossAberdeen1tpd both ways

Rolling stock

East Coast inherited the rolling stock operated by NXEC, comprising Class 43 diesel sets with their Mark 3 coaching stock (InterCity 125), and Class 91 electric locomotives and Mark 4 coaches (InterCity 225). This same rolling stock dated back to the British Rail era and, in some cases, was approaching 40 years old by the final year of East Coast's operation.[31]

The original franchise holder, GNER, undertook a major refurbishment of its rolling stock from 2003, which it titled "Project Mallard". Between 2003 and 2005, the Mark 4 carriage fleet was upgraded and refurbished, while work started on refurbishing the Mark 3 coaches under GNER in early 2007. This work continued under NXEC, with the final InterCity 125 set completed in October 2009.[36] The Mallard interiors were used throughout East Coast's tenure; Rail alleged that, by 2015, some sets were looking particularly worn and in need of another refurbishment or wholesale replacement.[31]

Some minor changes were made to the InterCity 225 fleet, perhaps the most noticeable of which was their repainting into East Coast's silver livery. This repaint was started in June 2010, with the first full set (excluding loco) being released on 30 July 2010. A key concept behind the new livery was that a plain base livery would be readily customisable to suit any potential future operator of the franchise.[37]

Fleet at end of franchise
 Trainset   Class  Image  Type   Top speed   Number   Routes operated 
 mph   km/h 
InterCity 125 Class 43 Diesel locomotive 125 200 32 London Kings Cross-Lincoln Central, Harrogate, Hull Paragon, Aberdeen & Inverness. Also Skipton-London King's Cross (Saturdays only) and Leeds-Aberdeen
Mark 3 carriage Passenger carriage 125 200 117
InterCity 225 Class 91 Electric locomotive 140 225 31 London Kings Cross-Leeds, Bradford Forster Square, Newark North Gate, Skipton, York, Newcastle, Edinburgh Waverley & Glasgow Central
Mark 4 carriage Passenger carriage 140 225 302
Driving Van Trailer 140 225 31

Cancelled future fleet

At one point, East Coast were set to receive five Class 180 Adelante DMUs. Due to a reduction in the number of extra services, and with Directly Operated Railways stating its unhappiness with the Class 180 units,[38] they were sent to First Great Western for use on the Cotswold Line instead.

East Coast investigated the use of a single 11-coach Pendolino from July 2011,[39] but ultimately decided instead to lease an extra HST set from East Midlands Trains from May 2011, bringing the number of HSTs leased to East Coast to 14.[40]

Locomotive naming

The fleet of Class 91 locomotives inherited by East Coast has carried various names up until 2008. In 2011, in response to customer requests, East Coast resumed the practice. It began by naming 91109 as Sir Bobby Robson, unveiled in a ceremony at Newcastle station on 29 March 2011 by his widow Elsie and Alan Shearer, patron of the Sir Bobby Robson Foundation, which the company was also now a supporter of.[41][42]

On 2 June 2012, 91110 was renamed "Battle of Britain Memorial Flight" by Carol Vorderman at the National Railway Museum as part of the Railfest 2012 Event.[43]

On 16 February 2013, 91107 was renamed "Skyfall" and temporarily returned to its original "91007" number to mark the James Bond film of the same name, which featured trains extensively and became the highest-grossing film of all time in the United Kingdom.[44]

On 14 October 2014, 91111 was unveiled to mark the 100th anniversary of World War I. The specially-designed East Coast locomotive, named 'For The Fallen', carries a livery filled with images, stories and tributes to regiments and people who served in them across the East Coast route.[45]

Performance

The public performance measure (PPM) shows the percentage of trains which arrive at their terminating station on time. It combines figures for punctuality and reliability into a single performance measure. The moving annual average PPM for East Coast by the end of its franchise (P12 2014-14) was 88.2%.[46]

Unlike the majority of rail franchises, East Coast was a profitable ongoing concern. It paid back in excess of £1 billion to the British government over the course of its franchise.[47]

Loyalty scheme

East Coast inherited the 'escape' loyalty scheme from National Express which was eventually rebranded as East Coast Rewards. The original scheme involved giving benefits to customers who spent over £1,750 in a three-month period on East Coast tickets. Benefits included first class lounge access for the member and a guest, discounts at partner retailers, 20% off online advance ticket booking and a large number of free first class travel tickets.

As this scheme had a high barrier to entry East Coast launched a revamped loyalty scheme in 2011 which was points based and included all spend on the East Coast website even if booking travel for other operators. The scheme meant rewards such as free travel were now within reach of a greater number of passengers as only a modest spend was required to earn benefits. The scheme initially launched with online bookings only but was then expanded to cover season tickets and business travel.

TV series

In November 2013, Sky1 started to broadcast a documentary series "All Aboard East Coast Trains".[48] One of the InterCity 225 sets was painted in a special blue livery which includes faces of employees that feature in the programmes in order to promote the series.[49]

References

  1. "Companies House extract company no 4659708". Archived from the original on 27 September 2013. Retrieved 30 July 2013.
  2. "East Coast rail change confirmed". BBC News. 5 November 2009. Archived from the original on 24 August 2017. Retrieved 5 November 2009.
  3. "East Coast rail to be state-run". BBC News. 1 July 2009. Archived from the original on 12 October 2011. Retrieved 7 February 2014.
  4. "National Express East Coast franchise" (Press release). Department for Transport. 1 July 2009. Archived from the original on 18 July 2009.
  5. "Railway plan puts new focus on passengers" Archived 13 August 2013 at the Wayback Machine Secretary of State for Transport statement, 26 March 2013.
  6. "Three bidders announced in competition for East Coast rail franchise". STV News. 17 January 2014. Archived from the original on 2 February 2014. Retrieved 22 January 2014.
  7. East Coast rail shortlist revealed Archived 16 December 2018 at the Wayback Machine BBC News, 17 January 2014.
  8. InterCity East Coast franchise shortlist announced Archived 20 November 2018 at the Wayback Machine Railway Gazette, 17 January 2014.
  9. More seats, more services and new trains for East Coast passengers Archived 5 December 2014 at the Wayback Machine Department for Transport, 27 November 2014.
  10. Stagecoach and Virgin win East Coast mainline rail franchise Archived 28 November 2014 at the Wayback Machine BBC News, 27 November 2014.
  11. 3.3bn premium wins East Coast franchise for Stagecoach and Virgin Archived 8 December 2014 at the Wayback Machine Railway Gazette, 27 November 2014.
  12. "From poisoned chalice to Holy Grail?". 7 January 2015.
  13. "Sea Containers wins East Coast Main Line franchise". Rail. No. 276. Peterborough: Bauer Media Group. 10 April 1996. p. 10.
  14. Strategic Rail Authority (22 March 2005). "Biggest Deal in European Rail History Marks East Coast Franchise Announcement". Financial Express (Press release). Archived from the original on 4 October 2013. Retrieved 18 October 2012.
  15. "GNER wins second franchise term". Railway Gazette. 1 May 2005. Archived from the original on 4 October 2013. Retrieved 18 October 2012.
  16. Osborne, Alistair (23 March 2005). "GNER's blockbuster bid clinches East Coast Line". Daily Telegraph. London. Archived from the original on 7 October 2015. Retrieved 18 October 2012.
  17. Milmo, Dan (27 September 2006). "Ex-GNER chief says high bids threaten franchises". The Guardian. London. Archived from the original on 9 March 2016. Retrieved 11 December 2016.
  18. "GNER pays £1.3bn for East Coast franchise". Daily Telegraph. London. 22 March 2005. Archived from the original on 26 October 2013. Retrieved 18 October 2012.
  19. "GNER owner makes Chapter 11 move". BBC News Online. 16 October 2006. Archived from the original on 5 December 2013. Retrieved 18 October 2012.
  20. "Sea Containers files for Chapter 11 protection" Archived 9 March 2016 at the Wayback Machine The Guardian. 16 October 2006.
  21. "GNER to surrender top train route" Archived 8 November 2012 at the Wayback Machine. BBC News. 15 December 2006.
  22. "Four in East Coast rail shortlist". BBC News Online. 20 February 2007. Archived from the original on 22 February 2007. Retrieved 18 October 2012.
  23. "National Express awarded contract for growth on InterCity East Coast" (Press release). Department for Transport. 14 August 2007. Archived from the original on 19 December 2007. Retrieved 14 August 2007.
  24. "National Express wins rail route". BBC News Online. 14 August 2007. Archived from the original on 22 February 2009. Retrieved 1 July 2009.
  25. Hawkins, Nigel (4 September 2009). "On the buses". Adam Smith Institute. Archived from the original on 5 August 2012. Retrieved 18 October 2012.
  26. "Q&A: National Express and East Coast line". BBC. 1 July 2009. Archived from the original on 30 November 2020. Retrieved 1 July 2009.
  27. Milmo, Dan (3 May 2009). "National Express in talks over scrapping east coast franchise". The Guardian. London. Archived from the original on 4 October 2013. Retrieved 3 May 2009.
  28. "East Coast rail to be state-run". BBC News. 1 July 2009. Archived from the original on 12 October 2011. Retrieved 1 July 2009.
  29. "Archived copy" (PDF). Archived from the original (PDF) on 4 June 2012. Retrieved 17 September 2012.CS1 maint: archived copy as title (link)
  30. "East Coast rail change confirmed". BBC News. 5 November 2009. Archived from the original on 8 November 2009. Retrieved 17 September 2012.
  31. "Eight years on – East Coast loses its way". railmagazine.com. 18 March 2015.
  32. Rail Professional https://www.railpro.co.uk/railpro-magazine/magazine-archives/eureka-moment
  33. Business Traveller https://www.businesstraveller.com/news/2010/11/15/east-coast-to-offer-free-meals-in-first-class/ Archived 16 October 2019 at the Wayback Machine
  34. "East Coast > WiFi". National Express. Archived from the original on 18 November 2009. Retrieved 20 November 2009.
  35. "Archived copy" (PDF). Archived (PDF) from the original on 16 May 2011. Retrieved 8 May 2011.CS1 maint: archived copy as title (link)
  36. "Final East Coast HST set handed over" Archived 26 February 2012 at the Wayback Machine, Railway Herald, Issue 200, p. 5.
  37. "'Silver link': East Coast IC225s to be reliveried". The Railway Magazine. London. 156 (1308): 6. April 2010. ISSN 0033-8923.
  38. Miles, Tony (November 2009). "DOR evaluates alternative to Adelante sets". Modern Railways. London: 74.
  39. "Test Pendolino for East Coast line raises Virgin hackles". RailNews. Stevenage. 13 August 2010. Archived from the original on 16 August 2010. Retrieved 16 August 2010.
  40. "East Coast leases 14th HST from May". Rail. Peterborough (669). 4 May 2011.
  41. "Sir Bobby Robson name given to train". BBC News Online. 29 March 2011. Archived from the original on 25 December 2017. Retrieved 29 March 2011.
  42. "East Coast Names Train Sir Bobby Robson" (Press release). East Coast. 29 March 2011. Archived from the original on 29 March 2011. Retrieved 29 March 2011.
  43. "Railfest 2012". York: National Railway Museum. Archived from the original on 1 April 2012. Retrieved 22 March 2012.
  44. "Archived copy". Archived from the original on 20 February 2013. Retrieved 9 February 2013.CS1 maint: archived copy as title (link)
  45. "EAST COAST UNVEILS MOVING TRIBUTE 'FOR THE FALLEN'". East Coast. 14 October 2014. Archived from the original on 19 December 2014. Retrieved 11 November 2014.
  46. "Network Rail Performance figures (updated every four weeks)". Archived from the original on 30 November 2020. Retrieved 15 January 2016.
  47. "East coast mainline pays taxpayers £1bn sparking fresh reprivatisation fury". The Guardian. Archived from the original on 26 August 2016. Retrieved 4 July 2016.
  48. "Archived copy". Archived from the original on 3 November 2013. Retrieved 1 November 2013.CS1 maint: archived copy as title (link)
  49. "Archived copy". Archived from the original on 23 December 2015. Retrieved 18 January 2017.CS1 maint: archived copy as title (link)
Preceded by
National Express East Coast
Operator of InterCity East Coast franchise
2009–2015
Succeeded by
Virgin Trains East Coast
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.