Fen line
The Fen Line is a railway line in the east of England that links Cambridge in the south to King's Lynn in the north. The line runs through Cambridgeshire and Norfolk and is so called because it passes through the Fens. It is 41 miles 47 chains (66.9 km) in length and has eight stations.
Fen Line | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Owner | Network Rail | ||
Locale | East of England | ||
Termini | Cambridge King's Lynn | ||
Stations | 8 | ||
Service | |||
Type | Heavy rail | ||
System | National Rail | ||
Operator(s) | Great Northern Greater Anglia CrossCountry | ||
Rolling stock | Class 317 Class 387 "Electrostar" Class 379 "Electrostar"[1] Class 170 "Turbostar"[2] Class 365 "Networker" Class 755 "FLIRT" | ||
Technical | |||
Line length | 41 miles 47 chains (66.9 km) | ||
Number of tracks | 1-2 | ||
Character | Secondary\London & South-East[2] | ||
Track gauge | 4 ft 8 1⁄2 in (1,435 mm) standard gauge | ||
Electrification | 25 kV AC OHLE | ||
Operating speed | 90 mph (145 km/h) maximum[3] | ||
|
Fen line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mileage from London Liverpool Street |
The line is part of the Network Rail Strategic Route 5 and comprises SRS 05.06 and part of 05.05. It is classified as a secondary line except between Cambridge and Ely where it is classified as a London and South East commuter line.[2]
Services
Great Northern
Great Northern operate through services to London King's Cross (via the Cambridge line). These services operate non-stop between London and Cambridge for most of the day, as part of the half-hourly "Cambridge Express" service. One train an hour is extended beyond Cambridge to serve all stations to King's Lynn, whilst the alternative services run to Ely.
These services are mostly operated by Class 387 electric multiple units. Before May 2017, Class 365s were the principal units.
Three Class 365 EMUs received names associated with the line:
- The Fenman (365518) – previously a "named train" that used to operate on this line, consisting of locomotive-hauled InterCity (British Rail) trains;
- Robert Stripe Passengers' Champion (365527) was named on 10 March 2006, after the 21st Anniversary of the Fen Line Users Association;
- Nelson's County (365531) had a special livery applied to the outside which shows various scenes of West Norfolk however this was removed when Great Northern took over First Capital Connect.
Greater Anglia
Greater Anglia regularly runs services between Cambridge and Norwich on an hourly basis via the Breckland line, running non-stop between Ely and Cambridge. Class 170 units are typically used for this service.
In addition to this, Greater Anglia operate a few direct services between London Liverpool Street and King's Lynn or Ely (via the West Anglia Main Line). These services operate only run during the morning and evening peaks, and use Class 317 and Class 379[1] units.
CrossCountry
The section between Cambridge and Ely is also used non-stop by CrossCountry services from Stansted Airport (and onward to Birmingham New Street via Peterborough and Leicester).
Signalling
The line is double tracked except between Littleport and Downham Market and between Watlington and King's Lynn where it is bi-directionally signalled single track. In the Down direction, the entrance to the single line sections is protected additionally by SPAD indicators.
Signal boxes controlling the line are;
- Cambridge power box
- Littleport
- Downham Market
- Magdalen Road (Watlington)
- King's Lynn
The signalling system is Track circuit block with multiple aspect colour light signals- with the exception of:
- one semaphore signal at King's Lynn[4] which controls entry to the One Train In Section freight-only line from King's Lynn to Middleton Towers
- two semaphore shunt signals at Downham Market station
On 19/11/2020, the Department of Transport announced funding to renew the Signalling on the Fen Line to ETCS Cab Signalling.[5]
Infrastructure
Traction current for electric trains is provided by 25 kV AC OHLE controlled by Romford Electrical Control Room.[6] There are Neutral Sections at Shepreth Branch junction, Milton Fen and just north of Littleport bypass. The line has a loading gauge of W8 except for the section connecting the Ipswich–Ely line to the Ely–Peterborough line, which is W10.[2]
Passenger volume
These are the statistics of the numbers of passengers on the line from the year beginning April 2002 to the year beginning April 2017. Comparing each station between the first and last years (14 years total), King's Lynn has increased by 68%, Watlington by 133%, Downham Market by 111%, Littleport by 157%, Ely by 113%, Waterbeach by 149% and Cambridge by 109%.[7] Cambridge North did not open at the publication of these previous figures.
Station usage | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Station name | 2002–03 | 2004–05 | 2005–06 | 2006–07 | 2007–08 | 2008–09 | 2009–10 | 2010–11 | 2011–12 | 2012–13 | 2013–14 | 2014–15 | 2015–16 | 2016–17 | 2017–18 | 2018–19 | 2019–20 |
King's Lynn | 593,675 | 641,668 | 622,034 | 656,624 | 680,230 | 739,282 | 750,738 | 821,772 | 869,006 | 879,836 | 913,460 | 970,890 | 973,660 | 998,316 | |||
Watlington | 64,091 | 85,231 | 85,423 | 91,250 | 100,665 | 111,612 | 107,956 | 113,898 | 129,146 | 137,874 | 131,742 | 143,904 | 148,928 | 144,114 | |||
Downham Market | 248,368 | 277,744 | 276,900 | 307,013 | 361,433 | 365,612 | 360,032 | 406,690 | 432,014 | 452,674 | 460,060 | 491,744 | 500,442 | 523,846 | |||
Littleport | 94,363 | 119,198 | 122,655 | 146,218 | 148,836 | 156,124 | 149,428 | 178,254 | 199,804 | 206,596 | 225,024 | 238,062 | 229,628 | 242,814 | |||
Ely | 1,038,708 | 1,255,362 | 1,278,724 | 1,420,734 | 1,505,730 | 1,583,246 | 1,579,948 | 1,731,956 | 1,824,036 | 1,878,426 | 1,976,150 | 2,068,240 | 2,131,818 | 2,209,350 | |||
Waterbeach | 176,639 | 197,594 | 213,500 | 227,281 | 250,039 | 277,470 | 266,020 | 301,376 | 312,216 | 335,660 | 344,726 | 381,202 | 420,730 | 440,142 | |||
Cambridge North | n\a | n\a | n\a | n\a | n\a | n\a | n\a | n\a | n\a | n\a | n\a | n\a | n\a | n\a | |||
Cambridge | 5,478,112 | 6,060,475 | 6,137,423 | 6,522,309 | 6,997,887 | 7,571,838 | 7,661,146 | 8,245,416 | 8,823,236 | 9,168,938 | 9,824,910 | 10,420,178 | 10,954,212 | 11,424,902 | |||
The annual passenger usage is based on sales of tickets in stated financial years from Office of Rail and Road estimates of station usage. The statistics are for passengers arriving and departing from each station and cover twelve month periods that start in April. Methodology may vary year on year. Barking and Blackhorse Road are affected by usage of the ticket gates for the underground and that Gospel Oak connects to the North London Line section of the London Overground and is similarly affected. Barking is further affected by the ticket gates used to access C2C services. |
References
- Rail Magazine. 673: 37. 29 June – 12 July 2011. Missing or empty
|title=
(help) - "Route 5 – West Anglia" (PDF). Network Rail. Archived from the original (PDF) on 7 June 2011. Retrieved 22 May 2009.
- Network Rail (August 2006). East Anglia Route Sectional Appendix. Module EA. p. 109 LOR EA1162 Seq007. NR30018/02.
- Network Rail (August 2006). East Anglia Route Sectional Appendix. Module EA. p. 110 LOR EA1270 Seq001. NR30018/02.
- Switchboard 0300 330 3000, Media enquiries 020 7944 3021 Out of hours media enquiries 020 7944 4292. "New rail tech roll-out set to bring more reliable journeys and boost jobs". GOV.UK. Retrieved 19 November 2020.
- Network Rail (August 2006). East Anglia Route Sectional Appendix. Module EA. p. 110 LOR EA1161 Seq008. NR30018/02.
- "Station Usage". Rail Statistics. Office of Rail Regulation. Retrieved 2 September 2015.
Further reading
External links
Media related to Fen Line at Wikimedia Commons