Guru Nanak Dev Thermal Plant

The Guru Nanak Dev Thermal Plant ( ਗੁਰੂ ਨਾਨਕ ਦੇਵ ਥਰਮਲ ਪਲਾਂਟ ) at Bathinda[2] was one of the three thermal power stations in Punjab (the other being at Lehra Mohabat and Ropar[3]). It was a medium-sized power station with four units that were begun to be built in early 1970s and completed in 1982. All total generate up to 460 MW (2x110+2x120 MW) of power that meets the mammoth irrigation needs of lower Punjab.[4] Having generated electricity for 43 years to meet the power demand of punjab, the thermal shut down forever on September 27,2017.

Guru Nanak Dev Thermal Plant
CountryIndia
LocationBathinda
Coordinates30°14′04″N 74°55′32″E
StatusOperation ceased[1]
Owner(s)Punjab Government Power corporation
Thermal power station
Primary fuelCoal
Turbine technologyThermal
a view of thermal plant from NH 15

The plant was named after the first guru and founder of Sikhism, Sri Guru Nanak Dev Ji.

Capacity

It had an installed capacity of 440 MW. All four units ceased operations in September 2017[5]

Unit No.Generating CapacityCommissioned onStatus
1110 MW1974 Septemberclosed [6]
2110 MW1975 Septemberclosed [7]
3120 MW1978 MarchClosed [8]
4120 MW1979 JanuaryClosed [9]

See also

References

See also

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.