IC3
The IC3 (or class MF) is a Danish-built high-comfort medium/long distance diesel multiple-unit train.[1] The sets were built by ABB Scandia (later purchased by Adtranz, which itself was subsequently acquired by Bombardier Transportation) in Randers. This train model has been operating in Denmark and Sweden since 1989. The name indicates simply that it is a three-carriage InterCity trainset.
DSB Class MF | |
---|---|
DSB Class MF at Frederikshavn station August 2007 | |
In service | 1990–present |
Manufacturer | ABB Scandia |
Built at | Randers, Denmark |
Family name | Flexliner (IC2, IC3/Y2) Contessa (IR4/Øresundståg) |
Replaced | Locomotive-hauled InterCity cars and Litra MA |
Constructed | 1986–2001 |
Refurbished | Langå workshops (2017–) |
Number built | 202 |
Formation | MFA-FF-MFB |
Operator(s) | DSB RENFE Israel Railways SJ AB |
Specifications | |
Car body construction | Aluminium |
Train length | 58.80 m (192 ft 11 in) |
Width | 3.10 m (10 ft 2 in) |
Height | 3.85 m (12 ft 8 in) |
Maximum speed | 180 km/h (112 mph) |
Weight | 97 t (95.5 long tons; 106.9 short tons) |
Prime mover(s) | 1990: 4 x Deutz BF8L513CP V8 2006: 4 x Deutz TCD 2015 V6 |
Power output | 1990: 1,193 kW (1,600 hp) 2006: 1,342 kW (1,800 hp) |
Transmission | Mechanical, 1990: 4 x ZF Ecomat 5PH600 5-speed 2006: 4 x ZF AS-Rail 12-speed |
Acceleration | 1.0 m/s2 |
Braking system(s) | Pneumatic brake Electromagnetic track brake |
Safety system(s) | ATC-2, ERTMS/ETCS, PZB, ZUB 123 |
Multiple working | IC2 IR4 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) 1,668 mm (5 ft 5 21⁄32 in), RENFE |
An electrically powered four-carriage version, the IR4 was introduced between 1995 and 1998.[2]
General overview
The IC3 is a wide articulated train made of light alloy with Jacobs bogies shared between carriages. There are two 298 kW (400 hp) engines in each end of the front and rear carriages, central car has none, giving a total of 1,192 kW (1,598 bhp).
The efficient mechanical transmissions with multiple gear ratios and high power for the 97 t (95 long tons; 107 short tons) tare weight give the IC3 good acceleration capabilities. The short distances between stations on inter-city routes in Denmark makes acceleration more important than high top speed, and so the IC3 units are geared for a top service speed of only 180 km/h (112 mph).
The front- and cab-design is the most significant feature of the IC3 (and its cousins). When viewed from the outside, the viewer will notice the large rubber diaphragm surrounding a flat cab. The cab is separate department in the train, but the table with the controls are mounted on a huge door, to which the seat is also mounted. When two or more units are coupled together in a single train, the entire front door folds away to give a wide passage, and the rubber diaphragms at the ends form a flush aerodynamic seal. The IC3 can also couple and run in tandem with the electrical version, the IR4. Up to five trainsets can be coupled together. In case of shuttle reason the IC3 can also be coupled mechanically with its Flexliner little sister IC2 but not the cousin ET-FT-ET.
DSB, runs 96 IC3 sets and 44 IR4 sets.
Some IC3 run in Sweden, mainly Kalmar-Linköping. They are designated Y2 or Y2K in Sweden (K for a version adapted run in Denmark as well). Before 2007 they also ran Malmö-Karlskrona, but that railway has been electrified.
Another large operator of the IC3 trains is Israel Railways, who operate about 50 IC3 sets. Some of those sets were assembled in Israel by RAMTA, a division of Israel Aircraft Industries, and some are modified IC3 trainsets which were originally delivered to Sweden.
Similarly in Spain, the national rail operator RENFE operates some IC3 derivatives classified as RENFE Class 594 on the Valladolid - Zamora - Puebla de Sanabria, Coruña - Ferrol, Coruña - Lugo - Monforte de Lemos and Madrid - Soria routes since 1997 as a medium-range regional service (Media Distancia) The Class 594 trains were built by CAF under a technology license agreement from ABB Scandia.
In 1997, an Israel Railways IC3 was tested in North America under the name ‘Flexliner’. Amtrak used it on the Hiawatha Service, St Louis and Kansas City Mules, San Diegan, and between Eugene and Portland, Oregon; Via Rail Canada tested it for services on the Windsor–Quebec corridor.
The total number of ABB Scandia/Adtranz-built IC3 and IC3-based trainsets is 202.
History
Development of the IC3 started in 1984, production started in 1986, and they entered service in 1991. However, its roots can be traced back further. In 1972, DSB celebrated its 125th anniversary, and at the same time made some large changes. First of all, two years later, in 1974, a completely new timetable system, the K74, was introduced. Secondly, the concept of lyntog were removed as the foundation of the long-distance traffic, and instead a new InterCity concept took over that role. After a few years, a new concept emerged, the so-called APOs, which were work-groups tasked with specific areas. There were groups for electrical locomotives, diesel-powered locomotives, and others, including the "long distance train" APO group.
The long-distance train - APO was originally tasked with finding a suitable train for long-distance traffic. However, it was later rumoured that the lyntog-concept might be re-introduced within a few years, and so it was decided to find a suitable design for that concept. Several requirements were made: primarily to use air-conditioning for cooling and heating of passenger areas, and be able to use either electric or diesel propulsion. The second requirement were due to the fact, that the Danish politicians had yet to decide whether or not to fund a proposed electrification of the mainlines of the Danish railroads. At the time, no such train were available, so the group designed one themselves. In order to avoid propulsion units in the train (and thus reducing variants and development costs), it were designed to use a locomotive to haul it, and equip the end wagons with driver cabins. The train were designed a set of 5 wagons, with a service wagon in the middle (containing a small kiosk, and other facilities) and 4 passenger wagons.
In 1983, the group responsible for the timetables, had made a set of requirements for the ideal future train for the InterCity traffic, and those requirements were based on the experiences from the prototype (which had now become known as IC5): it should be light-weight (preferably built of aluminium), its passenger compartments should have fixed windows and air-conditioning, it should be self-propelled, it should use standard engine and transmission components from the bus and truck industry, and it should be fast and easy to add carriages (by coupling with another trainset); along with a number of technical requirements. The new project became designated IC3.
After the IC3 project had been proposed, it was relatively quickly decided to cancel development of the IC5-prototype, as it suffered from several problems. The main problem was the weight of the train. Originally it had been estimated to weigh around 200 to 210 tonnes (197 to 207 long tons; 220 to 231 short tons), but ended up weighing 270 tonnes (266 long tons; 298 short tons). A train of similar size and capacity, consisting of conventional wagons, would weigh approximately the same as originally estimated. When it was first proposed to cancel the IC5 project, the trains designers tried to save it by proposing several solutions to the trains problems, but to no use: DSB's management had decided that the IC3 was the proper train for the future.
The task of developing the IC3 was assigned to a joint-group of designers and technical engineers from DSB itself and the factory Scandia (now a part of the Bombardier corporation). As a side note, it should be mentioned that neither DSB or Scandia themselves, wished that they (Scandia) got the task, as they had pretty much no experience in this kind of trains.
The first IC3 set was delivered in 1988, but unfortunately suffered from a number of teething problems, primarily due to its (at the time very advanced) computer systems. One example was that it would lock the toilet door with no apparent reason (it was programmed to lock the door when either someone was in there and requested so via a button, or when the toilet-system suffered a problem). Another issue was that snow would build up around the diaphragms blocking the drivers view. By late 1990, the majority of these problems had been solved, and so the train entered service in 1991.
In 2017, DSB announced the IC3 stock would receive a 10-year life extension, allowing them to replace IC4 trains.
In 2018, the first six ERTMS-retrofitted IC3 trains left the workshop at Langå, with the conversions performed by Alstom with technical assistance from Banedanmark and DSB.[3][4] All IC3's are to be converted to ERTMS from the proprietary ZUB 123 ATC system, which is to be done around the fall of 2019 and into 2020.[5]
In 2021, DSB bought two sets from Israel Railways for spare parts.[6]
In 2021, the Maritime and Commercial Court ruled that Deutz AG had misused a dominant market position in 2010 regarding replacement motor parts.[7][8]
Technical overview
An IC3 set consists of (as the name implies) three carriages. These are the MFA (passenger and motor carriage), the FF (passenger center carriage) and the MFB (passenger and motor carriage). The MFA and MFB are, from a technical point of view, identical and only differ slightly in the interior design.
The train is powered by four diesel engines, each delivering 298 kW (400 bhp; 405 PS), giving the train a total 1,193 kW (1,600 bhp; 1,622 PS) to propel it. The engines are mounted in the MFA and MFB carriages, with two engines in each carriage. Each engine drives the axles on the bogies via an electronically controlled automatic gearbox. The engines are mounted so that the end which would normally point forwards in a rear-wheel-drive car, instead faces the center of the MFA and MFB carriages. Due to this mounting design and nature of combustion engines and to the fact that the train runs forward in both directions, a so-called "reverse gear" had to be attached to automatic gearboxes. They are responsible for making the axles turn the right way. These gears are normally not controlled directly by the train's driver; instead, the train's on-board computers check which of the two cabs is active to determine the train's primary driving direction, setting the reverse gears accordingly.
Fleet details
Class | Operator | Number built | Year built | Cars per set | Unit nos. | Notes |
---|---|---|---|---|---|---|
Class MF | DSB | 92 | 1986–1992 | 3 | 5001-5092 | 5076-5092 fitted with PZB to go to Germany |
4 | 5093-5096 | Purchased from SJ | ||||
Class 594.0 | RENFE | 16 | 1997–2001 | 2 | 594.001-594.002 594.004-594.008 594.010-594.015 |
|
Class 594.1 | 8 | 594.101-594.108 | Built with tilting capability | |||
Class 594.2 | 2 | 594.201-594.202 | Converted from 594.0 Built with variable gauge capability | |||
IC3 | Israel Railways | 10 | 1992 | 3 | 01-10 | |
31 | 1994–1996 | 11-41 | ||||
9 | 1990 | 42-50 | Purchased from SJ Entered service 2005 |
Danish derivatives
The IC3 has not only served as the backbone of the Danish InterCity concept for the past 15 years; it has also served as the foundation and/or inspiration for three other trains. These are the IR4, the IC2, and the Øresundtrain.
IR4 "InterRegional 4"
The first of the IC3's offspring, which is electrically powered. It was originally designed for the Danish regional traffic, but has later been upgraded and is currently also being used in the InterCity traffic, often together with one or more IC3-set(s) on routes which have been electrified. The IR4 consists of 4 carriages (as implied by its name), all of which are similar in design to the MFA/MFB carriages (when viewed from the outside), with a wide set of doors in one end of each carriages. A total of 44 IR4 sets were built, and all sets are still in use. 1 set burned in 2011[9] but was rebuilt and re-entered service in 2015.
IC2 "InterCity 2"
The second of the IC3's offspring is often described as a "discount edition of the IC3", which is not entirely fair. It was designed in 1992–1993, when some private railway operators in Denmark were looking for new trains. It was originally proposed to be an IC3 with the center carriage (the FF) removed, and without engines in one of the remaining carriages. This design did not entirely satisfy representatives of the private railways, so instead, after some debate, it was redesigned to its current appearance.
The IC2 consists of 2 carriages, the MF and the FS. The MF is a combined engine and passenger carriage, and has its set of doors placed towards the cab of the carriage, actually as close to the bogies as possible. The MF houses the engines, which are mounted under the floor in the middle of the carriage. It has two engines, delivering a total of 627 kW (840 hp), and drives the train in the same way as the MFA/MFB carriages drives the IC3.
The FS is a combined cab and passenger carriage, and has a quite unique look when viewed from the outside. This is due to the "low-floor entrance" feature included in the design, where part of the floor and doors between the two bogies are "sunken" to a height of 60 cm (23.6 inches) from the top of the rails. This provides very easy access to the train, especially when bicycles, wheelchairs, and the like need to be put on the train. This easy entrance is because the 60 cm (23.6 inches) from the top of the rails, is also the general height within a few centimeters (1–2 in or 2.5–5.1 cm) of platforms on the Danish railway network.
There are some technical differences between the IC2 and the IC3. The most obvious is of course the smaller number of carriages, and other engines (the IC3 has four engines, each delivering approx. 298 kW or 400 hp; the IC2 has two engines, each delivering approx. 313 kW or 420 hp). Other differences include the way the engines are cooled (the IC3 engines are air-cooled, but due to several technical issues with this system, it were decided to use water-cooled engines), electric-driven AC system (another thing decided after experience with the IC3, which AC system were powered directly from the engines).
One final thing to notice is that although the IC2 shares its physical profile and physical coupling system with the IC3 and the IR4, they are incapable of actually driving as a companion with those two "relatives". This is because the designers of the computer system which transmits the driver's commands to the engines and gearboxes have not been able to come up with a common system for all three train models. Instead, for the different types to work together, a special interface-module is required. This must be built into each trainset (except from the IC3, from which the original command-signal comes). However, due to financial issues, and the fact that it would probably not be used, it was decided not to have this module in the trains (although it can easily be added if needed).
A total of thirteen IC2-sets were built, all of which are in service and operated by Lokaltog A/S since 2015.
Oresundtrain
The third and newest of the IC3's offspring is specifically designed for use in the regional traffic in areas surrounding the Oresund Bridge. The train is operated by both DSB and SJ Öresund, with the latter being a sister company to SJ AB. Its formation is ET-FT-ET. The train is electrically powered, and can run on both Danish power (25 kV, 50 Hz) and Swedish power (15 kV, 162⁄3 Hz). It is called Contessa by its manufacturer,[10] and designated Litra ET in Denmark and X31K in Sweden. Only the front and the cabin are similar to IC3. The wheels, bogies and motors are more similar to Bombardier Regina and each carriage has two bogies. It is used for the regional cross-border traffic called Øresundståg, and the train type is also often called that, these trains are used for some other traffic also.
Train fire
On 28 December 2010, an IC3 train in Israel caught fire due to a technical failure, injuring 121 people.[11] A soldier shot the windows in order to allow the passengers to escape.[12] The cause of the fire was not an electrical short, as first suspected, but a mechanical problem with the cardan joint, which is located next to the fuel tank in the train.
On 30 December 2010 Israel Railways decided on an immediate stoppage of all the IC3s in the fleet, pending further investigation. The ramifications of this decision were the closure of several lines and stations, including Jerusalem and Dimona and several other suburban lines.[13] Service was resumed on all routes after modifications were approved.
Notes
- "DSB IC3 - Litra MFA-MFB" (in Danish). Jernbanen.dk. Archived from the original on 2013-11-13. Retrieved 2014-11-01.
- "DSB IR4 - Litra ER" (in Danish). Jernbanen.dk. Archived from the original on 2014-08-30. Retrieved 2014-11-01.
- https://ing.dk/artikel/efter-to-aar-foerste-ic3-med-nyt-signalsystem-trillet-vaerkstedet-212332
- https://www.bane.dk/Presse/Pressemeddelelser/IC3_tog-faar-digitalt-boost-i-Langaa
- https://ing.dk/artikel/mangler-60-millioner-banedanmark-overvejer-at-udskyde-eltog-holbaek-226124
- "Danske tog sejles hjem efter næsten 30 år: DSB vil 'skrælle' gamle tog for at få dele til IC3" (in Danish). Danmarks Radio. Retrieved 2021-01-30.
- "BS-73/2014-SHR Deutz AG mod Konkurrencerådet og BS-72/2014-SHR Diesel Motor Nordic A/S mod Konkurrencerådet" (in Danish). Danish Maritime and Commercial Court. Archived from the original on 2021-01-30. Retrieved 2021-01-30.
- "Motorleverandør snød DSB". Ingeniøren. Retrieved 2021-01-30.
- Methmann, Niels-Martin (2011-02-18). "DSB: Voldsom brand i tog" [DSB: Severe fire in train] (in Danish). DSB. Archived from the original on 2011-03-06. Retrieved 2014-11-01.
- "Inc. - Bombardier - Home". Bombardier. 2011-12-23. Archived from the original on 2008-04-19. Retrieved 2011-12-31.
- Ben-Zur, Raanan (2010-12-28). "Train fire leaves 121 injured". Ynetnews. Archived from the original on 2014-02-21. Retrieved 2014-11-01.
- Ben-Zur, Raanan (2010-12-28). "Train doors stuck; soldier fires at windows". Ynetnews. Retrieved 2014-11-01.
- לוח זמנים מיוחד החל מהיום [Special schedule starting today] (in Hebrew). Israel Railways. 2011-01-02. Archived from the original on January 2, 2011. Retrieved 2011-01-02.CS1 maint: unfit URL (link)
See also
- IE 22000 Class
- IC4
- RegioSwinger
- SNCB Class AM96
References
- List of all Danish IC3 units - some with pictures and brief information (Danish)
- Details on mechanical train transmissions
Wikimedia Commons has media related to IC3. |
Wikimedia Commons has media related to Y2, the Swedish IC3. |