Kaifeng Thermal Power Station (Chinese: 开封火电厂),[2] also spelled Kaifeng Thermal Power Plant,[3] is a thermal power project located in Kaifeng, Henan. Its construction began in October 1969, and has gone through the historical stages such as the Cultural Revolution, Reform and opening up, factory director responsibility system (厂长负责制), corporatization restructuring (公司化改制), transformation and upgrading.[4]

Kaifeng Thermal Power Station
开封火电厂
CountryChina
LocationKaifeng, Henan
PurposePower
Construction beganOctober 1969[1]

History

The construction of the Kaifeng Thermal Power Plant began in October 1969,[5] and the first phase of the project was installed with 2x50,000 kilowatt units,[6] which were put into operation in 1973 and 1974. [7] In April 1977, the power plant was expanded with two units of 125,000 kilowatts, which were put into operation in 1978, with a total installed capacity of 350,000 kilowatts.[8]

On September 10, 2007, the construction of the expansion project of Kaifeng Thermal Power Plant started, and the project was constructed by Gezhouba Group. [9] This project was newly built two 600MW supercritical units. In December 2008, its first unit passed the 168-hour full-load test running (168小时满负荷试运行).[10] In March 2009, its second unit passed the 168-hour full-load test running and was put into operation.[11]

With a total investment of 4.56 billion yuan, [12] the Kaifeng Thermal Power Plant's 2×600MW unit expansion project is the largest investment project in Kaifeng after the founding of the People's Republic of China.[13]

References

  1. Kaifeng City History. Beijing Yanshan Press. 2001. pp. 77–. ISBN 978-7-5402-1178-3.
  2. The Compilation Committee of Henan Province (1993). People's Republic of China Gazetteer: Henan Province. Commercial Press. ISBN 978-7-100-01047-4.
  3. "Document of The World Bank Report No. 15002-CHA". World Bank. January 29, 1996.
  4. "Kaifeng Thermal Power Station". State Power Investment Corporation. 2019-10-30.
  5. China Enterprise Profile. Enterprise Management Publishing House. 1988. pp. 72–. ISBN 978-7-80001-044-6.
  6. History of Henan Province: History of Architecture, History of Surveying and Mapping. Henan People's Publishing House. pp. 90–.
  7. Shao Wenjie (1991). Henan Provincial History: History of the Electric Power Industry. Henan People's Publishing House. pp. 90–.
  8. Henan Provincial Local History Compilation Committee (2010). Henan Provincial History: History of the Electric Power Industry. Henan People's Publishing House. pp. 90–.
  9. "Kaifeng thermal power plant expansion project built by Gezhouba Group put into trial operation". State-owned Assets Supervision and Administration Commission. 2008-12-11.
  10. "New record for construction period of 600,000 kilowatt units in Kaifeng Thermal Power Plant". State-owned Assets Supervision and Administration Commission. 2008-12-19.
  11. "Kaifeng Thermal Power Plant is fully operational and generating electricity". State-owned Assets Supervision and Administration Commission. 2009-03-12.
  12. "Kaifeng: seize opportunities for development". Henan Daily. 2009-04-17.
  13. "Kaifeng Thermal Power Plant Expansion Project Held Preparatory Launching Ceremony". State-owned Assets Supervision and Administration Commission. 2007-04-04.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.