Foshan–Dongguan intercity railway

Foshan–Dongguan intercity railway, also called the Foguan intercity railway, is an under construction regional railway within Guangdong province, China, between the cities of Foshan, via Guangzhou, to Dongguan. It forms one leg of the Pearl River Delta Metropolitan Region intercity railway network and will provide connections with the Guangzhou–Shenzhen intercity railway, Dongguan–Huizhou intercity railway and local metro systems. It will connect Panyu District, Guangzhou at the major Guangzhou South interchange, tunnelling under the Pearl River through Machong and Hongmei to Dongguan West providing connections via the Dongguan Rail Transit, the Guangzhou–Shenzhen intercity railway or the Dongguan–Huizhou intercity railway. The length of the railway is 36.681 kilometres. Although this first phase of the project is named Foshan–Dongguan intercity railway, it does not pass through the city of Foshan in any way. The second section of this railway from Panyu to Foshan West has been planned, prepared and the line is under construction as the southern section of Guangzhou–Foshan circular intercity railway.

Foshan–Dongguan
intercity railway
Overview
Native name佛莞城际轨道交通
佛莞线
StatusUnder Construction
LocalePeople's Republic of China
TerminiDongguan West
Panyu (through operation to Foshan West)
Stations7
Service
TypeHigher-speed rail
Operator(s)China Railway High-speed
History
Planned opening2021[1]
Technical
Line length36.681 km (23 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed200 km/h (124 mph)
Foshan-Dongguan ICR route map
 
Dongguan-Huizhou ICR
to Xiaojinkou
 
Guangzhou–Shenzhen ICR
to Shenzhen Airport
Dongguan West
 
Guangzhou–Shenzhen ICR
to Guangzhou South
Machong
Pearl River
Shizhiyang Tunnel (6,258m)
Guangzhou Lianhuashan
Guanqiao
Donghuan
Guangzhou Changlong
Changlong Tunnel (10,800m)
 
Guangzhou–Shenzhen–Hong Kong XRL
to Shenzhen North
 
Guangzhou–Zhuhai ICR
to Zhuhai
Panyu
 
Wuhan–Guangzhou HSR
to Wuhan
Foshan West
 
Guiyang–Guangzhou HSR
to Guiyang East
 
Nanning-Guangzhou HSR
to Nanning

Overview

It is planned to use domestic CRH6 Intercity EMUs on this railway. Targeting a maximum operational speed of up to 200 km/h. According to the plans, construction was expected to start in 2014, with a construction time of about 5 years. It is expected to open in 2021.[1]

Stations

Station Name Chinese Distance
km
PRD MIR (CR C-train)
transfers/connections
Metro
transfers/connections
Location
Dongguan West (Dongguanxi) 东莞西 0.00 0.00  GH   SS 
Machong 麻涌 5.36 5.36
Guangzhou Lianhuashan 广州莲花山 9.02 14.38
Guanqiao 官桥 5.48 19.86  4 
Donghuan 东环 8.35 28.21
Guangzhou Changlong 广州长隆 4.21 32.42  3   7  (via Hanxi Changlong station)
Panyu 番禺 6.56 38.98  GZ   GFZ   GFC   2   7  (via Guangzhou South railway station)
Through service via Guangzhou–Foshan circular intercity railway to/from Foshan West
Chencun 陈村 3.92  GFZ   GFC 
Beijiao West 北滘西 6.63  GFZ   GFC 
Shunde North 顺德北 5.21  GFZ   GFC   Guangfo  (via Dongping station)
Zhangcha 张槎 9.48  GFZ   GFC 
Foshan West (Foshanxi) 佛山西 11.18  GFZ   GFC 

References

  1. "2021年粤港澳大湾区将开工11个城际轨道交通项目". 2021年,粤港澳大湾区将建成广佛环线南段和佛莞城际
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.