Ling Ao Nuclear Power Plant

Ling Ao Nuclear Power Plant (岭澳核电站) is located on the Dapeng Peninsula in Longgang District, Shenzhen, Guangdong, China, about 60 km north of Hong Kong, 1 km north of Daya Bay Nuclear Power Plant. It is operated by China General Nuclear Power Group. The units on site are separated between phase I and phase II.

Ling Ao Nuclear Power Plant
CountryPeople's Republic of China
LocationLonggang District, Shenzhen, Guangdong
Coordinates22°36′17.24″N 114°33′05.36″E
StatusOperational
Commission date28 May 2002
Operator(s)Lingao Nuclear Power Company Ltd.[1]
Nuclear power station
Reactor typePWR: 2 x M310, & 2 x CPR-1000
Power generation
Units operational2 x 950 MWe, 2 x 1000 MWe (net)
2 x 990 MWe, 2 x 1080 MWe (gross)
Units planned4 x 1080 MW

Reactors

Ling Ao phase I has two nuclear reactors, 950 MWe PWRs Ling Ao I-1 and I-2, based on the French 900 MWe three cooling loop design (M310), which started commercial operation in 2002 and 2003.[2] The planned investment sum for phase I was ca 4 billion USD.[3]

In a Phase II development two CPR-1000 reactors, Ling Ao II-1 and II-2 (alternatively, units 3 and 4), were constructed in conjunction with Areva, based on the French three cooling loop design. Ling Ao II-1, China’s first domestic CPR-1000 nuclear power plant, was first connected to the grid on 15 July 2010,[4] having started criticality testing on 11 June 2010.[5] It started commercial operations on 27 September 2010.[6] Ling Ao II-2 was synchronized to the grid on May 3, 2011, with commercial operation beginning on August 7, 2011.[7]

Reactor data

The Ling Ao Nuclear Power Plant consist of 4 operational reactors.[8]

UnitTypeModelNet el. powerGross el. powerThermal powerConstruction startOperation startNotes
Ling Ao 1PWRM310950 MW990 MW2905 MW1997-05-152002-05-28 [9]
Ling Ao 2PWRM310950 MW990 MW2905 MW1997-11-282003-01-08 [10]
Ling Ao 3PWRCPR-10001007 MW1086 MW2905 MW2005-12-152010-09-15 [11]
Ling Ao 4PWRCPR-10001007 MW1086 MW2905 MW2006-06-152011-08-07 [12]

See also

References

  1. "Nuclear Power Reactor Details - LINGAO 1". Power Reactor Information System (PRIS). International Atomic Energy Agency. Retrieved 2010-07-18.
  2. "Fuel loading starts at new Chinese reactor". World Nuclear News. 22 April 2010. Retrieved 18 July 2010.
  3. China Daily (2002-07-04). "Nuke Plant in Ling'ao Cuts Costs". China Internet Information Center. Retrieved 2020-01-04.
  4. "First power at China's Ling Ao". Nuclear Engineering International. 16 July 2010. Archived from the original on 13 June 2011. Retrieved 17 July 2010.
  5. "Reactor starts up at Ling Ao II". World Nuclear News. 11 June 2010. Retrieved 18 July 2010.
  6. "New Ling Ao II unit enters into service". World Nuclear News. 27 September 2010. Retrieved 2 October 2010.
  7. "Second Ling Ao II unit enters service". World Nuclear News. 8 August 2011. Retrieved 12 December 2012.
  8. "Nuclear Power in China". www.world-nuclear.org. World Nuclear Association. Retrieved 2019-12-30.
  9. "Ling Ao-1". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
  10. "Ling Ao-2". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
  11. "Ling Ao-3". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
  12. "Ling Ao-4". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 2019-12-29. Retrieved 2019-12-30.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.