Pandan Reservoir MRT station

Pandan Reservoir MRT station is a proposed Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong East, Singapore.[1][2][3]

 JE7 
Pandan Reservoir
班丹蓄水池
பாண்டன் ரெசவோர்
Pandan Reservoir
Mass Rapid Transit (MRT) station
Coordinates1.320°N 103.745°E / 1.320; 103.745
Owned byLand Transport Authority
Line(s)
PlatformsIsland
Tracks2
Construction
Structure typeElevated
Platform levels1
ParkingYes
Bicycle facilitiesYes
Disabled accessYes
History
Opening2027 (2027)
ElectrifiedYes
Services
Preceding station   Mass Rapid Transit   Following station
One-way operation
Jurong Region Line
East Service
Future service
Terminus
TerminusJurong Region Line
North Service
Future service
towards Tengah
Location
Pandan Reservoir
Pandan Reservoir station in Singapore

It will be the southern terminus of the East Branch of the Jurong Region Line. Trains entering service at this station will terminate at Tengah.

History

On 9 May 2018, LTA announced that Pandan Reservoir station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 2, JRL (East), consisting of 7 stations between Tengah and Pandan Reservoir, and is expected to be completed in 2027.[4]

Contract J109 for the design and construction of Pandan Reservoir station and associated viaducts was awarded to Daewoo Engineering & Construction Co. Pte Ltd - Yongnam Engineering and Construction Pte Ltd Joint Venture at a sum of S$320.4 million in July 2020. Construction is expected to start in 2020. Contract J109 also includes the design and construction of the Jurong Town Hall and Toh Guan stations and the 3.6-kilometre (2.2 mi) associated viaducts.[5][6][7][8]

Location

The station complex will be situated next to Jurong Town Hall Road, between the junction with Pandan Garden, and the junction with Teban Garden Road. It is located in the Jurong East planning area in the Teban Gardens Subzone,[9] next to Commonwealth Secondary School.

Access to the station will be via 5 exits on each side of the Jurong Town Hall Road.[10]

References

  1. "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  2. "Residents and students welcome Jurong Region Line but find it confusing". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  3. "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  4. "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  5. "Land Transport Authority on Instagram: The contract for the construction of 3 stations for Jurong Region Line". Instagram. Retrieved 17 July 2020.
  6. "LTA | News Room | news-releases | LTA Awards Four Jurong Region Line Contracts". www.lta.gov.sg. Archived from the original on 17 July 2020. Retrieved 17 July 2020.
  7. "LTA awards 4 Jurong Region Line contracts worth more than S$682 million". CNA. Archived from the original on 17 July 2020. Retrieved 17 July 2020.
  8. Tan, Cheryl (17 July 2020). "LTA awards four contracts totalling $682.5 million for the Jurong Region Line". The Straits Times. Retrieved 18 July 2020.
  9. "Singapore's Jurong East Planning Area". Key Location. Retrieved 21 September 2019.
  10. "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.