Rail Vikas Nigam

Rail Vikas Nigam Limited is an organization associated with Indian Railways involved in building rail infrastructure required by the railways. It is an offshoot of the implementation of National Rail Vikas Yojana (NRVY) announced from the ramparts of Red Fort by the then Prime Minister, Sh Atal Behari Vajpayee, during the Independence Day speech on 15th August 2002. NRVY was formally launched by the Hon’ble PM on 26th December 2002 to bridge rail infrastructure deficit. RVNL came into being on 24.1. 2003 as a 100% owned PSU of the Ministry of Railway. It became fully functional by March 2005.

Rail Vikas Nigam
TypePublic Sector Undertaking
NSE: RVNL
BSE: 542649
IndustryRailway infrastructure
Founded2003
Headquarters,
Area served
India
Key people
Revenue10,060.07 crore (US$1.4 billion) (2019) [1]
810.30 crore (US$110 million) (2019)[1]
606.59 crore (US$85 million) (2019)[1]
Total assets11,403.17 crore (US$1.6 billion) (2019)[1]
Total equity2,714.75 crore (US$380 million) (2019)[1]
OwnerGovernment of India (87.84%)
Number of employees
545 (March 2019)
SubsidiariesHigh Speed Rail Corporation of India Limited
Websitervnl

RVNL has been granted the Mini-Ratna-1 status on 19.9.2013.

Projects

Special Purpose Vehicles

Kutch Railway Company Ltd

RVNL owns 50% equity in this project. The project length is 301 km and is for gauge conversion of Palanpur-Gandhidham section. Currently RVNL is doubling Samakhiali-Palanpur (248 km) anticipating increased traffic flow from Mundra and Deendayal Ports.

Bharuch Dahej Railway Co Ltd

RVNL is the largest stakeholder in this SPV with 35.46% equity. The project length is 63km and is for gauge conversion. The turnover in the year 2019-20 was Rs 28.40cr.

Krishnapatnam Railway Co Ltd

RVNL is the largest stakeholder in this SPV with 49.76% equity. The project length is 113.2 km and is for construction of new line from Obulaparivalli to Krishnapatnam port. Complete connectivity was provided in June 2019. Turnover in 2019-20 was Rs 202.29 cr.

Haridaspur Paradip Railway Co Ltd

RVNL is the largest equity shareholder with 28.57%. This SPV is for a new 82km line from Haridaspur to Paradip Port. This has recently been completed.

Angul Sukinda Railway Co Ltd

RVNL is the largest stakeholder in this SPV with 31.50% equity. This is for a new 102.42 km railway line from Angul-Sukinda. This line is still under construction.

Digi Roha Rail Ltd

RVNL is the second largest equity holder of this SPV with 26% equity, the largest being Dighi Port. This is for the construction of a new 34 km railway line from Roha to Dighi Port in Maharashtra.


New SPVs being formed:

Indian Port Rail Corporation Limited (IRPCL):

RVNL is participating in the formation of IRPCL. This is a SPV under the Ministry of Shipping, with the stakeholders being RVNL and 12 major ports. The initial authorised capital of the SPV is Rs 500 crore with RVNL’s equity participation being Rs 10 crore only or 10% of the initial subscribed share capital.

The mandate of the SPV is to enhance rail connectivity to the various Ports in the country. This includes maintenance of Port Railways along with up-gradation, modernisation and capacity augmentation as and when required.

Rail connectivity to Rewas Port in Maharashtara:


Work undertaken by RVNL:

RVNL began as an organisation for executing various projects of railway engineering, to meet the shortfall of rail infrastructure that the existing system of that time could not fulfil. It was important to think out of the box and find a solution as eventually the price would be heavy with respect to the curtailment of opportunities and options available to a developing nation.

From beginning with railway capacity augmentation through track doubling, new railway lines, gauge conversion, railway electrification, RVNL has moved onto working on metro railways, multimodal transport system, port connectivity, turnkey projects i.e. workshops, training institutes, green buildings, high speed rail projects, cable stayed bridges, river and road bridges, vertical lift bridge, mountain Railways and tunnels.

Completed projects[2]

S. No. Railway Project Name Type of Project Length (km)
1. Central Railway Diva - Kalyan 5th & 6th Line Doubling 11
2. Central Railway Pakni - Mohol Doubling Doubling 17
3. Central Railway Panvel - Jasai JNPT Doubling Doubling 28.5
4. Central Railway Pakni - Solapur Doubling Doubling 16.28
5. Eastern Railway Gurup - SaktigarhExtn of 3rd Line Doubling 26
6. East Central Railway Barauni - Tilrath Bypass Doubling Doubling 8.3
7. East Coast Railway Talcher-Cuttack-Paradeep Doubling with 2nd Bridge on Rivers Birupa& Mahanadi Doubling 3
8. East Coast Railway Jakhapura- Haridaspur 3rd Line Doubling 23.3
9. East Coast Railway Cuttack - Barang Doubling Doubling 14.3
10. East Coast Railway Rajatgarh-Barang Doubling Doubling 31.3
11. East Coast Railway Khurda-Barang - 3rd line (35 km) Doubling 32.32
12. Northern Railway New Delhi-Tilak Bridge- 5th & 6th line (2.65 km) Doubling 2.65
13. North Central Railway Palwal - Bhuteswar 3rd Line Doubling 81
14. North Central Railway Aligarh - Ghaziabad 3rd Line Doubling 106.1
15. North Western Railway Bhagat Ki Kothi - Luni Doubling Doubling 30.3
16. North Western Railway Karjoda - Palanpur Doubling Doubling 5.4
17. North Western Railway Rewari- Manheru Doubling Doubling 69.02
18. North Western Railway Rani-KeshavGanj Doubling Doubling 59.5
19. North Western Railway Abu Road-Sarotra Road- Patch doubling (23.12 km) Doubling 23.12
20. North Western Railway Swaruganj-Abu Road - Patch doubling (25.36 km) Doubling 25.36
21. Southern Railway Attipattu - Korukkupet 3rd Line Doubling 18
22. Southern Railway Pattabiram - Tiruvallur 4th Line &Tiruvallur - Arakkonam 3rd Line Doubling 41.89
23. Southern Railway Tiruvallur - Arakkonam 4th Line Doubling 28
24. Southern Railway Villipuram-Dindigul Doubling Doubling 273
25. Southern Railway Thanjavur-Ponmalai - Doubling Doubling 46.96
26. South Central Railway Pullampet - BalapallePh I of Gooty - Renigunta Doubling Doubling 41
27. South Central Railway Krishnapatnam - Venkatachalam Doubling with RE Doubling 16.5
28. South Central Railway Gooty - Renigunta Patch Doubling Doubling 151
29. South Central Railway Raichur - Guntakal Doubling Doubling 81.0
30. South Central Railway Guntur-Tenali-Doubling with electrification (24.38 km) Doubling 25
31. South Eastern Railway Tikiapara - Santragachi Doubling Doubling 5.6
32. South Eastern Railway Panskura - Kharagpur 3rd Line Doubling 45
33. South Eastern Railway Panskura - HaldiaPh 1 Doubling Doubling 14
34. South Eastern Railway Rajgoda - Tamluk (Jn. Cabin) Doubling Doubling 13.5
35. South Eastern Railway Tamluk Jn. Cabin – BasulyaSutahata Doubling Doubling 24.23
36. South Eastern Railway Goelkera-Monoharpur 3rd line (40 km) Doubling 27.5
37. South East Central Railway Bilaspur - Urkura 3rd Line Doubling Doubling 105
38. South East Central Railway Salka Road- Khongsara Patch Doubling Doubling 26
39. South East Central Railway Khodri-Anuppur, with Flyover at Bilaspur (61.6 km) Doubling 61.6
40. South Western Railway Hospet - Guntakal Doubling Doubling 115
41. West Central Railway Bhopal-Bina - 3rd line (143 km) Doubling 144.3
42. West Central Railway Itarsi-Budni - 3rd line (25.090 km) Doubling 25.09
43. North Western Railway Delhi - Rewari Gauge Conversion GC 94.2
44. North Western Railway Ajmer - Phulera - Ringus - Rewari Gauge Conversion GC 295
45. North Western Railway Bhildi - Samdari Gauge Conversion GC 223
46. Southern Railway Thanjavur - Villupuram Gauge Conversion GC 192
47. Southern Railway Cuddalore - Salem Gauge Conversion GC 193
48. South Western Railway Arasikere-Hassan-Mangalore Gauge Conversion GC 230
49. Western Railway Bharuch - Samni - Dahej Gauge Conversion GC 62
50. Western Railway Gandhidham - Palanpur Gauge Conversion GC 301
51. East Coast Railway Daitari - Banspani New Line NL 155
52. East Coast Railway Haridaspur-Paradeep (82 km) New Line 82
53. South Central Railway Obulavaripalle- Krishnapattnam (113 km) New Line 121
54. Southern Railway Vallarpadam - Idapally New Line NL 9
55. Railway Electrification Tomka -Banspani – RE RE 144
56. Railway Electrification Kharagpur (Nimpura) - Bhubaneswar Including Branch Line of Talcher - Cuttack - Paradeep RE 581
57. Railway Electrification Bhubaneswar - Kottavalasa RE 417
58. Railway Electrification Daund-Manmad Incl. Puntamba- Shirdi - RE RE 255
59. Railway Electrification Reningunta - Guntakal RE RE 308
60. Railway Electrification Yelahanka - Dharmavaram - Gooty RE RE 306
61. Railway Electrification Bharuch - Samni - Dahej RE RE 64
62. Railway Electrification Manheru- Hissar RE RE 74
63. Railway Electrification Jakhal - Hisar (79 km) RE 80.0
64. Railway Electrification Chhapra-Ballia-Ghazipur-Varanasi-Allahabad RE (330 rkm) RE 330
65. Railway Electrification Guntakal-Kalluru RE (40 rkm) RE 40
66. Railway Electrification Utretia - Rae Bareli - Amethi - Janghai RE (214 rkm) RE 214
67. Railway Electrification Daund-Baramati (44 rkm) RE 44
68. Railway Electrification Amla-Chhindwara-Kalumna RE 257
69. Railway Electrification Raipur-Titlagarh (203 rkm) {Part of Vizianagaram - Rayagada - Titlagarh - Raipur (465 rkm)} RE 203
70. Railway Electrification Rajpura - Dhuri - LehraMohabat (151 km) RE 151
71. Railway Electrification Guntakal - Bellary - Hospet incl. Tornagallu - Ranjitpura Branch Line (138 rkm) RE 138
72. Railway Electrification Wani- Pimpalkutti RE (66 rkm) RE 66
73. Railway Electrification Manoharabad- Medchal (14 km) RE 14
74. Railway Electrification Yalahanka-Penukonda (120.55 km)-Doubling RE -
75. Eastern Railway Civil Engineering Works in Connection with Diesel Loco Component Factory, Dankuni WKSP -
76. Eastern Railway Dankuni - Setting Up of Electric Loco Assembly and Ancillary Unit of CLW WKSP -
77. East Central Railway Barauni - 250 High Horse Power Loco Shed WKSP -
78. East Coast Railway Vadlapudi- Wagon PoH Workshop of 200 Nos Capacity Near Duvvada Station WKSP -
79. South Eastern Railway Setting Up of Diesel Multiple Unit (DMU) Manufacturing Factory at Sankrail/ Haldia WKSP -
80. DLW Varanasi - Augmentation of Production Capacity from 200 To 250 High HP Locos Per Year WKSP -
81. North Eastern Railway Aunrihar - DEMU Shed WKSP
82. South Central Railway Workshop for Manufacture of Flat Bogies for LHB Design Coaches, Yadgir WKSP -
83. Eastern Railway Barddhaman Yard - 4-lane road over bridge in lieu of 2-lane road over bridge No. 213 ROB -
84. Southern Railway Srirangam-Tiruchchirapalli Town - 4-lane road over bridge in lieu of 2- lane bridge No.380-A ROB -
85. North Western Railway IOC Siding at Salawas (Deposit Work) Others 2.82
86. South Central Railway Secunderabad- Upgradation of facilities at Centralised Training Academy for Railway Accounts TRG -
87. South Central Railway Moula Ali - Setting Up of Indian Railway Institute of Finance Management TRG -
88. North Western Railway Madar - Palanpur - Removing of PSR (Kms 589/1 to 590/1) Track Renewal -
89. North Central Railway Jhansi-Garhmau, Orai-Ata, Ata-Kalpi&Pokhrayan- Lalpur - Splitting of longer block sections TF -
90. North Central Railway Paman-Bhimsen - New B-class station TF -
91. Western Railway Sabarmati-Botad-subways in lieu of level crossing-23 Nos. RSW -
92. Western Railway Sabarmati-Botad-Subways in lieu of LCs-14 Nos. RSW -

    [3]

    Ongoing projects

    • Kolkata Metro Line 3
    • Diyodar-Dhanakwara-Jasali double line project
    • Yavatmal-Nanded New line
    • Lucknow – Pilibhit Via Sitapur, Lakhimpur Gc[4]

    Wagon Periodic Overhauling Workshop, Visakhapatnam,Andhra Pardesh

    • Gudur - Bitragunta 3rd Line Project

    See also

    • High Speed Rail Corporation of India Limited (HSRC) has been formed as a wholly owned subsidiary of RVNL with the approval of the President of India to develop high speed rail corridors in India. This is to run passenger trains at the speed of 350km/hr.