Rail Vikas Nigam
Rail Vikas Nigam Limited is an organization associated with Indian Railways involved in building rail infrastructure required by the railways. It is an offshoot of the implementation of National Rail Vikas Yojana (NRVY) announced from the ramparts of Red Fort by the then Prime Minister, Sh Atal Behari Vajpayee, during the Independence Day speech on 15th August 2002. NRVY was formally launched by the Hon’ble PM on 26th December 2002 to bridge rail infrastructure deficit. RVNL came into being on 24.1. 2003 as a 100% owned PSU of the Ministry of Railway. It became fully functional by March 2005.
Type | Public Sector Undertaking |
---|---|
NSE: RVNL BSE: 542649 | |
Industry | Railway infrastructure |
Founded | 2003 |
Headquarters | , |
Area served | India |
Key people | |
Revenue | ₹10,060.07 crore (US$1.4 billion) (2019) [1] |
₹810.30 crore (US$110 million) (2019)[1] | |
₹606.59 crore (US$85 million) (2019)[1] | |
Total assets | ₹11,403.17 crore (US$1.6 billion) (2019)[1] |
Total equity | ₹2,714.75 crore (US$380 million) (2019)[1] |
Owner | Government of India (87.84%) |
Number of employees | 545 (March 2019) |
Subsidiaries | High Speed Rail Corporation of India Limited |
Website | rvnl |
RVNL has been granted the Mini-Ratna-1 status on 19.9.2013.
Projects
Special Purpose Vehicles
Kutch Railway Company Ltd
RVNL owns 50% equity in this project. The project length is 301 km and is for gauge conversion of Palanpur-Gandhidham section. Currently RVNL is doubling Samakhiali-Palanpur (248 km) anticipating increased traffic flow from Mundra and Deendayal Ports.
Bharuch Dahej Railway Co Ltd
RVNL is the largest stakeholder in this SPV with 35.46% equity. The project length is 63km and is for gauge conversion. The turnover in the year 2019-20 was Rs 28.40cr.
Krishnapatnam Railway Co Ltd
RVNL is the largest stakeholder in this SPV with 49.76% equity. The project length is 113.2 km and is for construction of new line from Obulaparivalli to Krishnapatnam port. Complete connectivity was provided in June 2019. Turnover in 2019-20 was Rs 202.29 cr.
Haridaspur Paradip Railway Co Ltd
RVNL is the largest equity shareholder with 28.57%. This SPV is for a new 82km line from Haridaspur to Paradip Port. This has recently been completed.
Angul Sukinda Railway Co Ltd
RVNL is the largest stakeholder in this SPV with 31.50% equity. This is for a new 102.42 km railway line from Angul-Sukinda. This line is still under construction.
Digi Roha Rail Ltd
RVNL is the second largest equity holder of this SPV with 26% equity, the largest being Dighi Port. This is for the construction of a new 34 km railway line from Roha to Dighi Port in Maharashtra.
New SPVs being formed:
Indian Port Rail Corporation Limited (IRPCL):
RVNL is participating in the formation of IRPCL. This is a SPV under the Ministry of Shipping, with the stakeholders being RVNL and 12 major ports. The initial authorised capital of the SPV is Rs 500 crore with RVNL’s equity participation being Rs 10 crore only or 10% of the initial subscribed share capital.
The mandate of the SPV is to enhance rail connectivity to the various Ports in the country. This includes maintenance of Port Railways along with up-gradation, modernisation and capacity augmentation as and when required.
Rail connectivity to Rewas Port in Maharashtara:
Work undertaken by RVNL:
RVNL began as an organisation for executing various projects of railway engineering, to meet the shortfall of rail infrastructure that the existing system of that time could not fulfil. It was important to think out of the box and find a solution as eventually the price would be heavy with respect to the curtailment of opportunities and options available to a developing nation.
From beginning with railway capacity augmentation through track doubling, new railway lines, gauge conversion, railway electrification, RVNL has moved onto working on metro railways, multimodal transport system, port connectivity, turnkey projects i.e. workshops, training institutes, green buildings, high speed rail projects, cable stayed bridges, river and road bridges, vertical lift bridge, mountain Railways and tunnels.
Completed projects[2]
S. No. | Railway | Project Name | Type of Project | Length (km) |
1. | Central Railway | Diva - Kalyan 5th & 6th Line | Doubling | 11 |
2. | Central Railway | Pakni - Mohol Doubling | Doubling | 17 |
3. | Central Railway | Panvel - Jasai JNPT Doubling | Doubling | 28.5 |
4. | Central Railway | Pakni - Solapur Doubling | Doubling | 16.28 |
5. | Eastern Railway | Gurup - SaktigarhExtn of 3rd Line | Doubling | 26 |
6. | East Central Railway | Barauni - Tilrath Bypass Doubling | Doubling | 8.3 |
7. | East Coast Railway | Talcher-Cuttack-Paradeep Doubling with 2nd Bridge on Rivers Birupa& Mahanadi | Doubling | 3 |
8. | East Coast Railway | Jakhapura- Haridaspur 3rd Line | Doubling | 23.3 |
9. | East Coast Railway | Cuttack - Barang Doubling | Doubling | 14.3 |
10. | East Coast Railway | Rajatgarh-Barang Doubling | Doubling | 31.3 |
11. | East Coast Railway | Khurda-Barang - 3rd line (35 km) | Doubling | 32.32 |
12. | Northern Railway | New Delhi-Tilak Bridge- 5th & 6th line (2.65 km) | Doubling | 2.65 |
13. | North Central Railway | Palwal - Bhuteswar 3rd Line | Doubling | 81 |
14. | North Central Railway | Aligarh - Ghaziabad 3rd Line | Doubling | 106.1 |
15. | North Western Railway | Bhagat Ki Kothi - Luni Doubling | Doubling | 30.3 |
16. | North Western Railway | Karjoda - Palanpur Doubling | Doubling | 5.4 |
17. | North Western Railway | Rewari- Manheru Doubling | Doubling | 69.02 |
18. | North Western Railway | Rani-KeshavGanj Doubling | Doubling | 59.5 |
19. | North Western Railway | Abu Road-Sarotra Road- Patch doubling (23.12 km) | Doubling | 23.12 |
20. | North Western Railway | Swaruganj-Abu Road - Patch doubling (25.36 km) | Doubling | 25.36 |
21. | Southern Railway | Attipattu - Korukkupet 3rd Line | Doubling | 18 |
22. | Southern Railway | Pattabiram - Tiruvallur 4th Line &Tiruvallur - Arakkonam 3rd Line | Doubling | 41.89 |
23. | Southern Railway | Tiruvallur - Arakkonam 4th Line | Doubling | 28 |
24. | Southern Railway | Villipuram-Dindigul Doubling | Doubling | 273 |
25. | Southern Railway | Thanjavur-Ponmalai - Doubling | Doubling | 46.96 |
26. | South Central Railway | Pullampet - BalapallePh I of Gooty - Renigunta Doubling | Doubling | 41 |
27. | South Central Railway | Krishnapatnam - Venkatachalam Doubling with RE | Doubling | 16.5 |
28. | South Central Railway | Gooty - Renigunta Patch Doubling | Doubling | 151 |
29. | South Central Railway | Raichur - Guntakal Doubling | Doubling | 81.0 |
30. | South Central Railway | Guntur-Tenali-Doubling with electrification (24.38 km) | Doubling | 25 |
31. | South Eastern Railway | Tikiapara - Santragachi Doubling | Doubling | 5.6 |
32. | South Eastern Railway | Panskura - Kharagpur 3rd Line | Doubling | 45 |
33. | South Eastern Railway | Panskura - HaldiaPh 1 Doubling | Doubling | 14 |
34. | South Eastern Railway | Rajgoda - Tamluk (Jn. Cabin) Doubling | Doubling | 13.5 |
35. | South Eastern Railway | Tamluk Jn. Cabin – BasulyaSutahata Doubling | Doubling | 24.23 |
36. | South Eastern Railway | Goelkera-Monoharpur 3rd line (40 km) | Doubling | 27.5 |
37. | South East Central Railway | Bilaspur - Urkura 3rd Line Doubling | Doubling | 105 |
38. | South East Central Railway | Salka Road- Khongsara Patch Doubling | Doubling | 26 |
39. | South East Central Railway | Khodri-Anuppur, with Flyover at Bilaspur (61.6 km) | Doubling | 61.6 |
40. | South Western Railway | Hospet - Guntakal Doubling | Doubling | 115 |
41. | West Central Railway | Bhopal-Bina - 3rd line (143 km) | Doubling | 144.3 |
42. | West Central Railway | Itarsi-Budni - 3rd line (25.090 km) | Doubling | 25.09 |
43. | North Western Railway | Delhi - Rewari Gauge Conversion | GC | 94.2 |
44. | North Western Railway | Ajmer - Phulera - Ringus - Rewari Gauge Conversion | GC | 295 |
45. | North Western Railway | Bhildi - Samdari Gauge Conversion | GC | 223 |
46. | Southern Railway | Thanjavur - Villupuram Gauge Conversion | GC | 192 |
47. | Southern Railway | Cuddalore - Salem Gauge Conversion | GC | 193 |
48. | South Western Railway | Arasikere-Hassan-Mangalore Gauge Conversion | GC | 230 |
49. | Western Railway | Bharuch - Samni - Dahej Gauge Conversion | GC | 62 |
50. | Western Railway | Gandhidham - Palanpur Gauge Conversion | GC | 301 |
51. | East Coast Railway | Daitari - Banspani New Line | NL | 155 |
52. | East Coast Railway | Haridaspur-Paradeep (82 km) | New Line | 82 |
53. | South Central Railway | Obulavaripalle- Krishnapattnam (113 km) | New Line | 121 |
54. | Southern Railway | Vallarpadam - Idapally New Line | NL | 9 |
55. | Railway Electrification | Tomka -Banspani – RE | RE | 144 |
56. | Railway Electrification | Kharagpur (Nimpura) - Bhubaneswar Including Branch Line of Talcher - Cuttack - Paradeep | RE | 581 |
57. | Railway Electrification | Bhubaneswar - Kottavalasa | RE | 417 |
58. | Railway Electrification | Daund-Manmad Incl. Puntamba- Shirdi - RE | RE | 255 |
59. | Railway Electrification | Reningunta - Guntakal RE | RE | 308 |
60. | Railway Electrification | Yelahanka - Dharmavaram - Gooty RE | RE | 306 |
61. | Railway Electrification | Bharuch - Samni - Dahej RE | RE | 64 |
62. | Railway Electrification | Manheru- Hissar RE | RE | 74 |
63. | Railway Electrification | Jakhal - Hisar (79 km) | RE | 80.0 |
64. | Railway Electrification | Chhapra-Ballia-Ghazipur-Varanasi-Allahabad RE (330 rkm) | RE | 330 |
65. | Railway Electrification | Guntakal-Kalluru RE (40 rkm) | RE | 40 |
66. | Railway Electrification | Utretia - Rae Bareli - Amethi - Janghai RE (214 rkm) | RE | 214 |
67. | Railway Electrification | Daund-Baramati (44 rkm) | RE | 44 |
68. | Railway Electrification | Amla-Chhindwara-Kalumna | RE | 257 |
69. | Railway Electrification | Raipur-Titlagarh (203 rkm) {Part of Vizianagaram - Rayagada - Titlagarh - Raipur (465 rkm)} | RE | 203 |
70. | Railway Electrification | Rajpura - Dhuri - LehraMohabat (151 km) | RE | 151 |
71. | Railway Electrification | Guntakal - Bellary - Hospet incl. Tornagallu - Ranjitpura Branch Line (138 rkm) | RE | 138 |
72. | Railway Electrification | Wani- Pimpalkutti RE (66 rkm) | RE | 66 |
73. | Railway Electrification | Manoharabad- Medchal (14 km) | RE | 14 |
74. | Railway Electrification | Yalahanka-Penukonda (120.55 km)-Doubling | RE | - |
75. | Eastern Railway | Civil Engineering Works in Connection with Diesel Loco Component Factory, Dankuni | WKSP | - |
76. | Eastern Railway | Dankuni - Setting Up of Electric Loco Assembly and Ancillary Unit of CLW | WKSP | - |
77. | East Central Railway | Barauni - 250 High Horse Power Loco Shed | WKSP | - |
78. | East Coast Railway | Vadlapudi- Wagon PoH Workshop of 200 Nos Capacity Near Duvvada Station | WKSP | - |
79. | South Eastern Railway | Setting Up of Diesel Multiple Unit (DMU) Manufacturing Factory at Sankrail/ Haldia | WKSP | - |
80. | DLW | Varanasi - Augmentation of Production Capacity from 200 To 250 High HP Locos Per Year | WKSP | - |
81. | North Eastern Railway | Aunrihar - DEMU Shed | WKSP | |
82. | South Central Railway | Workshop for Manufacture of Flat Bogies for LHB Design Coaches, Yadgir | WKSP | - |
83. | Eastern Railway | Barddhaman Yard - 4-lane road over bridge in lieu of 2-lane road over bridge No. 213 | ROB | - |
84. | Southern Railway | Srirangam-Tiruchchirapalli Town - 4-lane road over bridge in lieu of 2- lane bridge No.380-A | ROB | - |
85. | North Western Railway | IOC Siding at Salawas (Deposit Work) | Others | 2.82 |
86. | South Central Railway | Secunderabad- Upgradation of facilities at Centralised Training Academy for Railway Accounts | TRG | - |
87. | South Central Railway | Moula Ali - Setting Up of Indian Railway Institute of Finance Management | TRG | - |
88. | North Western Railway | Madar - Palanpur - Removing of PSR (Kms 589/1 to 590/1) | Track Renewal | - |
89. | North Central Railway | Jhansi-Garhmau, Orai-Ata, Ata-Kalpi&Pokhrayan- Lalpur - Splitting of longer block sections | TF | - |
90. | North Central Railway | Paman-Bhimsen - New B-class station | TF | - |
91. | Western Railway | Sabarmati-Botad-subways in lieu of level crossing-23 Nos. | RSW | - |
92. | Western Railway | Sabarmati-Botad-Subways in lieu of LCs-14 Nos. | RSW | - |
Ongoing projects
- Kolkata Metro Line 3
- Diyodar-Dhanakwara-Jasali double line project
- Yavatmal-Nanded New line
- Lucknow – Pilibhit Via Sitapur, Lakhimpur Gc[4]
Wagon Periodic Overhauling Workshop, Visakhapatnam,Andhra Pardesh
- Gudur - Bitragunta 3rd Line Project
See also
- High Speed Rail Corporation of India Limited (HSRC) has been formed as a wholly owned subsidiary of RVNL with the approval of the President of India to develop high speed rail corridors in India. This is to run passenger trains at the speed of 350km/hr.
References
- "Balance Sheet 31.03.2019".
- "17th Annual Report" (PDF). rvnl.org.
- "Rail Vikas Nigam Limited - RVNL | Indian Railway Corporate Site". pnr.meramaal.
- "LUCKNOW- PILIBHIT VIA SITAPUR, LAKHIMPUR GC". rvnl.org.