Pune Suburban Railway
Pune Suburban Railway, also known as Pune Local, is a suburban rail system connecting Pune to its suburbs and neighboring villages in Pune District, Maharashtra. It is operated by Central Railway (CR). The system operates on two routes, Pune Junction–Lonavala and its part Pune Junction–Talegaon. 18 trains operate on Pune Junction–Lonavala route and 5 trains operate on Pune Junction–Talegaon route.[1] Also, DEMU trains operate on Pune Junction–Daund–Baramati route.
An EMU at the Pune Junction | |
Overview | |
---|---|
Locale | Pune district, Maharashtra |
Transit type | Suburban Rail |
Number of lines | 2 |
Number of stations | 17 |
Daily ridership | 1,00,000 |
Operation | |
Operator(s) | Central Railway (CR) |
Technical | |
System length | 63 kilometres (39 mi) |
Track gauge | 1,676 mm (5 ft 6 in) (broad gauge) |
History
The 9-car services were operated till March 2009, when 12-car services were introduced.[2] 13 car trains are also operated.[3]
Services
Stations
Note: Stations in Bold are origin / terminating stations
Pune–Lonavala service
Pune–Lonavala Pune Suburban Railway System | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Train number | Departure | Arrival | Frequency | Origin |
---|---|---|---|---|
99802 | 00:10 | 01:50 | Daily | Pune |
99804 | 04:45 | 06:05 | Daily | Pune |
99806 | 05:45 | 07:05 | Daily | Pune |
99808 | 06:30 | 07:50 | Daily | Pune |
99810 | 08:05 | 09:25 | Daily | Pune |
99812 | 09:55 | 11:15 | Daily | Pune |
99814 | 11:20 | 12:35 | Daily | Shivajinagar |
99816 | 12:15 | 13:50 | Daily | Pune |
99818 | 13:00 | 14:20 | Daily | Pune |
99820 | 15:00 | 16:40 | Daily | Pune |
99822 | 16:25 | 17:45 | Daily | Pune |
99824 | 17:15 | 18:40 | Daily. | Pune |
99826 | 18:02 | 19:27 | Daily | Pune |
99828 | 19:05 | 20:25 | Daily | Pune |
99830 | 20:05 | 21:25 | Daily | Pune |
99832 | 20:35 | 21:50 | Daily | Shivajinagar |
99834 | 20:57 | 22:17 | Daily | Pune |
99836 | 22:10 | 23:30 | Daily | Pune |
Lonavala–Pune service
Train Number | Departure | Arrival | Frequency | Destination |
---|---|---|---|---|
99801 | 05:20 | 06:40 | Daily | Pune |
99803 | 06:30 | 07:50 | Daily | Pune |
99805 | 07:30 | 08:50 | Daily | Pune |
99807 | 08:20 | 09:45 | Daily | Pune |
99809 | 10:10 | 11:55 | Daily | Pune |
99811 | 11:30 | 12:50 | Daily | Pune |
99813 | 14:00 | 15:20 | Daily | Pune |
99815 | 14:55 | 16:15 | Daily | Pune |
99817 | 15:45 | 17:05 | Daily | Pune |
99819 | 17:25 | 18:45 | Daily | Pune |
99821 | 18:20 | 19:40 | Daily | Pune |
99823 | 19:00 | 20:25 | Daily | Shivajinagar |
99825 | 19:35 | 20:55 | Daily | Pune |
99827 | 20:40 | 22:00 | Daily | Pune |
99829 | 21:35 | 22:55 | Daily | Pune |
99831 | 22:05 | 23:25 | Daily | Pune |
99833 | 22:33 | 00:20 | Daily | Pune |
99835 | 23:40 | 01:35 | Daily | Pune |
Pune–Talegaon service
Train number | Departure | Arrival | Frequency | Origin |
---|---|---|---|---|
99902 | 06:50 | 07:40 | Daily | Pune |
99904 | 08:57 | 09:47 | Daily | Pune |
99906 | 15:40 | 16:30 | Daily | Pune |
99908 | 23:00 | 23:50 | Daily | Pune |
Talegaon–Pune service
Train umber | Departure | Arrival | Frequency | Destination |
---|---|---|---|---|
99901 | 00:05 | 01:10 | Daily | Pune |
99903 | 07:50 | 08:40 | Daily | Pune |
99905 | 09:57 | 10:40 | Daily | Shivajinagar |
99907 | 16:50 | 17:32 | Daily | Pune |
Pune–Daund–Baramati DEMU
Pune–Daund–Baramati Pune Suburban Railway System | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
This section was electrified in 2017, but is currently served by DEMUs only. Since March 2017, three DEMUs have started to operate on Pune–Daund route and one DEMU on Pune–Baramati route. Two DEMUs operate on Daund–Baramati route.[4] There are plans to start EMU services on this section.
- Stations
Proposed plans
According to the 2010-11 Budget, rail proposals were as follows:
- To build separate platforms for Pune–Lonavala/Talegaon services and increase the frequency to 30 min during peak hours and 45 min other time.[5]
- Introduction of shuttle service on Pune–Saswad Road–Jejuri/Satara Sector. This will operate every 3 hours with 2/3 wagons for goods.
- Third track for Pune–Lonavala section.[6] (Demand survey accepted in Budget 2011-12)
- To increase two terminals on Pune–Lonavala and Pune–Daund sections.
- To start suburban service on Pune–Rajgurunagar station (Proposed) patch after completion of Pune– Nasik Road, railway for connectivity with New Pune International Airport.
A new EMU terminal is proposed to be built on west of the existing station. It will have two lines and three platforms. This proposal includes:[7]
- Extension of existing platforms to accommodate 24 bogie trains.
- A new terminal for EMU to accommodate 15 bogie trains.
- Three foot over-bridge to connect new terminal to other platforms.
- Expansion of Hadapsar for new trains to origin and terminate at the station.
See also
References
- New trains from Pune and change in suburban service for administration by central railways
- "Railways need more time to run 13-coach suburban locals". The Times of India. 3 November 2012. Retrieved 23 September 2014.
- Umbrajkar, Manish (12 March 2013). "Pune-Lonavla EMU train service completes 35 years". The Times of India. Retrieved 23 September 2014.
- PUNE-DAUND LOCAL BRINGS RESPITE FOR DAILY COMMUTERS
- Hope swells in suburban train users
- Survey may lead to better frequency of local trains
- Pune railway division proposes new EMU terminal