Rail transport in Finland

The Finnish railway network consists of a total track length of 9,216 km (5,727 mi) of railways built with 1,524 mm (5 ft) Old Russian gauge track having electrified track length of 3,249 km (2,019 mi). Passenger trains are operated by the state-owned VR which covers track length of 7,225 km (4,489 mi). They serve all the major cities and many rural areas, though railway connections are available to fewer places than bus connections. Most passenger train services originate or terminate at Helsinki Central railway station, and a large proportion of the passenger rail network radiates out of Helsinki. VR also operates freight services. Maintenance and construction of the railway network itself is the responsibility of the Finnish Rail Administration, which is a part of the Finnish Transport Agency (Finnish: Väylävirasto). The network is divided in six areal centres, that manage the use and maintenance of the routes in co-operation. Cargo yards and large stations may have their own signalling systems.

Rail transport in Finland
Operation
National railwayVR
Infrastructure companyFinnish Transport Agency
Statistics
Ridership14.9 million / year long-distance
77.9 million / year in Helsinki commuter traffic[1]
System length
Total9,216 km (5,727 mi)
Electrified3,249 km (2,019 mi)
Track gauge
Main1,524 mm (5 ft)
Electrification
Main25 kV 50 Hz AC overhead wiring
Features
Longest tunnelSavio, 13.5 km (8.4 mi)[2]
Map
The Finnish railway network in 2010. Lines marked in green are freight- and passenger routes, brown are freight-only routes, blue is heritage railway, and grey are no longer in use.

Finnish trains have a reputation for being spacious, comfortable and clean. The scenery surrounding the railway lines is considered to be of outstanding natural beauty, especially in Eastern Finland with its many lakes. Because in most parts of Finland the density of population is low, Finland is not very well suited for railways. Commuter services are nowadays rare outside the Helsinki area, but there are express train connections between most of the cities. As in France, passenger services are mostly connections from various parts of the country to the capital, Helsinki. Currently there are c. 260 passenger round trips driven daily in Finland, excluding Helsinki commuter rail. Nightly passenger trains only operate on the busiest lines between Helsinki or Turku via Oulu to Lapland (minimum distance of 676 km (420 mi). This leaves most of the tracks free for nightly freight traffic (c.40 M tons/y). In addition there are also good long distance bus and airplane connections, both of which are generally little or a lot more expensive than trains. Buses are sometimes faster and/or cheaper than trains (e.g. Helsinki–Pori).

History

The Finland Railway Bridge across the Neva connected the Finnish State Railways to Russian Railways.

The first rail line between Helsinki and Hämeenlinna was opened on January 31, 1862. As Finland was then the Grand Duchy of Finland, a region of Imperial Russia, railways were built to the broad Russian track gauge of 1,524 mm (5 ft). An extension from Riihimäki to the new Finland Station in Saint Petersburg was opened in 1870. However, the Finnish and Russian rail systems remained unconnected until 1912. Russian trains could not have used the Finnish rail network due to a narrower load gauge. Later the Finnish load gauge was widened to match the Russian load gauge, with hundreds of station platforms or tracks moved further apart from each other.

Further expansion occurred in the 1800s and by 1900 much of the network had been constructed with 3,300 km of track built.

The Finland Railway Bridge across the River Neva in Saint Petersburg, opened in 1912, connected the Finnish State Railways to Russian Railways. Following Finnish independence, the Russian part of the line was handed over to Russian authorities.

Future expansion

Track upgrades

Track doubling projects are taking place in various sections of the Finnish rail network. Following a previous project to double the single-line sections of railway from Seinäjoki to Oulu which was completed in 2017,[3] the Luumäki-Imatra(-Simpele) section will be fully doubled by 2023.[4]

New lines

Since the 1970s the Finnish Transport Agency has been discussing the possibility of building a Helsinki–Turku high-speed railway, allowing for a faster journey time between the two cities. An updated feasibility study was undertaken in 2005, and in 2016 the line was included as a policy in the Finnish Transport Agency's report.[5] This line forms part of the Finnish government's plans to build high-speed rail links from Helsinki to Turku, Tampere and Kouvola.

The planned Itärata (East Rail) would link Helsinki and Kouvola via Porvoo, shortening journey times to eastern Finnish cities such as Kuopio and Joensuu, along with St Petersburg, Russia. More direct lines from Helsinki to Pori[6] and Jyväskylä[7] have also been studied.

In November 2017 a freight train left Kouvola between Helsinki and the Russian border carrying 41 containers for Xi’an in China. This was the first freight train of its type to travel between the two countries.[8] The 9,110 km journey via Russia and Kazakhstan is expected to take 17 days, compared to around 30 days by sea and rail. This service is expected to become a daily departure in the coming months.

Proposals for a rail link to Lapland in northern Finland, via Kemijärvi or Kolari, from the Norwegian port of Kirkenes are in the planning stages.[9] However, environmental and cultural sensitivities exist which affect these plans, with concerns from the indigenous Sámi people that the proposed line would pass through reindeer grazing lands.[10]

Also, new rail link from Simpele to Elisenvaara, with track doubling and electrification at 25 kV 50 Hz AC from Elisenvaara via Sortavala and Suoyarvi to Petrozavodsk is now proposed, for passenger trains (with Finnish bilevel coaches) from Helsinki to Petrozavodsk, Kirov, Krasnoyarsk, and Khabarovsk (via Baikal-Amur Mainline).

Operators

The national railway company VR has a monopoly on passenger transport. In Helsinki local traffic, class Sm5 EMUs are owned by Pääkaupunkiseudun Junakalusto Oy, but are operated by VR. The new class Sm6 Allegro trains are owned and operated by Karelian Trains, a 50/50 joint venture of VR and Russian railway company RZD. The trains are operated by VR personnel while on Finnish soil.

While private rail operators can transport freight since 2007, most trains are still run by VR. Ratarahti Oy was granted its safety certificate by the Finnish Transport Safety Agency in September 2011[11] and it will start shunting work at the Imatra rail yard in 2013, with first test runs on 5 December 2012.[12] Proxion Train Oy received its safety certificate in May 2011[13] and is set to start freight traffic in 2014 after problems with acquiring used equipment from VR.[14] Another new operator, Fenniarail, has found used locomotives in Czech Republic which are convertible to broad gauge, in operation 2016.

VR prefers scrapping unneeded rolling stock rather than selling them, in order to limit competition. Used vehicles can't be imported from other countries because of a different rail gauge which vehicles normally can't be converted to. Used vehicles from former Soviet union do not fulfil Finnish regulations. New locomotives are too expensive since they are not constructed for broad gauge.[15]

One private railway company exists in Finland, the Karhula–Sunila Railroad, a short branch line with freight traffic only, in Karhula, near Kotka. The branch line is not managed by the Finnish Transport Authority, but by the railway owner.

Several museum railways exist that are unrelated to VR Group.

Technical facts

Rail network size

  • Total track length including sidings 9,216 km (5,727 mi)
  • Total length of passenger railway routes 7,225 km (4,489 mi)
  • Electrified routes 3,249 km (2,019 mi)

Electrification

Electrification on the Finnish rail network as of 2011. Electrified lines shown in blue. The lines Seinäjoki–Vaasa and Rovaniemi–Kemijärvi have since been electrified.

While some private Finnish railways were electrified already at the end of the 19th century, work on the electrification of the main rail network started only in the late 1960s.[16] Most main lines are now electrified. The system used is 25 kV 50 Hz AC overhead wiring,[17] with wire height normal at 6.5 m (21 ft) and varying from 5.6 m (18 ft) beyond 6.5 m (21 ft) to 7.3 m (24 ft).[18] The largest class of electric locomotives are the Sr1 locomotives that were taken into use in 1973.[19] They are now supplemented by the Sr2- and Sr3-class electric locomotives and the high-speed Sm3 Pendolino units.

The first electric trains started to operate on 26 January 1969 in Helsinki local traffic, initially between Helsinki and Kirkkonummi and slowly extending to Riihimäki on 31 January 1972.[19] Heading northwards, the electric wires reached Seinäjoki in 1975, Kokkola in 1981, Oulu in 1983, Rovaniemi in 2004, and their current northernmost point in Kemijärvi in 2014.[20] In addition to the line to Kemijärvi, another line recently electrified was the line from Seinäjoki to Vaasa in 2011.[21]

The next railway line to be electrified is the railway from Turku to Uusikaupunki, electrification is scheduled to begin in 2019.[22]

Running speeds

Running speeds on the Finnish railway network at the start of the year 2011.

The maximum speed for passenger traffic is 220 km/h (140 mph),[18] but is achieved only on the Kerava–Lahti railway line. Freight trains have a maximum speed of 120 km/h (75 mph).[18] Actual speed limits vary depending on the train type and track portion.[23] Some delays can occur in autumn and winter due to weather conditions (e.g. high winds).

Safety

The signalling system used on the railway network in Finland comprises color-light signals and fixed signs. They are used together with ATP-VR/RHK (EBICAB 900), a train protection system usually referred to as JKV (Finnish: junien kulunvalvonta) which has to be used on rolling stock.[24][25] The system is set to be upgraded to ERTMS/ETCS in the upcoming years, however later than in other European countries due to the low age of the current train protection system.[26] The first ETCS units are set to be installed in rolling stock during 2013, and the first ERTMS signalled portion of track should be opened between 2019 and 2025.[27]

Platform heights

Platform height 550mm above rail
  • Helsinki - Hämeelinna - Tampere
  • Helsinki - Turku
  • Kerava - Lahti - Kouvola - Vainikkala (except Luumäki)
Platform height 200mm above rail
  • The remainder of the stations

Lines

Most passenger rail services in Finland radiate from Helsinki Central, serving most major cities including Tampere, Turku, Oulu, Rovaniemi, Kouvola, Kuopio, Jyväskylä and Joensuu among others. Some towns are connected to the rail network by their own branch lines, yet are not served by passenger trains; examples include Porvoo, Uusikaupunki, Raahe and Rauma.

  • Same gauge 1,524 mm (5 ft)
    • Russia – small break of gauge 1,524 mm (5 ft)/1,520 mm (4 ft 11 2732 in). This is within the tolerances and through running is done.
      • Vainikkala – Buslovskaya — electrified, but different voltage 25 kV AC – 3 kV DC
      • Niirala – Vyartsilya — electrification missing
      • Imatrankoski – Svetogorsk — electrification missing
      • Vartius – Kostomuksha — electrified on Finnish side only — Russian side to be electrified at 25 kV 50 Hz AC in 2018–2019.
  • Break of gauge
  • Proposed
    • Estonia – proposed Helsinki to Tallinn Tunnel, which would be part of the Rail Baltica project. According to the public information available, tracks in the tunnel would use 1,435 mm (4 ft 8 12 in) standard gauge, and it looks like Finland will extend this gauge on its territory as far as deemed reasonable - for example to Helsinki central station and airport, but requiring dual gauge tracks from Muuga Port through the tunnel to Helsinki central station and airport, and standard gauge electric locomotives and multiple units needs pantographs to suit for higher-than-standard (more than 6.5m above rails) overhead wires. Recently announced ARJ Holdings of Dubai will provide external funding with construction expected to begin in 2020.
    • Norway – proposed railway line via Skibotn to Tromsø.[28]
    • Russia – proposed railway lines from Kemijärvi to Kandalaksha, from Imatra to Elisenvaara, from Parikkala to Elisenvaara, from Parikkala to Sortavala, from Joensuu to Medvezhyegorsk, from Hirvakoski to Kem, and from Kuusamo to Louhi.
    • Sweden – proposed railway line from Vaasa to Tornio via Umeå, Luleå and Haparanda.

Russia is the most important adjacent country regarding railway traffic. The freight traffic is much more intensive between Russia and Finland, compared to between Sweden and Finland. There are several daily passenger trains between Russia and Finland, but none between Sweden and Finland.

Metros, trams and light rail

See also

References

  1. "Growth continued in passenger traffic by rail in Finland in 2019". Statistics Finland. 27 August 2020. Retrieved 9 January 2021.
  2. Eero Holmila (13 September 2006). "Suomen pisimmän rautatietunnelin louhinta valmistui". Tekniikka & Talous. Retrieved 24 February 2011.
  3. "railway project Seinäjoki-Oulu". Väylä. Retrieved 10 June 2019.
  4. "Luumaki-Imatra railway project". Väylä. Retrieved 10 June 2019.
  5. http://yle.fi/uutiset/tunnin_junan_suunnittelu_sai_hallitukselta_rahaa/879055
  6. https://www.hameenliitto.fi/sites/default/files/dokumentit/Vaihemaakuntakaava/helsinki_forssa_pori_radan_esiselvitys.pdf Helsinki –Forssa – Pori - Hämeen liitto
  7. https://www.keskisuomi.fi/filebank/21935-Nopea_ratayhteys_Jkl-Hki_raportti.pdf Nopea ratayhteys Jyväskylästä Helsinkiin, Alustava tarveselvitys 3/2011 - Keski-Suomen liitto
  8. https://www.railpage.com.au/news/s/finland-to-china-freight-service-launched
  9. "Finland-Norway rail link planned to fit Arctic sea routes". Reuters. 9 May 2019.
  10. "Environmentalists and Sámi politicians hit out at new Arctic railway proposal". News Now Finland. 12 May 2019.
  11. "Trafi myönsi toiselle uudelle rautatieliikenteen harjoittajalle turvallisuustodistuksen" (in Finnish). Finnish Transport Safety Agency. 20 September 2011. Retrieved 2 January 2013.
  12. Nummelin, Markku (December 2012). "Tasoristeys". Resiina (in Finnish). Museorautatieyhdistys ry, Suomen Rautatiehistoriallinen Seura ry (180): 40. ISSN 0356-0600.
  13. "Trafi myönsi uudelle rautatieliikenteen harjoittajalle turvallisuustodistuksen" (in Finnish). Finnish Transport Safety Agency. 26 May 2011. Retrieved 2 January 2013.
  14. Nummelin, Markku (December 2012). "Tasoristeys". Resiina (in Finnish). Museorautatieyhdistys ry, Suomen Rautatiehistoriallinen Seura ry (180): 42. ISSN 0356-0600.
  15. Finland; Kolaritågen. (Bildserie) pgr (in Swedish)
  16. Alameri 1979, p. 24.
  17. Alameri 1979, p. 25.
  18. RHK 2009, p. 22.
  19. Alameri 1979, p. 26.
  20. "Electrification of the railway between Rovaniemi and Kemijärvi" (in Finnish). Liikennevirasto (Finnish Transport Agency). Retrieved 29 March 2014.
  21. "Electrified lines" (PDF). Finnish Railway Statistics 2012. Finnish Transport Agency. Retrieved 7 January 2013.
  22. https://yle.fi/uutiset/3-10035535
  23. RHK 2009, Appendix 6.
  24. RHK 2009, p. 24.
  25. Kymäläinen 2010, p. 16.
  26. Kymäläinen 2010, p. 22.
  27. Kymäläinen 2010, p. 23.