Serpong–Balaraja Toll Road
The Serpong-Balaraja Toll road is extended from the Jakarta–Serpong Toll Road. This toll road connects Serpong with Tangerang Regency, and will provide access from Serpong to Merak[1]. The length of this toll road is 31 kilometers. The toll road will be connected to the Tangerang-Merak Toll Road and Jakarta-Serpong Toll Road. Serpong-Balaraja Toll Road is planned to be built in mid-2015 and was targeted for completion in early 2018[2][3]. But due to land acquisition problem the physical construction of the toll road didn't started as of September, 2018.[4]
Serpong–Balaraja Toll Road | |
---|---|
Route information | |
Maintained by Trans Bumi Serbaraja | |
Length | 31 km (19 mi) |
Existed | (under construction)–present |
Major junctions | |
From | Jakarta–Serpong Toll Road |
Jakarta–Serpong Toll Road Tangerang–Merak Toll Road | |
To | Balaraja IC |
Location | |
Major cities | South Tangerang, Tangerang Regency |
Highway system | |
Roads and Highways in Indonesia |
Building stages
- Stage 1: Serpong–Legok (11 km)
- Stage 2: Legok–Citra Raya (8 km)
- Stage 3: Citra Raya–Balaraja (12 km)
Planned toll gate
- BSD City 1 (AEON Mall)
- BSD City 2 (Kws. Industri)
- BSD City 3 (Residential)
- Legok
- Citraraya
- Balaraja
References
- "Sinar Mas Land Secures Vital Financing for Serpong-Balaraja Toll Road". Jakarta Globe. Retrieved 28 June 2019.
- "BSD Matches Rival Offer to Win $439m Serpong-Balaraja Toll Road Project". Jakarta Globe. Retrieved 28 June 2019.
- "BSD to finalize Rp 4t loan for Serpong-Balaraja toll road". The Jakarta Post. Retrieved 28 June 2019.
- "Pembangunan Jalan Tol Serpong-Balaraja Akan Dimulai Awal 2019". Tribun News. Retrieved 28 June 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.