Batang-Semarang Toll Road
Batang-Semarang Toll Road is a 75 kilometers long highway that connects Batang area with Semarang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java.[1] The toll road is operational since 2018.[2]
Batang-Semarang Toll Road | |
---|---|
Route information | |
Part of | |
Maintained by PT Jasamarga Semarang Batang (PT Jasa Marga Tbk and PT Waskita Toll Road (Waskita Karya)) | |
Length | 75 km (47 mi) |
Major junctions | |
From | Batang |
Pemalang-Batang Toll Road Semarang Toll Road | |
To | Semarang |
Location | |
Major cities | Pekalongan, Semarang, Kendal |
Highway system | |
Roads and Highways in Indonesia
|
Sections
Until November 2017, its construction progress is at 55.7 percent.[3][4] The construction of this toll road is divided into 5 sections:
- Section I, beginning of project - East Batang (3.2 km)
- Section II, East Batang - Weleri (36.35 km)
- Section III, Weleri - Kendal (11.05 km)
- Section IV, Kendal - Kaliwungu (13.5 km)
- Section V, Kaliwungu - Krapyak (10.9 km)
References
- Inilah Pemenang Lelang Jalan Tol Batang-Semarang
- "Tol Batang-Semarang Bisa Dilewati Arus Mudik Lebaran 2018". Retrieved 23 December 2017.
- "Jalan Tol Batang - Semarang Selesai Akhir 2018". Retrieved 23 December 2017.
- "Batang and Balikpapan toll road projects accelerated". Retrieved 23 December 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.