Tangerang–Merak Toll Road

The Tangerang–Merak Toll Road (), also known as the Banten highway, is part of the Trans-Java toll road. It is the second toll road constructed in Indonesia, following the Jagorawi Toll Road in 1981. This highway connects Tangerang and the port of Merak on the north-western tip of Java, which further connects by ferry to Sumatra island. The road passes through Cikupa, Balaraja, Kragilan, Ciujung, Serang, Cilegon, and Merak.

Tangerang-Merak Toll Road
Banten Highway
Route information
Maintained by PT Marga Mandala Sakti dba Astra Infra Toll Road Tangerang-Merak
(Astra International)
Length72 km (45 mi)
Major junctions
East endCikupa IC
 Jakarta–Tangerang Toll Road
Jakarta Outer Ring Road 2
Serpong–Balaraja Toll Road (Planned)
West endMerak
Location
Major citiesTangerang Regency, Lebak Regency, Serang, Cilegon
Highway system
Roads and Highways in Indonesia

Further investment is underway. In mid-2012, the toll road operator, PT Marga Mandala Sakti, recently acquired by Astra International Tbk, said that construction of all parts of the road to connect with the port of Merak was almost complete.[1]

Payment

The fee for this road can be paid using e-toll

Fee

RouteGol. 1Gol. 2Gol. 3Gol. 4Gol. 5
Cikupa - Cikupa
Serang Timur - Serang Barat
2,504,004,506,007,00
Cilegon Timur–Cilegon Barat4,005,506,508,5010,50
Serang Barat–Cilegon Timur5,006,508,0010,5012,50
Cikupa–Balaraja Timur5,007,008,5011,0013,00
Cilegon Timur–Merak5,508,009,5012,5015,00
Ciujung–Serang Timur6,008,5010,0013,0016,00
Cikupa–Balaraja Barat6,509,0010,5014,0016,50
Serang Timur–Cilegon Timur7,5010,5012,5016,5019,50
Ciujung–Serang Barat
Serang Barat - Cilegon Barat
9,0012,0014,5019,0023,00
Balaraja Barat–Ciujung10,5014,5017,0022,5027,00
Serang Barat–Merak11,5014,5017,5023,0027,50
Serang Timur–Cilegon Barat11,5016,0019,0025,0030,00
Serang Timur–Merak13,0018,5021,5028,5034,50
Ciujung–Cilegon Timur13,5019,0022,5029,5035,50
Balaraja Barat–Serang Timur16,5023,0027,0035,5043,00
Cikupa–Ciujung16,5023,0027,5036,0043,50
Ciujung–Cilegon Barat17,5024,5029,0038,0046,00
Balaraja Barat–Serang Barat19,0026,5031,5041,5050,00
Ciujung–Merak19,5027,0032,0042,0050,50
Cikupa–Serang Timur23,0031,5037,5049,5059,50
Balaraja Barat–Cilegon Timur24,0033,5039,5052,0062,50
Cikupa–Serang Barat25,0035,5042,0055,0066,50
Balaraja Barat–Cilegon Barat28,0038,5046,0060,5073,00
Balaraja Barat–Merak29,5041,0049,0064,0077,50
Cikupa–Cilegon Timur30,5042,0050,0065,5079,00
Cikupa–Cilegon Barat34,5047,5056,5074,5089,50
Cikupa–Merak36,0050,0059,5078,0094,00

Exits

Toll GateKMDestination
Cikupa31Cikupa
Pasar Kemis
Cikande (planned)52Cikande
Industrial Site (planned)
Ciujung60Ciujung
Kragilan
Serang Timur72Serang Timur
Banten Lama
Pandeglang
Serang Barat78Serang Barat
Kramatwatu
Cilegon Timur87Cilegon Timur
Bojonagara
Cilegon Barat95Cilegon Barat
Anyer
Carita
Merak98Merak Harbour

Elevated toll road section

To overcome floods of Ciujung River in kilometer 57 to 59 which happened in 2012 and 2013, the operator has planned to elevated the toll road certain section by 2.7 meter height above the existing toll road with prediction cost Rp.300 billion ($25 million) for 2.5 kilometer elevated toll road as Prof. Dr. Ir. Soedijatmo Toll Road (Soekarno–Hatta Toll Road).[2]