Jakarta Outer Ring Road 2
Jakarta Outer Ringroad 2 (Indonesian: Jalan Tol Lingkar Luar Jakarta 2) or JORR 2 is an under-construction toll road circling the Greater Jakarta area, running roughly parallel with the Jakarta Outer Ring Road (JORR 1) in Indonesia. This toll road will connect Soekarno-Hatta International Airport to Cilincing, crossing West Jakarta, Tangerang, South Tangerang, Depok, Bogor Regency, Bekasi Regency, Bekasi city and North Jakarta. It is expected to be able to relieve the traffic of other toll roads in the Greater Jakarta area.[1][2] As of December 2019, only 11,135 kilometers (Kunciran - Serpong) has been operated, targeted to be fully operational by end of 2020.[3]
JORR 2 Jakarta Outer Ring Road 2 | |
---|---|
Route information | |
Maintained by PT Jasa Marga Tbk through subsidiaries (predominantly) | |
Length | 110.4 km (68.6 mi) |
Major junctions | |
Northwest end | Soekarno–Hatta International Airport |
Depok-Antasari Toll Road (under construction) Jakarta–Cikampek Toll Road Jakarta–Serpong Toll Road Jakarta Inner Ring Road Jakarta–Tangerang Toll Road Jagorawi Toll Road | |
Northeast end | Cilincing |
Location | |
Major cities | Jakarta, Tangerang, Depok, Bekasi |
Highway system | |
Roads and Highways in Indonesia |
The length of this toll road is 110 kilometers which is divided into seven sections, being Cengkareng-Kunciran (14.9 km), Kunciran-Serpong (11.19 km), Serpong-Cinere (10.14 km), Cinere-Jagorawi-Cimanggis (14.64 km), Cimanggis-Cibitung (25.39 km), Cibitung-Cilincing (34 km), and access to Tanjung Priok (16.7 km).
Sections
JORR 2 is divided into several sections:[4]
Section | Length | Main Concession by | Remarks |
---|---|---|---|
Cengkareng-Batu Ceper-Kunciran | 14.1 km | PT Jasamarga Kunciran Cengkareng (Jasa Marga, CMS Works, Wijaya Karya, Nindya Karya, Istaka Karya) | 2012: Land acquisition, 2013: Construction, 2014: To be operated[5] Expected to be completed by August 2018.[6] |
Kunciran–Serpong | 11.2 km | PT Marga Trans Nusantara (Jasa Marga and Astra Infra) | Opened.[7] |
Serpong–Cinere (BSD-Depok) [8] | 10.1 km | PT Cinere Serpong Jaya (Jasa Marga, Waskita Karya, Jakpro) | July 2014: Construction, April 27 2015: To be operated[5] November 20, 2015: not operated yet |
Cinere-Jagorawi[9] | 14.6 km | PT Translingkar Kita Jaya (Kompas Gramedia Group and Jasa Marga) | |
Cimanggis-Cibitung[13] | 26 km | PT Cimanggis Cibitung Tollways | Under construction |
Cibitung-Cilincing[14] | 34 km | PT MTD CTP Expressways | Under construction |
Access to Tanjung Priok | 16.67 km | Hutama Karya | Operational since 2017.[15] |
Interchanges
See also
References
- "Tol JORR 2 Ditargetkan Beroperasi 2019, Memperlancar Mobilitas Komuter dan Memangkas Biaya Logistik". Tribun News. Retrieved 1 October 2018.
- "Tol JORR 2 Beroperasi 2019, Distribusi Diklaim Lebih Lancar". CNN Indonesia. Retrieved 1 October 2018.
- Anisa Indraini (December 6, 2019). "Diresmikan Jokowi, Tarif Tol Kunciran-Serpong Masih Dihitung".
- http://forum.tamanroyal.com/index.php?topic=591.0;wap2 Archived 2011-07-16 at the Wayback Machine
- "Dua Ruas Tol Segera Dibangun". Poskota News. January 20, 2012. Retrieved August 15, 2016.
- "Tol Kunciran-Cengkareng Akan Memudahkan Pengendara ke Bandara Soetta". Kompas. Retrieved 13 December 2017.
- Media, Kompas Cyber. "Dapat Kredit Sindikasi, Tol Kunciran-Serpong Dikebut Pengerjaannya". KOMPAS.com (in Indonesian). Retrieved 2019-12-16.
- "Uji Tol Serpong-Cinere Kuartal I-2010". economy.okezone.com. Jakarta. December 20, 2009. Retrieved August 15, 2016.
- "Archived copy". Archived from the original on 2011-07-13. Retrieved 2011-03-06.CS1 maint: archived copy as title (link)
- "Cinere-Jagorawi turnpike ready to roll". January 25, 2012.
- "Jalan Tol Cinere-Jagorawi Resmi Beroperasi". January 27, 2012.
- Liputan6.com (2019-09-27). "Siap-siap, Jalan Tol Cijago Seksi II Beroperasi Sabtu Dini Hari". liputan6.com (in Indonesian). Retrieved 2019-12-16.
- "Tol Cimanggis-Cibitung Lagi Dibangun, Yuk Intip Progresnya". Detik. Retrieved October 1, 2018.
- "Waskita Pastikan Tol Cibitung-Cilincing Beroperasi Tahun Depan". Kompas. Retrieved October 1, 2018.
- "Tanjung Priok toll road open to traffic". The Jakarta Post. Retrieved 1 October 2018.