Spa Road Junction rail crash

The Spa Road Junction rail crash was an accident on the British railway system which occurred during the peak evening rush hour of 8 January 1999 at Spa Road Junction in Bermondsey, in South East London.

Spa Road Junction rail crash
Class 411 unit 1602, which was involved in the crash, seen at Dover Priory in 2003
Details
Date8 January 1999
17:25
LocationSpa Road Junction
CountryEngland
LineSouth Eastern Main Line
OperatorConnex South Eastern
Thameslink
OwnerRailtrack
CauseSignal passed at danger caused by driver error
Statistics
Trains2
Passengers~300
Deaths0
Injured4
List of UK rail accidents by year

The incident

On a dark and wet evening, a Connex South Eastern train from Dover Priory to Charing Cross collided with a Thameslink train from Brighton to Bedford causing derailment to both trains. The accident resulted in no fatalities and four injuries.

The Thameslink train had been held at a danger (red) signal until the route was set for it to cross from the Brighton Main Line onto the London Bridge Up Loop Line,[1] and the signal then cleared. The Connex train, which was approaching from behind, passed a preliminary caution (double yellow) signal then a caution (yellow) signal and then a danger (red) signal. It continued for 283 metres (309 yards) past the red signal until the point where the two lines converged. It was travelling at an estimated speed of 39 mph (63 km/h) when it collided with the Thameslink train which was estimated to be travelling at around 31 mph (50 km/h). Both trains were derailed and damage was caused to most of the carriages.

Disruption was caused to other rail services, although trains continued to run past the accident site on the Cannon Street lines. The emergency services struggled to access the accident scene but eventually 282 people were evacuated from these two trains. Some 200 people from another train a short distance behind (Connex South Central service from London Bridge to Guildford train) were initially left unsupervised, and had to find their own way to evacuate themselves in the inclement weather. Some were evacuated via the disused Spa Road railway station buildings,[2] the former terminus of the South East & Chatham Railway. Trains were still running on the south eastern side, some 30 to 40 ft (9 to 12 m) away from passengers evacuating the Guildford bound train.

The driver of the Connex train had already passed a signal at danger without authority on a previous occasion, and was still under special supervision because of this. Following the accident, he was permanently removed from driving duties.

There was no history of previous Category A SPADs at this signal.

Junction layout

Spa Road Junction is a busy ladder-crossover, located a short distance south east of London Bridge station. It controls the crossing movements to and from London Bridge (High Level) station, and at the time of the collision in 1999 the line configuration was:[3]

  • Line 1 Down (from Cannon Street via London Bridge)
  • Line 2 Reversible (to/from Cannon Street via London Bridge)
  • Line 3 Up (to Cannon Street via London Bridge)
  • Line 4 Down (from Charing Cross via London Bridge)
  • Line 5 Down (from Charing Cross via London Bridge)
  • Line 6 Up (To Charing Cross via London Bridge)
  • Line 7 Up Passenger Loop (To Charing Cross via London Bridge or Platform Avoiding loop)

Infrastructure

All signals in the vicinity of Spa Road junction are 4 aspect colour light signals. The signalling method is Track circuit Block, controlled by London Bridge signalling centre which is located nearby, adjacent to platform 16 at London Bridge station.

The collision point

The Thameslink train was approaching London Bridge from New Cross Gate on the Up Fast line of the Brighton Main Line, and had been signalled to cross on to the Up Passenger Loop of the South Eastern Main Line at Spa Road junction.[4] The Connex South Eastern train was approaching Spa Road from New Cross and had received the correct signalling sequence of a Preliminary Caution (two yellow aspect signal) and Caution (single yellow aspect signal) prior to L154 (the signal protecting the junction) being at Danger. However the driver did not respond to the signals and failed stop his train at the Danger signal, continuing until his train collided with the Thameslink train at the trailing points.

Rolling stock

The Thameslink train was an eight-coach train consisting of two Class 319 four-coach electric multiple units (EMUs).

The Connex South Eastern was also an eight-coach train consisting of a four-coach Class 411 (411602) EMU and a four-coach Class 423 EMU. The class 411 unit was repaired at Eastleigh Works and became the only class 411 EMU in Connex livery as a result.

Investigation

AWS "Sunflower" indicator showing caution

The Health and Safety Executive (HSE) concluded that the accident was caused by the Connex train passing a signal at danger (red). The HSE concluded that this was probably due to human error as no evidence of malfunction was found in any equipment tested.

The investigation of the accident found "deficiencies" in the training and experience of staff in dealing with emergency situations. The cause of the accident was concluded to be driver error due to poor staff training.

One anomaly was that the "Sunflower" display in the cab of the Connex train was showing the all-black "clear" indication (meaning that the last signal which had been passed was displaying a green aspect). However the HSE report concluded that the Automatic Warning System (AWS) on both trains was probably working correctly, and that the shock of the collision had caused the electro-mechanical indicator to change. In any case, even if the AWS had given a wrong indication this would not have absolved[5] the driver of the Connex train of his duty to observe and obey the signals.

The conclusion was that the Train Protection & Warning System might have stopped or at least slowed the Connex train down if it had been installed. The Railway Safety Regulations 1999 were introduced in the August, which stipulated that train protection must be implemented throughout the network by the end of 2003. The regulations stopped short of requiring Automatic Train Protection (ATP) to be installed.

References

  1. Quail Map 5 – England South [page 3] Sept 2002 (Retrieved 26 December 2011)
  2. "London Transport - Tubes, trains, trams". Derelict London.
  3. Network Rail (April 2001). Southern Zone Sectional Appendix. Module SO. p. 1/35 SO130. (Retrieved 22 December 2011)
  4. Quail Map 5 – England South [page 3] Sept 2002 (Retrieved 22 December 2011)
  5. Drivers' Rule Book: "The automatic warning system (AWS) does not relieve you of your responsibility for observing signals and speed restrictions". GE/RT8000 Rule Book Module S3: Section 1 (PDF).
  • Railways Archive – Accident at Spa Road (Summary)
  • Railways Archive – Report by the Health and Safety Executive's Railway Inspectorate into the train accident at Spa Road (PDF)


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.