Wellington Town Hall

The Wellington Town Hall (Māori: Te Whare Whakarauika) is a concert hall and part of the municipal complex in Wellington, New Zealand, which opened in December 1904. It has been closed to the public since the 2013 Seddon earthquake, and it is currently undergoing extensive strengthening work.[1]

Wellington Town Hall
Te Whare Whakarauika  (Māori)
The Town Hall from Civic Square
General information
TypeTown hall, concert hall
Architectural styleNeo-Renaissance
LocationCorner of Wakefield Street and Civic Square, Wellington
Coordinates41°17′21″S 174°46′38″E
Current tenantsWellington City Council
Construction started1901
Completed1904
OwnerWellington City
Design and construction
ArchitectJoshua Charlesworth
Main contractorPaterson, Martin and Hunter
Designated11 December 2003
Reference no.3275

History

The Town Hall in 1913 (centre back). Visible is the clock tower which was removed in 1934.
The Town Hall from Wakefield Street
The interior of the Town Hall

The foundation stone for the building was laid in 1901 and construction began the following year. It was officially opened on 7 December 1904.[2]

The Town Hall was originally fronted (on the Cuba Street side) with a Roman styled portico and a 150-foot clock tower. A clock was not installed in the tower until 1922, when John Blundell, owner of The Evening Post newspaper, donated one. In 1934 the tower was removed as a precaution following the 1931 Hawke's Bay earthquake, and the main portico, pediment, balustrade, parapet and bold cornice were also removed. The building was earthquake strengthened in 1943 following an earthquake the previous year. During the strengthening the Corinthian capitals on the exterior were replaced with Tuscan detailing.

The Town Hall may have been a low maintenance priority of councils over the years. By 1973 during a concert (Kenny Rogers and The First Edition) their sound levels caused dust to begin to drift down over the stage. When their music hit a crescendo during the chorus of one piece (may have been Something's Burning), the stage ceiling collapsed on them, dropping pigeon bodies, empty and dead eggs, nesting material and plaster rubble and dust all over the stage and the band's equipment. The concert did continue, with black-dressed stage hands creeping around the stage sweeping up detritus, removing carcasses, and dusting the amplifiers, speaker cases, keyboards, and anything else covered with plaster dust. Shortly after, Wellington citizens began to call for an improved concert venue.[3]

In 1980 the Michael Fowler Centre was built immediately in front of the Town Hall's main entrance in anticipation of the older building's demolition. However the New Zealand Historic Places Trust (since renamed to Heritage New Zealand) persuaded the City Council to retain the Town Hall. In 1989 plans were unveiled to create Civic Square between the town hall and the old city library. As part of this, the Town Hall underwent full refurbishment in 1991–1992. During this process the concert chamber was demolished and replaced with reception rooms.

The main auditorium has been rated one of the best in the world for acoustic quality.[4][5] It has hosted numerous live performances (including The Beatles & The Rolling Stones) as well as fashion shows, debutante balls, political rallies, degree conferrals and at least one episcopal ordination, that of Cardinal John Dew in 1995.[6]

Although the council offices have spread beyond the Town Hall since 1904, until it was closed for earthquake strengthening, the building still housed the offices of the Mayor and Wellington City Council members.

Earthquake strengthening

In 2014, quake strengthening was put on hold by Wellington City Council after cost projections increased from $43 million[7] to $60 million due to unforeseen technical issues.[8] In March 2017 Wellington City Council announced its intention to bring the Town Hall up to 100% of the New Zealand building regulations at a cost of $85 million, with construction to begin in 2018 and an aim to re-open in 2021.[9] As restoration work began further complexities were uncovered, and increasing costs meant that in February 2019 the council extended the budget to $112 million, with an undisclosed amount of additional contingency. The extra work required will include seismic base isolation to better secure the long term future of the building, while delaying the opening by a further two years to 2023.[1]

References

  1. Desmarais, Felix (27 February 2019). "City council votes to allocate $112.4m to Wellington Town Hall project". The Dominion Post. Retrieved 16 September 2019 via Stuff.
  2. "Opening of the Town Hall". The Evening Post. LXVIII (137). 7 December 1904. p. 6. Retrieved 16 September 2019 via Papers Past.
  3. Lynne Street, who attended that concert.
  4. Forbes, Michael (30 May 2016). "Seven years of silence: Wellington Town Hall unlikely to open before 2020". The Dominion Post. Retrieved 16 September 2019 via Stuff.
  5. "Wellington Convention Centre – History of the Town Hall". Archived from the original on 4 February 2004. Retrieved 3 July 2008.
  6. Michael O'Meeghan SM, Steadfast in hope: The Story of the Catholic Archdiocese of Wellington 1850–2000, Catholic Archdiocese of Wellington, Wellington, 2003, pp. 328 and 329.
  7. Chapman, Katie (13 June 2013). "Town Hall to be strengthened". The Dominion Post. Retrieved 16 September 2019 via Stuff.
  8. Burgess, Dave (14 February 2014). "Wellington's $60 million question". The Dominion Post. Retrieved 16 September 2019 via Stuff.
  9. "Improved plan will see Wellington's Town Hall reopened". Wellington City Council. 30 March 2017. Retrieved 1 April 2017.

Sources

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.