Dongdaqiao station

Dongdaqiao (simplified Chinese: 东大桥站; traditional Chinese: 東大橋站; pinyin: Dōngdàqiáo Zhàn) is a station on Line 6 of the Beijing Subway.[1] This station opened on December 30, 2012.[2][3]

Dongdaqiao

东大桥
Platform
LocationEast Workers' Stadium Road (工人体育场东路) / Dongdaqiao Road (东大桥路) and Chaoyangmen Outer Street / North Chaoyang Road (朝阳北路)
Chaoyang District, Beijing
China
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Line 6
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
Disabled accessYes
History
OpenedDecember 30, 2012
Services
Preceding station   Beijing Subway   Following station
towards Jin'an Qiao
Line 6
towards Lucheng
Location
Dongdaqiao
Location in central Beijing

Station Layout

The station has an underground island platform.

Exits

There are 4 exits, lettered A, B, D1, and D2. Exit D1 is accessible.

References

  1. "Archived copy". Archived from the original on 2013-12-24. Retrieved 2013-03-19.CS1 maint: archived copy as title (link)
  2. "Archived copy". Archived from the original on 2012-11-11. Retrieved 2012-12-26.CS1 maint: archived copy as title (link)
  3. 北京四地铁线30日开通 首末车时间确定 (in Chinese). 新京报. Retrieved 26 December 2012.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.